| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC B 748 ANAND NAGAR BAHODAPUR GWALIOR | ₹2.8 Cr | L1 | Accepted-AOC Agreement done as per attached letter. |
| 2 | L2₹2.8 Cr+₹6.6 L (2.39%)Rejected-Finance 133 KASIKHEDI POST TAMOLIYA TEHSIL JEERAPUR DISTT RAJGARH MP 465691 | JEERAPUR | RAJGARH | MADHYA PRADESH | 465691 | ₹2.8 Cr+₹6.6 L (2.39%) | L2 | Rejected-Finance being L2 |
| 3 | L3₹2.9 Cr+₹12.0 L (4.33%)Rejected-Finance | ₹2.9 Cr+₹12.0 L (4.33%) | L3 | Rejected-Finance being L3 |
| 4 | L4₹2.9 Cr+₹16.9 L (6.07%)Rejected-Finance | ₹2.9 Cr+₹16.9 L (6.07%) | L4 | Rejected-Finance being L4 |
| 5 | L5₹3.4 Cr+₹65.1 L (23.4%)Rejected-Finance | ₹3.4 Cr+₹65.1 L (23.4%) | L5 | Rejected-Finance being L5 |
| Sl No | Description | Qty | Unit | SHYAM TRADERS L6 | ANNA CONSTRUCTIONS L3 | KRISHNA ENTERPRISES L1 | RISHABH GURJAR CIVIL CONTRACTOR AND SUPPLIERS L4 | shree balaji construction L2 | VISHWAKARMA ENTERPRISES L7 | SATVEER SINGH CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00ON TURN KEY BASIS Construction of BAKHTUNI TANK PROJECT, in Manasa block of District Neemuch consisting of approximately 345 m long earthen dam and all its components with excavation & construction of Head sluice, Spill & Approach channel, Waste Weir under Unit-I Head work along with excavation, earthwork & lining of Main canal RD 0 to 2100 m and all necessary relevant structures to irrigate 300 Ha. CCA. This activity also Include survey & investigation, geological Investigation, preparation & submission of LA. Cases for Pvt. /Govt./forest land, design, drawing. estimation, DPR submission and its approval from competent authority for both Head work & canal system of BAKHTUNI TANK PROJECT, including maintenance & defect liability period of two years from date of issue of completion certificate. | ||||||||||
| 1.01 | ON TURN KEY BASIS Construction of BAKHTUNI TANK PROJECT, in Manasa block of District Neemuch consisting of approximately 345 m long earthen dam and all its components with excavation & construction of Head sluice, Spill & Approach channel, Waste Weir under Unit-I Head work along with excavation, earthwork & lining of Main canal RD 0 to 2100 m and all necessary relevant structures to irrigate 300 Ha. CCA. This activity also Include survey & investigation, geological Investigation, preparation & submission of LA. Cases for Pvt. /Govt./forest land, design, drawing. estimation, DPR submission and its approval from competent authority for both Head work & canal system of BAKHTUNI TANK PROJECT, including maintenance & defect liability period of two years from date of issue of completion certificate. | 1 | Nos | 3,49,07,488 ₹3,49,07,488 | 2,89,59,541 ₹2,89,59,541 | 2,77,57,084 ₹2,77,57,084 Lowest | 2,94,42,133.6 ₹2,94,42,133.6 | 2,84,20,647.2 ₹2,84,20,647.2 | 30,35,10,152 ₹30,35,10,152 | 3,42,64,032 ₹3,42,64,032 |
Tender Value
₹4.0 Cr
EMD Value
₹4.0 L
Closing Date
27 Feb 2025, 5:30 pmClosed
E.E. WRD. Neemuch
E.E. WRD. Neemuch
Construction of Bakhtuni Tank Project (with Canal).
2025_WRD_398864_1
1126/2024-25/Einc/Etendering/ dt.29-01-2025
Open Tender
Civil Works - Others
Turn-key
365 days
Neemuch
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
₹4.0 L
22 Sept 2025
7 Feb 2025
3 Mar 2025
7 Feb 2025
27 Feb 2025
10 Feb 2025
Amount
ON TURN KEY BASIS Construction of BAKHTUNI TANK PROJECT, in Manasa block of District Neemuch consisting of approximately 345 m long earthen dam and all its components with excavation & construction of Head sluice, Spill & Approach channel, Waste Weir under Unit-I Head work along with excavation, earthwork & lining of Main canal RD 0 to 2100 m and all necessary relevant structures to irrigate 300 Ha. CCA. This activity also Include survey & investigation, geological Investigation, preparation & submission of LA. Cases for Pvt. /Govt./forest land, design, drawing. estimation, DPR submission and its approval from competent authority for both Head work & canal system of BAKHTUNI TANK PROJECT, including maintenance & defect liability period of two years from date of issue of completion certificate.
ON TURN KEY BASIS Construction of BAKHTUNI TANK PROJECT, in Manasa block of District Neemuch consisting of approximately 345 m long earthen dam and all its components with excavation & construction of Head sluice, Spill & Approach channel, Waste Weir under Unit-I Head work along with excavation, earthwork & lining of Main canal RD 0 to 2100 m and all necessary relevant structures to irrigate 300 Ha. CCA. This activity also Include survey & investigation, geological Investigation, preparation & submission of LA. Cases for Pvt. /Govt./forest land, design, drawing. estimation, DPR submission and its approval from competent authority for both Head work & canal system of BAKHTUNI TANK PROJECT, including maintenance & defect liability period of two years from date of issue of completion certificate.
shree balaji construction (BID ID -1205876)
ANNA CONSTRUCTIONS (BID ID -1205993)
RISHABH GURJAR CIVIL CONTRACTOR AND SUPPLIERS (BID ID -1205481)
SATVEER SINGH CONTRACTOR (BID ID -1205496)
SHYAM TRADERS (BID ID -1206206)
VISHWAKARMA ENTERPRISES (BID ID -1206284)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .