Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC 71 SUBHASH MARG HARJINDER NAGAR LAL BANGLA DISTT KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹3.0 L | L1 | Accepted-AOC LOWEST QUOTED RATES |
| 2 | L2₹3.3 L+₹31,752.96 (10.6%)Rejected-Finance LAXMANPURI COLONY NAWABGANJ DISTT BARABANKI | NAWABGANJ | BARABANKI | UTTAR PRADESH | ₹3.3 L+₹31,752.96 (10.6%) | L2 | Rejected-Finance QUOTED RATES GREATER THAN L1 |
| 3 | L3₹3.5 L+₹47,406.08 (15.8%)Rejected-Finance ADD VIKASH BHAWAN ROAD NEAR YADAV MANCH OBERI DISTT BARABANKI | ₹3.5 L+₹47,406.08 (15.8%) | L3 | Rejected-Finance QUOTED RATES GREATER THAN L12 |
| 4 | L4₹3.8 L+₹76,226.72 (25.4%)Rejected-Finance | ₹3.8 L+₹76,226.72 (25.4%) | L4 | Rejected-Finance QUOTED RATES GREATER THAN L13 |
| 5 | L5₹4.2 L+₹1.2 L (40.5%)Rejected-Finance | ₹4.2 L+₹1.2 L (40.5%) | L5 | Rejected-Finance QUOTED RATES GREATER THAN L14 |
| Sl No | Description | Qty | Unit | Ram Asrey L4 | Neeta Verma L5 | SAKSHI ENTERPRISES L2 | M/S NISHI KANT SRIVASTAVA L3 | AAVI INFRA TECH L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance with in major dy by mechnical equipment/machine (ny JCB excavator) having capacity 25 cum/hr lead upto 30 mt and lift upto 1.5 mt as per direction of engineer in charge. | 7,191.2 | Cum | 44.8 ₹3,22,165.76 | 51 ₹3,66,751.2 | 34 ₹2,44,500.8 | 41.6 ₹2,99,153.92 | 32.3 ₹2,32,275.76 Lowest |
| 2.00 | Scraping at existing daula, berm and internal section cutting/filling upto 8 cm including lead upto 30 mt and lift upto 1.5 mt with all labour t&p etc, for proper co,pletion of work as per direction of engineer in charge. | 6,500 | sqm | 5 ₹32,500 | 4 ₹26,000 | 9 ₹58,500 | 3 ₹19,500 Lowest | 5 ₹32,500 |
| 3.00 | Dressing of excavated silt in major dy. Manually labour only excluding mechnical compaction but including manual compaction and dressing to profile with all labour T&P etc, for proper completion of work as per direction of engineer in charge. | 7,191.2 | Cum | 3 ₹21,573.6 Lowest | 4 ₹28,764.8 | 4 ₹28,764.8 | 4 ₹28,764.8 | 4.9 ₹35,236.88 |
Tender Value
₹5.1 L
EMD Value
₹12,000
Closing Date
31 Oct 2025, 10:00 amClosed
EXECUTIVE ENGINEER BDSC BARABANKI
EXECUTIVE ENGINEER BDSC BARABANKI
SILT CLEARANCE OF FATEHPUR DY FROM KM 0.000 TO 9.900
2025_UPIDC_1085205_11
04/EE/2025-26
Open Tender
Civil Works
Item Rate
15 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,151
₹12,000
29 Apr 2026
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BIDDOC04EE202526.pdf
Tender Documents • 2.45 MB
BOQ_1988572.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .