| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹184.0 CrAccepted-AOC | ₹184.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹185.8 Cr+₹1.8 Cr (0.96%)Rejected-AOC | ₹185.8 Cr+₹1.8 Cr (0.96%) | L2 | Rejected-AOC L2 |
| 3 | L3₹191.9 Cr+₹7.9 Cr (4.28%)Rejected-AOC A 177 OKHLA INDUSTRIAL AREA PHASE I NEW DELHI 110020 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110020 | ₹191.9 Cr+₹7.9 Cr (4.28%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical BADRI RAI COMPANY ARUN KUMAR RAI DULIAJAN STATION ROAD P O DULIAJAN P S DULIAJAN DIBRUGARH PIN 786602 | DULIAJAN | DIBRUGARH | ASSAM | 786602 | - | - | Rejected-Technical Does not satisfy similar work experience criteria as provided in NIT. The substantially completed works submitted are not functional. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Does not satisfy evaluation criteria for Time Over Run as provided in NIT. |
| Sl No | Description | Qty | Unit | Ahluwalia Contracts (India) ltd. L3 | Amara Raja Infra Pvt Ltd L2 | SOM Projects Pvt Ltd L1 |
|---|---|---|---|---|---|---|
| 1.00 | Construction of the Project/Work on the Site as covered under Battery Limit drawing and subsequent drawings as per details set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D on EPC mode (Engineering, Procurement & Construction).
Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental there to or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document | 1 | Job | 1,71,95,69,156 ₹1,71,95,69,156 | 1,64,88,77,836 ₹1,64,88,77,836 | 1,52,75,00,000 ₹1,52,75,00,000 Lowest |
| 1.10 | Demolishing of existing Structures/Buildings/Infra falling under Project site or any other structure falling in proposed work are including foundation/electrical item etc, by manually/ mechanical means, on as and where basis and taking away of dismantled/demolished material beyond AAI premises including disposal of un-serviceable material and clearing of site as per direction of Engineer - in - charge.
Note: The above structure shall be handed over by EIC for demolition and dismantling. The serviceable material as obtained from dismantling of such structures shall be taken by the agency and in turn salvage value of the same shall be quoted by agency as credit item under this item. The unserviceable material shall be taken away from airport premises by agency for outside disposal at their own risk & cost. (the cost of dismantling and disposal is included under this item).(Quoted rate shall be reflected in negative(credit) automatically in Amount column) | 1 | Job | 10,00,000 ₹-10,00,000 | 3,00,000 ₹-3,00,000 Lowest | 25,00,000 ₹-25,00,000 |
| 2.00Maintenance of the Constructed Project in accordance with the provisions of this Tender Document and in conformity with the requirements set forth in Schedule-N Performance, SCC for operation and AICMC and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document (quoted rate shall be firm and fixed for operations and AICMC) | ||||||
| 2.01Operational and Service Charges for maintaining of all assets (All civil works but excluding horticulture works) constructed under the project for 07 years including 2 years for Defect liability period. | ||||||
| 2.01 | 1st Year (During DLP) | 1 | Year | 14,54,121.96 ₹13,37,792.2 Lowest | 20,06,880 ₹18,46,329.6 | 86,25,000 ₹79,35,000 |
| 2.01 | 2nd Year (During DLP) | 1 | Year | 16,96,475.63 ₹14,25,039.53 Lowest | 21,39,592 ₹17,97,257.28 | 94,50,000 ₹79,38,000 |
| 2.01 | 1st Year (After DLP) | 1 | Year | 18,17,652.46 ₹13,99,592.39 Lowest | 22,81,593 ₹17,56,826.61 | 1,03,12,500 ₹79,40,625 |
| 2.01 | 2nd Year (After DLP) | 1 | Year | 19,38,829.29 ₹13,76,568.8 Lowest | 24,33,535 ₹17,27,809.85 | 1,11,56,250 ₹79,20,937.5 |
| 2.02 | 3rd Year (After DLP) | 1 | Year | 21,81,182.95 ₹14,17,768.92 Lowest | 25,96,112 ₹16,87,472.8 | 1,21,87,500 ₹79,21,875 |
| 2.02 | 4th Year (After DLP) | 1 | Year | 20,60,006.12 ₹12,36,003.67 Lowest | 27,70,070 ₹16,62,042 | 1,32,00,000 ₹79,20,000 |
Tender Value
₹179.5 Cr
EMD Value
₹4.8 Cr
Closing Date
3 Nov 2025, 6:00 pmClosed
AGM (E-C)
O/o Executive Director (Engg.)-WR and NER, 2nd floor, old AERA Building, Safdarjung Airport, New Delhi-110 003
Expansion of Barapani (Shillong) Airport incl. Rwy Extn., Expansion of TB and Apron and other allied works. SH Expansion of TB, Const. of ESS and other Allied Works (Phase-II) incl. AICMC on EPC mode.
2025_AAI_249026_1
AAI/E-C/NER/Shillong/TB Expn./2025-26
Open Tender
Civil Works - Buildings
EPC Contract
548 days
Shillong (Barapani) Airport
Please refer Tender documents.
23 documents required · 23 mandatory
₹11,800
₹4.8 Cr
New Delhi
28 Jul 2026
17 Sept 2025
10 Nov 2025
17 Sept 2025
3 Nov 2025
27 Oct 2025
17 Sept 2025 - 17 Oct 2025
13 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Construction of the Project/Work on the Site as covered under Battery Limit drawing and subsequent drawings as per details set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D on EPC mode (Engineering, Procurement & Construction).
Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental there to or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document | 1 | Job | - | - |
| 1.1 | Demolishing of existing Structures/Buildings/Infra falling under Project site or any other structure falling in proposed work are including foundation/electrical item etc, by manually/ mechanical means, on as and where basis and taking away of dismantled/demolished material beyond AAI premises including disposal of un-serviceable material and clearing of site as per direction of Engineer - in - charge.
Note: The above structure shall be handed over by EIC for demolition and dismantling. The serviceable material as obtained from dismantling of such structures shall be taken by the agency and in turn salvage value of the same shall be quoted by agency as credit item under this item. The unserviceable material shall be taken away from airport premises by agency for outside disposal at their own risk & cost. (the cost of dismantling and disposal is included under this item).(Quoted rate shall be reflected in negative(credit) automatically in Amount column) | 1 | Job | - | - |
| 0.0 | Maintenance of the Constructed Project in accordance with the provisions of this Tender Document and in conformity with the requirements set forth in Schedule-N Performance, SCC for operation and AICMC and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document (quoted rate shall be firm and fixed for operations and AICMC) | - | - | - | - |
| 2.01 | Operational and Service Charges for maintaining of all assets (All civil works but excluding horticulture works) constructed under the project for 07 years including 2 years for Defect liability period. | - | - | - | - |
| 2.011 | 1st Year (During DLP) | 1 | Year | - | - |
| 2.012 | 2nd Year (During DLP) | 1 | Year | - | - |
| 2.013 | 1st Year (After DLP) | 1 | Year | - | - |
| 2.014 | 2nd Year (After DLP) | 1 | Year | - | - |
| 2.015 | 3rd Year (After DLP) | 1 | Year | - | - |
| 2.016 | 4th Year (After DLP) | 1 | Year | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TD4.pdf
Tender Documents • 23.84 MB
TD3C.pdf
Tender Documents • 10.16 MB
TD2.pdf
Tender Documents • 17.35 MB
TD1.pdf
Tender Documents • 12.46 MB
BOQ_285561.xls
BOQ • 0.32 MB
Corrigendum5.pdf
PDF • 0.32 MB
CORRIGENDUM4.pdf
PDF • 0.32 MB
CORRIGENDUM3.pdf
PDF • 0.85 MB
Corrigendum_2.pdf
PDF • 4.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .