Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹173.8 CrAdmitted-Finance | ₹173.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹179.2 CrAdmitted-Finance | ₹179.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹184.7 CrAdmitted-Finance A 177 OKHLA INDUSTRIAL AREA PHASE I NEW DELHI 110020 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110020 | ₹184.7 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical BADRI RAI COMPANY ARUN KUMAR RAI DULIAJAN STATION ROAD P O DULIAJAN P S DULIAJAN DIBRUGARH PIN 786602 | DULIAJAN | DIBRUGARH | ASSAM | 786602 | - | - | Rejected-Technical Does not satisfy similar work experience criteria as provided in NIT. The substantially completed works submitted are not functional. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Does not satisfy evaluation criteria for Time Over Run as provided in NIT. |
| Sl No | Description | Qty | Unit | Ahluwalia Contracts (India) ltd. L3 | Amara Raja Infra Pvt Ltd L2 | SOM Projects Pvt Ltd L1 |
|---|---|---|---|---|---|---|
| 1.00 | Construction of the Project/Work on the Site as covered under Battery Limit drawing and subsequent drawings as per details set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D on EPC mode (Engineering, Procurement & Construction).
Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental there to or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document | 1 | Job | 1,71,95,69,156 ₹172.0 Cr | 1,64,88,77,836 ₹164.9 Cr | 1,52,75,00,000 ₹152.8 Cr |
| 1.10 | Demolishing of existing Structures/Buildings/Infra falling under Project site or any other structure falling in proposed work are including foundation/electrical item etc, by manually/ mechanical means, on as and where basis and taking away of dismantled/demolished material beyond AAI premises including disposal of un-serviceable material and clearing of site as per direction of Engineer - in - charge.
Note: The above structure shall be handed over by EIC for demolition and dismantling. The serviceable material as obtained from dismantling of such structures shall be taken by the agency and in turn salvage value of the same shall be quoted by agency as credit item under this item. The unserviceable material shall be taken away from airport premises by agency for outside disposal at their own risk & cost. (the cost of dismantling and disposal is included under this item).(Quoted rate shall be reflected in negative(credit) automatically in Amount column) | 1 | Job | 10,00,000 -₹10,00,000 | 3,00,000 -₹3,00,000 | 25,00,000 -₹25,00,000 |
| 2.00Maintenance of the Constructed Project in accordance with the provisions of this Tender Document and in conformity with the requirements set forth in Schedule-N Performance, SCC for operation and AICMC and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document (quoted rate shall be firm and fixed for operations and AICMC) | ||||||
| 2.01Operational and Service Charges for maintaining of all assets (All civil works but excluding horticulture works) constructed under the project for 07 years including 2 years for Defect liability period. | ||||||
| 2.01 | 1st Year (During DLP) | 1 | Year | 14,54,121.96 ₹13.4 L | 20,06,880 ₹18.5 L | 86,25,000 ₹79.3 L |
| 2.01 | 2nd Year (During DLP) | 1 | Year | 16,96,475.63 ₹14.3 L | 21,39,592 ₹18.0 L | 94,50,000 ₹79.4 L |
| 2.01 | 1st Year (After DLP) | 1 | Year | 18,17,652.46 ₹14.0 L | 22,81,593 ₹17.6 L | 1,03,12,500 ₹79.4 L |
| 2.01 | 2nd Year (After DLP) | 1 | Year | 19,38,829.29 ₹13.8 L | 24,33,535 ₹17.3 L | 1,11,56,250 ₹79.2 L |
| 2.02 | 3rd Year (After DLP) | 1 | Year | 21,81,182.95 ₹14.2 L | 25,96,112 ₹16.9 L | 1,21,87,500 ₹79.2 L |
| 2.02 | 4th Year (After DLP) | 1 | Year | 20,60,006.12 ₹12.4 L | 27,70,070 ₹16.6 L | 1,32,00,000 ₹79.2 L |
Updated dates
Tender Value
₹179.5 Cr
EMD Value
₹4.8 Cr
Closing Date
17 Dec 2025, 6:00 pmClosed
AGM (E-C)
O/o Executive Director (Engg.)-WR and NER, 2nd floor, old AERA Building, Safdarjung Airport, New Delhi-110 003
Expansion of Barapani (Shillong) Airport incl. Rwy Extn., Expansion of TB and Apron and other allied works. SH Expansion of TB, Const. of ESS and other Allied Works (Phase-II) incl. AICMC on EPC mode.
2025_AAI_249026_1
AAI/E-C/NER/Shillong/TB Expn./2025-26
Open Tender
Civil Works - Buildings
548 days
Shillong (Barapani) Airport
Please refer Tender documents.
23 documents required · 23 mandatory
₹11,800
₹4.8 Cr
New Delhi
16 Mar 2026
17 Sept 2025
23 Dec 2025
17 Sept 2025
17 Dec 2025
1 Dec 2025
17 Sept 2025 - 17 Oct 2025
13 Oct 2025
Construction of the Project/Work on the Site as covered under Battery Limit drawing and subsequent drawings as per details set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D on EPC mode (Engineering, Procurement & Construction). Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental there to or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document
Operational and Service Charges for maintaining of all assets (All civil works but excluding horticulture works) constructed under the project for 07 years including 2 years for Defect liability period.
1st Year (During DLP)
2nd Year (During DLP)
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
Annual Repair works including preventive maintenance for 5 years after Defect liability period of 2 years (Civil Work) from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
Operational and Service Charges including preventive maintenance, annual maintenance and maintaining all horticulture works constructed under the project for 07 years.
1st Year (DLP)
2nd Year (DLP)
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
Providing manpower for Operation & Services of DG sets, UPS, Transformers, Substation equipments, Internal & external electrical installation, HVAC & BMS, VRV/VRF/standalone AC units, Fire Fighting, Fire alarm System, STP, RO system & water cooler/Drinking water fountain and all other Miscellaneous Electrical & Mechanical equipments and systems provided under the EPC Contract as per standard OEM recommendations, maintenance schedules & practices as per manpower/ shift schedule mentioned in special conditions of contract.
1st Year (DLP)
2nd Year (DLP)
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of all Substation equipments, DG sets along with the UPS, Transformers & all other associated works after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of Internal and External Electrical Installations after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of all Lifts and escalators after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of entire high side and low side HVAC system, BMS, Pressurized mechanical ventilation system, Precision Air Conditioning System etc. associated works, after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of Fire alarm and Detection system, Firefighting package, and associated works, after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of Sewerage Treatment Plant and with RO system, drinking water cooler/Drinking water fountain, VRV/VRF and standalone AC units, Hydropneumatic System and water pumping system, Automatic sliding doors, Air curtains and all other Miscellaneous Electrical & , Mechanical equipments and systems provided under the EPC Contract and its associated works, after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project..
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of AIRPORT SYSTEMS & SECURITY SYSTEMS including Flight Information Display System (FIDS), SCCTV, EPBAX and its associated system after 02 years DLP (02 years of DLP is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of IT SYSTEMS and its associated system after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of Active Networking Components after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All inclusive Comprehensive Maintenance of Passive Cabling Components after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All inclusive Comprehensive Maintenance of Data Center (Server Room) after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
All-inclusive Comprehensive Maintenance of PAVA and its associated system after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.
1st Year (After DLP)
2nd Year (After DLP)
3rd Year (After DLP)
4th Year (After DLP)
5th Year (After DLP)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TD4.pdf
Tender Documents • 23.84 MB
TD3C.pdf
Tender Documents • 10.16 MB
TD2.pdf
Tender Documents • 17.35 MB
TD1.pdf
Tender Documents • 12.46 MB
BOQ_285561.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid