| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.6 L+₹26,989.56 (2.61%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹10.8 L+₹44,934.75 (4.35%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹11.4 L+₹1.0 L (9.98%)Admitted-Finance FLAT NO 5 IIND FLOOR SIGNATURE APARTMENT SECTOR 3A AVAS VIKAS COLONY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical ok |
Tender Value
₹14.4 L
EMD Value
₹1.4 L
Closing Date
20 Mar 2026, 12:00 pmClosed
Chief Engineer
NAGAR NIGAM AGRA
Construction of a drain using RCC from Georges C-1, Shastripuram, Lohamandi Zone, within the boundary extension area, up to the house of Jaipal Chaudhary. (CMNSY Scheme)
2026_DOLBU_1118154_1
18-02-2026/NAGAR NIGAM AGRA/20-03-2026/03
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,360
Nagar Nigam
₹1.4 L
14 May 2026
20 Feb 2026
20 Mar 2026
20 Feb 2026
20 Mar 2026
20 Feb 2026
Dismantling brick work or stone work in lime or Cement mortar and including stacking of material as directed by E/IC with in a distance of 60 meters (200 feet) but Mud Mortar (SI No. 692)
Removle of for Nala/Nali in liquid mud or faul position with special T&P including lead 30 m and lift up to 3.00 m etc. all complete
Excavation in foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. (SI No. 251)
Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 5 Km distance
Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10)
R.C.C. work Providing and laying in position specified grade of R.C.C. Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) (Chapter 5 S.I. No. 5.1.4)
Renforced cement concrete work in walls (any thickness), including attachedplasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struls etc. including cost of centering, shuttering, and excluding Reinforceement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
R.C.C. work Providing and laying in position specified grade of renforced cement concrete Slab including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling).
Providing of bandha for diversion of nala etc. all complete. (NS)
Providing of 32HP diesel pump for dewatering of nala with pump, driver etc. all complete. (NS)
Deduction Cost of old brick
Deduction Cost of old brick bats
Sub Total (A)
Add/Deduction Rs. For Estimate Figure Amount Match
Grand Total
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_2078159.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .