Tender Value
₹82.2 L
EMD Value
₹1.6 L
Closing Date
15 Jul 2026, 3:00 pm
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi.
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi, Basaidarapur Office Complex, New Delhi-110027.
Development of Daryapur Sundala Jhod (Kh. No. 321) in village Daryapur Khurd in Matiala Assembly Constituency-34.
2026_IFC_294997_1
EE/CD-XIX/DB/2026-27/18
Open Tender
Civil Works
120 days
Daryapur Khurd in Matiala Assembly Constituency
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.6 L
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Deployment of Pocklain machine 17.50 M long boom or equivalent/ manual means of otherwise including excavation of work in or under water and/ or foul conditions as existing bridge and disposal of excavated material/ earth within a lead of 50m on the bank of the drain in all kinds of soil i.e. to and fro movement of machine upto site of work complete. | 40 | Hours | 3,380.5 | ₹1,35,220 |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m. All kinds of soil. | 10,531 | Square Metre | 34.15 | ₹3,59,633.65 |
| 3 | Hire charges of JCB machine for demolishing steps, platform coming in the alingment of side drain including making plain undulations as per direction of Engineer-in-Charge. | 120 | Hours | 1,144.45 | ₹1,37,334 |
| 4 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,500 | Kilogram | 172.6 | ₹2,58,900 |
| 5 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar | 11 | Cubic Metre | 2,060.2 | ₹22,662.2 |
| 6 | Brick work with C&D bricks in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse san manufactured by using recycled C&D waste from authorized C&D waste recycling plant all complete as per t direction of Engineer-in-charge. | 68 | Cubic Metre | 7,931.05 | ₹5,39,311.4 |
| 7 | Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : Red sand stone - exposed face fine dressed with rough backing. 30 mm thick | 229 | Square Metre | 5,295.9 | ₹12,12,761.1 |
| 8 | Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : Red sand stone - Exposed face machine cut and table rubbed with rough backing. 30 mm thick | 82 | Square Metre | 5,722.6 | ₹4,69,253.2 |
| 9 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:1½:3 (1 cement : 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (10357.55-942.35 = 9415.20) | 50 | Cubic Metre | 9,415.2 | ₹4,70,760 |
| 10 | Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site. | 52 | Cubic Metre | 995.85 | ₹51,784.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.72 MB
BOQ_392448.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid