| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Finance | ₹13.0 L | L1 | Admitted-Finance |
| 2 | L2₹13.6 LAdmitted-Finance | ₹13.6 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | WORKS CONTRACT S FRANCIS L1 | wilson L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10 | 31 | m³ | 246 ₹7,626 | 255.84 ₹7,931.04 |
| 2.00 | Supply, collection and filling in Foundation and Basement with Crushed stone Sand (MSand) from approved quarry including all cost and conveyance to site, stacking them on road side to departmental gauge for the take premeasurement. Each layer not more than 15cm thick and consolidation properly etc complete. M Sand Filling | 5 | m³ | 1,637 ₹8,185 | 1,702.48 ₹8,512.40 |
| 3.00 | Plain Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 9 | m³ | 5,231 ₹47,079 | 5,440.24 ₹48,962.16 |
| 4.00Supplying and errecting steel centering including necessary supports for plain surfaces for Reinforced Cement Concrete works such as Column footing, Column pedestals, plinth beams, grade beams, staircase steps, etc which requires only nominal strutting using mild steel sheets of size 90mm x60mm and 10Bg stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm center to center or at suitable intervals etc complete in all floors Complying with standard Specification( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII | |||||
| 5.00 | Footing, Grade Beam | 46 | m² | 459 ₹21,114 | 477.36 ₹21,958.56 |
| 6.00 | Beam Rcc Slab | 62 | m² | 1,023 ₹63,426 | 1,063.92 ₹65,963.04 |
| 7.00 | Column 0.23x0.30m | 32 | m² | 1,227 ₹39,264 | 1,276.08 ₹40,834.56 |
| 8.00Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | |||||
| 9.00 | Upto Basement | 9 | m³ | 8,227 ₹74,043 | 8,556.08 ₹77,004.72 |
| 10.00 | Ground Floor | 13 | m³ | 8,359 ₹1.1 L | 8,693.36 ₹1.1 L |
Tender Value
₹16.6 L
EMD Value
₹16,650
Closing Date
20 Aug 2025, 3:00 pmClosed
Executive Officer
Reethapuram Town Panchayat
Construction Of New Anganwadi Building at Erisanapallin Reethapuram Town Panchayat
2025_DTP_589967_1
99/2025/A1
Open Tender
Civil Works - Buildings
90 days
Reethapuram Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,650
18 Mar 2026
7 Aug 2025
20 Aug 2025
7 Aug 2025
20 Aug 2025
7 Aug 2025
stage.html
html • 0.03 MB
techsummary_704739.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Bidanganwadi.pdf
Tender Documents • 0.24 MB
BOQ_704739.xls
BOQ • 0.32 MB