Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.7 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹15.2 Cr+₹1.4 Cr (10.5%)Admitted-Finance 4TH FLOOR CHINAR COMMERCIAL COMPLEX BUND RESIDENCY ROAD SRINAGAR 190001 KASHMIR | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L2 | Admitted-Finance | ||
| 3 | L3₹15.7 Cr+₹2.0 Cr (14.3%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹18.4 Cr
EMD Value
₹36.8 L
Closing Date
27 Oct 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE Engineer RNB COnst Division no. Ist Sgr
EXECUTIVE Engineer RNB COnst Division no. Ist Sgr
Construction of Transit accommodation for Kashmiri Migrant Employees at Zewan Srinagar Gplus 5 Block 19 to 24
2022_PWDJK_191953_4
Nit-80 ofRand B/9123-39/2022-23 dtd.11-10-2022
Open Tender
Civil Works
Percentage
720 days
Zewan Srinagar.
as per Nit
9 documents required · 9 mandatory
₹11,000
Execiutive Engineer RNb Constr Divn No. ISt Sgr
₹36.8 L
Chief Engineer PWD RNB Kashmir
18 Nov 2022
12 Oct 2022
28 Oct 2022
12 Oct 2022
27 Oct 2022
14 Oct 2022
13 Oct 2022
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | |||||
| 1.1 | a) All kinds of soil. | 2,067 | Cum | 225.3 | ₹4,65,695.1 |
| 1.2 | b) Ordinary rock. | 885.84 | Cum | 432.9 | ₹3,83,480.14 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 3,090 | Cum | 164.3 | ₹5,07,687 |
| 3 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge. | 1,476.42 | Cum | 191.58 | ₹2,82,852.54 |
| 4 | Supplying and laying of Nallah Dry stone soling hand packed tightly including ramming, watering and filling of interstices including all carriages complete. | 257.58 | Cum | 789.47 | ₹2,03,351.68 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) complete all inclusive. | 269.1 | Cum | 4,563.94 | ₹12,28,156.25 |
| 6 | Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) Crushed including curing but excluding the cost of centering, shuttering, finishing and reinforcement- All works from plinth level upto required floor level complete all inclusive. | 2,011.5 | Cum | 6,831.93 | ₹1,37,42,427.2 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) complete all inclusive. | 1,303.56 | Cum | 8,615.65 | ₹1,12,31,016.71 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete all inclusive. | 179.7 | Cum | 5,029.47 | ₹9,03,795.76 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 1.18 MB
Tendernotice_3.pdf
PDF • 0.52 MB
BOQ_501418.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .