| Sl No | Description | Qty | Unit | Shabir Ahmed & Sons L3 | Saleem Raza Wani L4 | M/S BRIGHT WAVE L2 | TOHEED ALAM L1 |
|---|---|---|---|---|---|---|---|
| 1.00AUGMENTATION OF 250 KVA DISTRIBUTION SUB STATION AT CHAKKA TO 400 KVA IN CITY-II FEEDER and AUGMENTATION/IMPROVEMENT OF 100KVA SUB STATION CHARO CHAKKA UNDER UT CAPEX in SD-Bhaderwah.( All items are SITC) | |||||||
| 2.00 | 400 KVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound)and with LV Cable Box having detachable Aluminium Gland plate | 1 | No | 7,01,150 ₹7,01,150 Lowest | 7,50,000 ₹7,50,000 | 7,50,000 ₹7,50,000 | 7,60,000 ₹7,60,000 |
| 3.00 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 2 | Set | 4,000 ₹8,000 | 4,000 ₹8,000 | 2,500 ₹5,000 Lowest | 4,000 ₹8,000 |
| 4.00 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 2 | Set | 7,500 ₹15,000 | 10,000 ₹20,000 | 12,500 ₹25,000 | 4,000 ₹8,000 Lowest |
| 5.00 | 11 kV Horn Gap Fuse Set 3 Phase 200A | 2 | Set | 3,800 ₹7,600 | 5,000 ₹10,000 | 3,000 ₹6,000 Lowest | 4,000 ₹8,000 |
| 6.00 | 9 Mtr. Long Pole( ST-410 SP33) | 6 | Nos | 18,500 ₹1,11,000 | 18,000 ₹1,08,000 | 18,500 ₹1,11,000 | 15,500 ₹93,000 Lowest |
| 7.00 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 6 | Nos | 750 ₹4,500 | 350 ₹2,100 | 300 ₹1,800 Lowest | 400 ₹2,400 |
| 8.00 | GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn gap | 340 | Kgs | 120 ₹40,800 Lowest | 150 ₹51,000 | 130 ₹44,200 | 130 ₹44,200 |
| 9.00 | Nuts and Bolts. | 35 | Kgs | 90 ₹3,150 Lowest | 140 ₹4,900 | 130 ₹4,550 | 130 ₹4,550 |
| 10.00 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 6 | Nos | 1,550 ₹9,300 Lowest | 2,000 ₹12,000 | 3,500 ₹21,000 | 4,000 ₹24,000 |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
24 Sept 2026, 4:00 pmClosed
XEN ED Doda
ED DODA
AUGMENTATION OF 250 KVA DISTRIBUTION SUB STATION AT CHAKKA TO 400 KVA IN CITY-II FEEDER and AUGMENTATION/IMPROVEMENT OF 100KVA SUB STATION CHARO CHAKKA UNDER UT CAPEX in SD-Bhaderwah
2026_PDD_324818_1
ED Doda/JPDCL/67 of 2026-27
Open Tender
Electrical Works
Turn-key
60 days
ED DODA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
XEN ED-Doda
₹28,000
25 Sept 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | AUGMENTATION OF 250 KVA DISTRIBUTION SUB STATION AT CHAKKA TO 400 KVA IN CITY-II FEEDER and AUGMENTATION/IMPROVEMENT OF 100KVA SUB STATION CHARO CHAKKA UNDER UT CAPEX in SD-Bhaderwah.( All items are SITC) | - | - | - | - |
| 2 | 400 KVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound)and with LV Cable Box having detachable Aluminium Gland plate | 1 | No | - | - |
| 3 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 2 | Set | - | - |
| 4 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 2 | Set | - | - |
| 5 | 11 kV Horn Gap Fuse Set 3 Phase 200A | 2 | Set | - | - |
| 6 | 9 Mtr. Long Pole( ST-410 SP33) | 6 | Nos | - | - |
| 7 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 6 | Nos | - | - |
| 8 | GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn gap | 340 | Kgs | - | - |
| 9 | Nuts and Bolts. | 35 | Kgs | - | - |
| 10 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 6 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.92 MB
Tendernotice_3.pdf
PDF • 7.52 MB
BOQ_1096085.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .