Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 LAccepted-AOC | ₹41.5 L Quoted ₹42.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹43.5 LRejected-AOC FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | ₹43.5 L | L2 | Rejected-AOC Rejected other than L1 |
| 3 | L3₹43.9 LRejected-AOC | ₹43.9 L | L3 | Rejected-AOC Rejected other than L1 |
| 4 | L4₹44.3 LRejected-AOC G 58 KIRAN GARDEN UTTAM NAGAR NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | ₹44.3 L | L4 | Rejected-AOC Rejected other than L1 |
| 5 | Rejected-Technical 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | - | - | Rejected-Technical No, valid documents not uploaded. |
| Sl No | Description | Qty | Unit | Sumit Enterprises L4 | BRIJ MOHAN LAL AND CO. L2 | YANSHIKA SECURITY SERVICES L1 | GARG TRADERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule-A | |||||||
| 1.01Desludging the following existing chambers and getting out the mud, sulphates & grit through sucking super soccer machine and depositing to a distance exceeding 1.5 KM out side defence land and washing with clean water and bleaching powder after cleaning with wire brush in side area properlly and applying two coats of white wash on walls and floor of sump complete all as as specified and as directed by Engr-in-charge. and reuse for proper functioning complete all as specified and as directed. Note: Pumping out sludge water from MBBR tank by using diesel engine operated pump is to be arranged by contractor. Note-cleaning shall be carried out in every 03 Months total 03 times during the contract | |||||||
| 1.02 | Sewage well | 6 | Each job | 25,120 ₹1,50,720 | 20,000 ₹1,20,000 Lowest | 35,000 ₹2,10,000 | 30,000 ₹1,80,000 |
| 1.03 | Filter Feed tank | 6 | Each job | 22,010 ₹1,32,060 | 6,000 ₹36,000 Lowest | 15,000 ₹90,000 | 25,000 ₹1,50,000 |
| 1.04 | MBBR tank | 6 | Each job | 23,800 ₹1,42,800 | 6,000 ₹36,000 Lowest | 15,000 ₹90,000 | 20,000 ₹1,20,000 |
| 1.05 | Tube Settler Tank | 6 | Each job | 25,010 ₹1,50,060 | 3,000 ₹18,000 | 2,500 ₹15,000 Lowest | 25,000 ₹1,50,000 |
| 1.06 | Chlorine tank | 6 | Each job | 21,107 ₹1,26,642 | 1,500 ₹9,000 | 1,100 ₹6,600 Lowest | 30,000 ₹1,80,000 |
| 1.07 | Treated water tank | 6 | Each job | 31,000 ₹1,86,000 | 1,500 ₹9,000 | 1,100 ₹6,600 Lowest | 10,000 ₹60,000 |
| 1.08 | Collection tank (04 Nos) | 6 | Each job | 29,500 ₹1,77,000 | 1,500 ₹9,000 | 1,000 ₹6,000 Lowest | 35,000 ₹2,10,000 |
| 1.09 | Screen Chamber | 6 | Each job | 29,020 ₹1,74,120 | 1,500 ₹9,000 | 1,000 ₹6,000 Lowest | 7,000 ₹42,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
1 Jul 2026, 6:00 pmClosed
GE (AF) Gurgaon No 1
GE (AF) Gurgaon No 1 Near Atul Kataria Chowk Gurgaon-122005
CA NO. GE AF NO.1 / GUR-54 / 2026-27 REPAIR/ MAINT OF SEWAGE TREATMENT PLANT, 200 KLD 250 KLD, SEWAGE SUPPLY LINE, AMC OF RO PLANT CAPACITY OF 250, 750LPH, EXTERNAL WATER SUPPLY,BOREWELL LINE, OTHER CONNECTED WKS AT 13BRD,27ED , 31MCU AT PALAM
2026_MES_771009_1
GE(AF) No 1/GUR-54/2026-27
Open Tender
Miscellaneous Works
Item Rate
270 days
GE (AF) Gurgaon No 1
ALL AS PER NIT
10 documents required · 10 mandatory
₹500
GE (AF) Gurgaon No 1
₹90,000
Yes
14 Aug 2026
10 Jun 2026
3 Jul 2026
10 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule-A | |||||
| 1.01 | Desludging the following existing chambers and getting out the mud, sulphates & grit through sucking super soccer machine and depositing to a distance exceeding 1.5 KM out side defence land and washing with clean water and bleaching powder after cleaning with wire brush in side area properlly and applying two coats of white wash on walls and floor of sump complete all as as specified and as directed by Engr-in-charge. and reuse for proper functioning complete all as specified and as directed. Note: Pumping out sludge water from MBBR tank by using diesel engine operated pump is to be arranged by contractor.
Note-cleaning shall be carried out in every 03 Months total 03 times during the contract | - | - | - | - |
| 1.02 | Sewage well | 6 | Each job | - | - |
| 1.03 | Filter Feed tank | 6 | Each job | - | - |
| 1.04 | MBBR tank | 6 | Each job | - | - |
| 1.05 | Tube Settler Tank | 6 | Each job | - | - |
| 1.06 | Chlorine tank | 6 | Each job | - | - |
| 1.07 | Treated water tank | 6 | Each job | - | - |
| 1.08 | Collection tank (04 Nos) | 6 | Each job | - | - |
| 1.09 | Screen Chamber | 6 | Each job | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_863399.xls
BOQ • 2.97 MB
TenderDocument54.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].