EE PD PWD Bulandshahar
EE PD PWD Bulandshahar
Reconstruction of the damaged boundary wall at the DM Colony in District Bulandshahr
2026_CEMRT_1184021_7
5730/1A Dt. 29.08.2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Bulandshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹856
₹95,000
Yes
EE PD PWD Bulandshahar
15 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
15 Sept 2026 - 16 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M.& lead upto 30 M. & including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth & removal & disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M.from the foundation trenches.including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST | 74 | Cum | 100 | ₹7,400 |
| 2 | Cement concrete with 4cm (1/2") gauge approved stone ballast, approved coarse sand, cement in the proportion 6:3:1 including supply of all materials,labour,T&P etc. required for proper completion of the work. .including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.As per DSR 4.1.6 But Excluding GST | 7.65 | Cum | 5,400 | ₹41,310 |
| 3 | Brick work in 1:4 cement coarse sand (of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials,labour,T&P etc. required for proper completion of the work. Including all type of taxes, octroi, toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.As per DSR 6.2.1 .But Excluding GST | 17.4 | Cum | 5,350 | ₹93,090 |
| 4 | Brick work in 1:4 cement & coarse sand mortar in Super Structure including supply of all materials labour,T&P etc. .including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.As per DSR 6.4.1 But Excluding GST | 20.7 | Cum | 7,050 | ₹1,45,935 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement .including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.:As per DSR 5.2.2 But Excluding GST | 27 | Cum | 8,150 | ₹2,20,050 |
| 6 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape & including supply of steel & its wastage, bend, hooks,& authorised overlapping shall be measured and including cost of binding wire..including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST | 37 | Qtl | 7,080 | ₹2,61,960 |
| 7 | 12 mm cement plaster on brick wall of mix : 1:6 (1 cement: 6 Coarse sand).Including all type of taxes, octroi,toll taxes,labour cess,cost of all material, labour T&P etc required for proper completion of work as per Direction of E/I.But excluding GST. .including all type of taxes,octroi,toll taxes,labour cess ,cost of all material, labour T&P etc required for proper completion of work as per Direction of E/I.As per DSR-13.4.2 But Excluding GST | 202 | Sqm | 259 | ₹52,318 |
| 8 | Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over & including priming coat of exterior primer applied @ 2.20 kg/10 sqm..including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.As Per DSR 13.48.1 But Excluding GST | 202 | Sqm | 145 | ₹29,290 |
| 9 | Steel work welded in built up sections/ framed work, including cutting,hoisting,fixing in position & applying a priming coat of approved steel primer using structural steel etc.as required.In stringers,treads,landings etc.of stair cases, including use of chequered plate wherever required,all complete. .including all type of taxes,octroi, toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I. As Per DSR 10.15.1But Excluding GST | 650 | Kg | 145 | ₹94,250 |
| 10 | Painting with synthetic enamel paint of approved brand & manufacture to give an even shade.Two or more coats on new work. .including all type of taxes,octroi,toll taxes, labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.As per DSR 13.62.1 But Excluding GST | 15 | Sqm | 170 | ₹2,550 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_2227138.xls
BOQ • 0.92 MB
T1.pdf
Tender Documents • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .