Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-Finance | ₹7.4 L | L1 | Accepted-Finance SELECTED AS LOWEST QUOTED BIDDER |
| 2 | L2₹7.9 LRejected-Finance | ₹7.9 L | L2 | Rejected-Finance NOT SELECTED |
| 3 | L3₹8.0 LRejected-Finance | ₹8.0 L | L3 | Rejected-Finance NOT SELECTED |
| 4 | L4₹8.1 LRejected-Finance | ₹8.1 L | L4 | Rejected-Finance NOT SELECTED |
| 5 | L5₹8.3 LRejected-Finance AT P O TOPE P S ATTABIRA DIST BARGARH | BARGARH | ODISHA | 768027 | ₹8.3 L | L5 | Rejected-Finance NOT SELECTED |
Tender Value
₹9.8 L
EMD Value
₹9,823
Closing Date
11 May 2026, 5:00 pmClosed
SE, BID, BURLA
O/O THE SE, BID, BURLA
Construction of both side CC Guard wall with bed lining in between RD 1583m to 1823m of Khirapali Distributary off-taking at RD 20040m of Attabira Branch Canal for the year 2026-27
2026_CEBBU_128621_1
BID-01(9 OF 18)/26-27
Open Tender
Civil Works - Canal
45 days
BURLA
REFER DTCN
2 documents required · 2 mandatory
₹4,000
₹9,823
Yes
22 Jun 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
30 Apr 2026 - 11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork exavation in all kind of soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge | - | Cum | 276.9 | - |
| 2 | Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. | 26.49 | Cum | 714.6 | ₹18,929.75 |
| 3 | C.C. / R.C.C. works of M-15 grade with 20mm. and down grade black hard granite Crusher broken stone chips including hoisting and laying over prepared surface with ramming and including cost, conveyance and royalty of all materials and curing upto required period etc. complete and as per direction of the Engineer-in-Charge. | 133.68 | Cum | 5,879.8 | ₹7,86,011.66 |
| 4 | Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge | 471.02 | Sqm | 248.7 | ₹1,17,142.67 |
| 5 | Filling in foundation and Plinth with excavated materials incluiding watering ,ramming etc complete as per direction of Engineer in charge | 56.98 | Cum | 153.8 | ₹8,763.52 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_589160.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.50 MB
DTCN9.pdf
Tender Documents • 2.48 MB
BOQ_589160.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid