| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 CrAccepted-Finance | L1 | Accepted-Finance accepted | |
| 2 | L2₹8.3 Cr+₹49.2 L (6.32%)Rejected-Finance | L2 | Rejected-Finance rejected | |
| 3 | L3₹8.5 Cr+₹69.3 L (8.91%)Rejected-Finance DAM ROAD TALWARA TOWNSHIP DISTT HOSHIARPUR PB | L3 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | National India Construction Co. L2 | S.k.sharma contractor and engineer L3 | P C Construction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs. In pick and jumper work in all lead and lift as per the direction of engineer in charge. | 199.44 | Cum | 750 ₹1,49,580 | 790 ₹1,57,557.6 | 526 ₹1,04,905.44 Lowest |
| 2.00 | Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling / wedging out of hard /soft rock including dewatering in saturated soil up to all leads and lifts stacking the excavated soil / materials not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15 centimeter layers when required into plinths side of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge. | 1,069.89 | Cum | 950 ₹10,16,395.5 | 960 ₹10,27,094.4 | 865 ₹9,25,454.85 Lowest |
| 3.00 | Excavation in earth work and disposal of all excavated earth such as pick work , jumper work , blasting work in hard/ soft rock, including dewatering in saturated soil upto all leads and liftsdisposed earth to be levelled and neately dressed within all leads and lifts as per the driction of Engineer-in Charge. (for field channels) | 412.84 | Cum | 750 ₹3,09,630 | 760 ₹3,13,758.4 | 595 ₹2,45,639.8 Lowest |
| 4.00 | Excavation in drains and Channel etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling / wedging out of hard /soft rock including dressing of side and bed and disposing of excavated earth up to all leads and lifts and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge. (for Main channels) | 3,414.34 | Cum | 810 ₹27,65,615.4 | 830 ₹28,33,902.2 | 690 ₹23,55,894.6 Lowest |
| 5.00 | Providing and laying Cement Concrete work 1:6:12(1cement :6sand : 12graded stone aggregate 40mm nominal size) & curing complete excluding the cost of form work in foundation & Plinth | 6.75 | Cum | 10,900 ₹73,575 | 11,100 ₹74,925 | 9,800 ₹66,150 Lowest |
| 6.00 | Providing and laying cement concrete 1:5:10 with 15% plum ( 1 cement : 5sand : 10 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | 512.54 | Cum | 12,100 ₹62,01,734 | 12,500 ₹64,06,750 | 11,400 ₹58,42,956 Lowest |
| 7.00 | Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | 579.16 | Cum | 13,200 ₹76,44,912 | 13,500 ₹78,18,660 | 11,800 ₹68,34,088 Lowest |
| 8.00 | Providing and laying cement concrete 1:3:6 ( 1 cement: 3 approved sand : 6 approved graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 218.12 | Cum | 13,400 ₹29,22,808 | 13,600 ₹29,66,432 | 12,400 ₹27,04,688 Lowest |
| 9.00 | Providing and laying cement concrete 1:3:6 ( 1 cement: 3 approved sand : 6 approved graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 14.24 | Cum | 13,600 ₹1,93,664 | 13,800 ₹1,96,512 | 12,200 ₹1,73,728 Lowest |
| 10.00Providing and laying cement concrete work 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | ||||||
Tender Value
₹7.5 Cr
EMD Value
₹8.3 L
Closing Date
24 Apr 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION CHOWARI
Please refer to NIT document uploaded herewith
2026_HPIPH_134471_1
NIT NO 872-971 DATED 16-04-2026
Open Tender
Civil Works - Water Works
Item Rate
365 days
CHOWARI CHAMBA HP
Please refer Tender documents.
10 documents required · 10 mandatory
₹10,000
EE CHOWARI
₹8.3 L
Oo the Chief Engineer Dharamshala Zone
23 Sept 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
24 Apr 2026
17 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting in earth work and disposal of excavated earth upto a lead of 20 mtrs. In pick and jumper work in all lead and lift as per the direction of engineer in charge. | |||||
| 2Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling / wedging out of hard /soft rock including dewatering in saturated soil up to all leads and lifts stacking the excavated soil / materials not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15 centimeter layers when required into plinths side of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge. | |||||
| 3Excavation in earth work and disposal of all excavated earth such as pick work , jumper work , blasting work in hard/ soft rock, including dewatering in saturated soil upto all leads and liftsdisposed earth to be levelled and neately dressed within all leads and lifts as per the driction of Engineer-in Charge. (for field channels) | |||||
| 4Excavation in drains and Channel etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling / wedging out of hard /soft rock including dressing of side and bed and disposing of excavated earth up to all leads and lifts and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge. (for Main channels) | |||||
| 5Providing and laying Cement Concrete work 1:6:12(1cement :6sand : 12graded stone aggregate 40mm nominal size) & curing complete excluding the cost of form work in foundation & Plinth | |||||
| 6Providing and laying cement concrete 1:5:10 with 15% plum ( 1 cement : 5sand : 10 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | |||||
| 7Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge. | |||||
| 8Providing and laying cement concrete 1:3:6 ( 1 cement: 3 approved sand : 6 approved graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | |||||
| 9Providing and laying cement concrete 1:3:6 ( 1 cement: 3 approved sand : 6 approved graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | |||||
| 10Providing and laying cement concrete work 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
AC.pdf
Additional Documents • 0.28 MB
BOQ_198940.xls
BOQ • 0.30 MB
F6.pdf
Tender Documents • 0.45 MB
F8.pdf
Tender Documents • 1.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .