Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC MUKHILISHPUR ROAD INDUSTRIAL STATE KAILASH NAGAR DISTT SANT KABIR NAGAR UP 272175 | KAILASH NAGAR | SANT KABIR NAGAR | UP | 272175 | ₹1.0 Cr | L1 | Accepted-AOC R |
| 2 | L2₹1.1 CrRejected-Finance GRAM USKA KALA POHTAH BANIYABARI DISTRICT SANT KABIR NAGAR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.1 Cr | L2 | Rejected-Finance R |
| 3 | Rejected-Technical VILL POST CHANDHAR SANTKABIR NAGAR 272165 | SANT KABIR NAGAR | SANT KABIR NAGAR | UTTAR PRADESH | 272165 | - | - | Rejected-Technical RBMC |
| 4 | Rejected-Technical | - | - | Rejected-Technical RBMC |
Updated dates
Tender Value
₹1.1 Cr
EMD Value
₹7.4 L
Closing Date
5 Dec 2025, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
NEW CONSTRUCTION WORK OF SHIVSHANKARPUR TO SIERRA SANTHA ITIHIYA MAA MANDIR LINK ROAD
2025_CEUBZ_1092625_2
6623/4E-NIVIDA-BASTI CIRCLE/25 DATED-07-11-2025
Open Tender
Civil Works - Roads
180 days
BASTI
mbd
2 documents required · 2 mandatory
₹2,714
Yes
₹7.4 L
Yes
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
23 Mar 2026
27 Nov 2025
5 Dec 2025
27 Nov 2025
5 Dec 2025
27 Nov 2025
29 Nov 2025
Earth Work Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not not exceding 0.50 mt. in depth and work in embankmet to be n 20 cm. layers includding ramming and dressing the surface to required level and slope and also including 1.5 mt. lift and 30 mt. lead as per SL. No.253 Embankment work. Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
GSB Providing and Laying 12.50/11.00 cm compacted thickness granular sub-base (G.S.B.) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Speicification Clause 401 . as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
WBM G-2 Providing and laying 7.50/10.00cm compacted thickness of stone aggregates of specific sizes 45-63 mm of water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone dust to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
WBM G-3 Providing and laying 7.50 cm compacted thickness of stone aggregates of specific sizes 22.4-53 mm of water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone dust to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -3 as per technical specification clause 405. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Primer coat Providing and applying Primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer using mechanical means. As per technical specification clause 502. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Tack Coat- Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 3.00 kg/10 sqm on the prepared bituminous surface Cleaned with Hydraulic broom as per Technical Specification Clause 503..as per Technical Specification Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Premix Carpet- Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Seal Coat- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 Complete in all aspects or as per direction of E/A (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Materini & T&P.)
Brick edging on both sides of the road of first class bricks 8 cm (3'') wide and 12 cm. ( 4.5") deep laid with mud mortar including labour & supply of bricks finish to the required templeate and in proper alignment and also including dressing ramming the excavated earth Complete in all aspects or as per direction of E/1 (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Materini & T&P.)
Earth work in patries with ordinary soil (loam,clay and sand) excavation to be in the form of regular pits not exceeding 50 cm in depth and earth work in embankment to be in 20 cm layers including the ramming and dressing the surface to required levels, slopes and also including 1.5 m lift and 30 m lead the earth form cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by the Engineer-In-Charge including mechanically compaction without royalty as per ( S.I. No. 253) Complete in all aspects or as per direction of E/1 (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Materini & T&P.)
Hume Pipe Culvert 600 mm Dia Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.5 metre (5 fts) and lead upto 30m (100 fts) & including filling watering and ramming of excavation earth into the trenches or into the space between the building and the sides of foundation trenches or into the space between the building and the earth as directed by the Engineer-in-charge upto a distance of 30M (100 fts) from the foundation trenches etc. As per SI Ni. 251 in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Cement Concrete with 4 cm. (1½") gauge approved Bricks ballast ,approved coarse sand and cement in the proportions or 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion of the work with proper curing.(SI No-275) in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
First class brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials , labour and T&P etc. required for proper completion of the work with proper curing.SI No-305 in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Struck pointing with cement mortar consisiting of 1 part cement and 2 part fine sand of F.M 1.25 including supply of all materials labour and T&P etc required for proper completion of the work with proper curing SI No-574 in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Supply of NP-3 Hume pipes in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Laying of NP-3 Hume pipes in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Supply and fixing of iron Sign Board in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Supply and fixing of Km.Hect etc Stone in Complete in all aspects or as per direction of E/l (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
GSB Providing and Laying 12.50/11.00 cm compacted thickness granular sub-base (G.S.B.) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Speicification Clause 401 . as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
WBM G-3 Providing and laying 7.50 cm compacted thickness of stone aggregates of specific sizes 22.4-53 mm of water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone dust to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -3 as per technical specification clause 405. as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Cement Concrete Pavement Construction of un-reinforced, dwel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous peration including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per design. including labour ces with proper curing Complete in all aspects or as per direction of E/1 (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Materini & T&P.)
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
T2.pdf
Tender Documents • 4.28 MB
BOQ_2007503.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid