Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | +0.00% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹5,367 (2.75%)Admitted-Finance 14 SANTOSH ROY ROAD MAIL 7 SANTOSH ROY ROAD KOLKATA 700008 | KOLKATA | WEST BENGAL | 700008 | +2.75% | ₹2.0 L+₹5,367 (2.75%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹6,030 (3.09%)Admitted-Finance 17B GOBINDA GHOSHAL LANE KOLKATA 700025 | KOLKATA | WEST BENGAL | 700025 | +3.09% | ₹2.0 L+₹6,030 (3.09%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
5 Sept 2026, 12:00 pmClosed
EE-X
28, P.A SHAH ROAD, KOL-33
LEVELING OF ASPHALTUM ROAD SURFACE AT DIFFERENT PLACES OF JHEEL ROAD.SAHID NAGAR RD,SELIMPORE RD AND BYE LANE ETC IN WARD NO.092. BR-X.
2026_KMC_1039175_1
EEC/092/011/2026-2027
Open Tender
CIVIL WORKS
Percentage
90 days
WARD-092
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,000
10 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
5 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 9.62 | SQM | 14.4 | ₹138.53 |
| 2 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) By manual means : (i) From 25 mm to 50 mm thick. | 1,123.63 | SQM | 22.6 | ₹25,394.04 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 9.62 | SQM | 361 | ₹3,472.82 |
| 4 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 20 | MTR | 8.17 | ₹163.4 |
| 5 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 20 | MTR | 8.17 | ₹163.4 |
| 6 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 20 | MTR | 18.24 | ₹364.8 |
| 7 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 20 | MTR | 21.34 | ₹426.8 |
| 8 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion | 0.68 | M3 | 4,572 | ₹3,086.1 |
| 9 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13)) | 10 | EA | 1,507.28 | ₹15,072.8 |
| 10 | Raising manhole cover and frame with CBW (1:4), 250mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. | 10 | EA | 1,793.55 | ₹17,935.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2552258.xls
BOQ • 0.27 MB
TF.pdf
Tender Documents • 0.59 MB
civil_new.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .