Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.3 L
EMD Value
₹14,620
Closing Date
27 Jul 2020, 4:00 pmClosed
Er.Rajesh Kumar Sumbria
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2020_PWDJK_100559_6
e-NIT No.18 of 2020-21 dated 15-07-2020.
Open Tender
Civil Works
Item Rate
60 days
Basohli
Please refer in SBD
5 documents required · 5 mandatory
₹600
Yes
e-NIT No. name of contr. on Try Challan
₹14,620
Yes
Executive Engineer PWD R and B Division Basohli
25 Aug 2020
16 Jul 2020
28 Jul 2020
17 Jul 2020
27 Jul 2020
19 Jul 2020
18 Jul 2020
Amount
Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 25mtr from cutting edge, disposed earth is to be leveled and neatly dressed in: a) All Kind of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level. (including all leads & lifts carriages of material by MT/H.L)
a) 1 : 5 : 10 (1 cement :5 coarse sand : 10 graded nallah stone aggregate 40mm nominal size).
b) 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded crusher stone aggregate 20mm nominal size) with 20% boulders.
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. a) In cement mortar (including all leads & lifts carriages of material by MT/H.L)
Random Rubble Masonary with hard stone from nallah in foundation and plinth incl. leveling up with cement concrete 1:6:12 (1 cement:6 coarse sand:12 graded stone aggregate) (including all leads & lifts carriages of material by MT/H.L)
Providing and laying Damp Proof Course 50mm thick with cement concrete 1: 2 : 4 (1 Cement : 2 coarse sand : 4 graded crushed stone aggregate 12.5mm nominal size) floor (including all leads & lifts carriages of material by MT/H.L)
Dumping stones in horizontal (including all leads & lifts carriages of material by MT/H.L)
Including cost of stones.
Excluding cost of stones.
Centering and shuttering including strutting, propping etc. and removal of form work for:- a) Walls(any thickness) including attached pilasters,buttresses, plinth and string courses etc.
Providing and Laying 2’ dia RCC Hume Pipes.
Carriage of the following materials by Mechanical Transport from source to site of work incl. loading, unloading and stacking complete :- a) Sand from Naj Crusher Billawar for an average lead of 26.00 Km. by M.T. b) Stone aggregate (crusher bajree) below 20mm nominal size Naj Crusher Billawar for an average lead of 26.00 Km. by M.T. c) Stone aggregate 40mm nominal size & above from Naj Crusher Billawar for an average lead of 26.00 Km. by M.T. d) Stones / boulders from Behani nallah for an average lead of 5.00 Km. by M.T.
jktender
GANESH SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .