| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.5 LAccepted-AOC | 1 | Accepted-AOC aoc | |
| 2 | 2₹15.4 L+₹43,177.32 (2.89%)Rejected-Finance | 2 | Rejected-Finance Financial Evaluation | |
| 3 | 3₹16.7 L+₹1.7 L (11.5%)Rejected-Finance Q VILLAGE TODI KHERI TEHSIL SAFIDON DISTRICT JIND 126112 | SAFIDON | JIND | HARYANA | 126112 | 3 | Rejected-Finance Financial Evaluation | |
| 4 | 4₹21.5 L+₹6.6 L (44.1%)Rejected-Finance | 4 | Rejected-Finance Financial Evaluation | |
| 5 | 5₹22.1 L+₹7.2 L (48.1%)Rejected-Finance | 5 | Rejected-Finance Financial Evaluation |
Tender Value
₹20.5 L
EMD Value
₹40,925
Closing Date
17 Dec 2025, 5:00 pmClosed
SURESH KUMAR
Municipal Committee Safidon
Construction of street from Rampura Road to Hudda Sadak (Dadi Sati Road)in ward no. 1 in MC Safidon.
2025_HRY_489290_1
2025CC13A007 E577 401C 99F9 5F80A999D201351ULB
Open Tender
Civil Works
Works
180 days
Safidon
2 documents required · 2 mandatory
₹1,000
Yes
₹40,925
Yes
22 Apr 2026
10 Dec 2025
18 Dec 2025
10 Dec 2025
17 Dec 2025
10 Dec 2025
[10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate]
[17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate]
[21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate]
[4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate]
[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_567473.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .