Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical BANDA | UTTAR PRADESH | 210001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹21.4 L
EMD Value
₹2.1 L
Closing Date
12 Oct 2026, 5:00 pmClosed
EO
NPP BANDA
w.no. 10 C.C road and drain at Rammilan chaurasiya
2026_DOLBU_1192199_13
1542/NPP/2026-27/Dt 19-09-2026
Open Tender
Civil Works
Percentage
90 days
npp banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,524
EO
₹2.1 L
13 Oct 2026
3 Oct 2026
13 Oct 2026
3 Oct 2026
12 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CC Road And Drain work | - | - | - | - |
| 2 | Earthfilling of soil upto 5km. | 408 | cum | 220.5 | ₹89,964 |
| 3 | Excavation in foundation in ordinary soil(Loam clay or sand) including lift up to 1.5meter (5ft) and lead upto 30m (100ft) and including filling warening & rimming of excavated earth into the trenches or into the space between the building and the sides of SI No. 251 | 38.25 | cum | 120 | ₹4,590 |
| 4 | Supply & laying of sand | 93.5 | cum | 1,000 | ₹93,500 |
| 5 | Concrete with 4 cm. gauge stone ballast fine sand of 1.25fm and cement in proportion of 1:4:8 in foundation and under floors with ass labour for completion of work SI No. 281 | 93.5 | cum | 4,300 | ₹4,02,050 |
| 6 | R.C.C. works cement appoved coatsesand and 2cm (1.5") gauge approved stone ballast in the proportion 1:1.5:3 in Raft foundation & footing excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI No. 283 | 25.5 | cum | 6,800 | ₹1,73,400 |
| 7 | R.C.C. works cement appoved coatsesand and 2cm (1.5") gauge approved stone ballast in the proportion 1:1.5:3 in Raft foundation & footing excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI no. 284 | 20.25 | cum | 7,200 | ₹1,45,800 |
| 8 | Steel Reinforcement for R.C.C work including straigthening , cutting , bending ,placing in position and binding all complete upto plinth level. DSR No. 5.2.2.1 | 21.55 | qtl | 7,798.28 | ₹1,68,037.34 |
| 9 | Laying of C.C. 1:1.5:3 for road | 102 | cum | 6,800 | ₹6,93,600 |
| 10 | S/L 125 micron polythene sheet | 680 | sqm | 20 | ₹13,600 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_2250049.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .