Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.9 L+₹22,358.57 (3.33%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹7.2 L+₹52,095.47 (7.77%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹7.3 L+₹55,896.43 (8.33%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹7.5 L+₹78,255 (11.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.2 L
EMD Value
₹11,200
Closing Date
7 Oct 2026, 4:00 pmClosed
Superintending Engineer Ganjam RandB div I Bam
O/O Superintending Engineer Ganjam RandB div I Bam
Annual Repair and Maintenance to L.H.V. Training centre of M.K.C.G. Medical College and Hospital at Berhampur (Such as Providing Gypsum board ceiling, Grading concrete and painting) Buildings.
2026_EICCL_142318_1
SE (R and B) Divn. I BAM No.21/2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Ganjam
2 documents required · 2 mandatory
₹6,000
₹11,200
Yes
9 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
1 Oct 2026 - 7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris with in 50m lead including cost of all labour with T&P etc. complete. | 59.4 | sqm | 58.95 | ₹3,501.63 |
| 2 | 12mm thick cement plaster in cm (1:6) finished smooth to brick masonry including watering, curing, cost, conveyance, taxes, royalties, labour with T&P etc. complete in all respect. | 59.4 | sqm | 194.61 | ₹11,559.83 |
| 3 | 6mm thick cement plaster in cm (1:4) finished smooth to RCC surface including watering, curing, cost, conveyance, taxes, royalties, labour with T&P etc. complete in all respect. | 20.46 | sqm | 216.77 | ₹4,435.11 |
| 4 | 1st Floor | 24.91 | sqm | 222.35 | ₹5,538.76 |
| 5 | Supplying, fitting, fixing of WPC ( Wood Polymer Composite ) Choukhat ( Size 50x125mm ) with cost of all materials, taxes, labour with T&P etc. complete | 20 | mtr | 1,007.3 | ₹20,146 |
| 6 | Supplying fitting & fixing 32mm thick flush door both sides skin moulded alkyd backer at the back and the size of out frame being of 33x57mm. Accessories / gaskets are to be used as per the manufacturers supply and specification like handle, lock and floor spring of approved quality including locking arrangement including all fitting, cost of all materials, labour T&P etc. complete. | 9.56 | sqm | 10,668.61 | ₹1,01,991.91 |
| 7 | Providing & fixing Plain Gypsum board ceiling suspended from roof by adjustable G.I. ceiling angle with spread at a distance not more than 600mm fixed to roof by Rowl Plug & stiff cleat, Gupsum board 12.5mm thick held by G.I. perimeter channel MF-3 & intermediate channel MF-7, framing, boarding, jointing & finishing with special type of gypsum compound etc. including cost , conveyance & taxes of all materials, labour with T&P etc. complete in all respect as per the direction of the E-I-C. | 61.2 | sqm | 1,506.62 | ₹92,205.14 |
| 8 | Providing fixing and fitting of Cornice for Gypsum borad ceiling 4'' wide of approved quality and approved make confirming to I S with necessary bends etc.complete fixed to wall with Screw etc asper the direction of Engineer in charge including cost of all material with taxes labour T&P etc complete. | 40.8 | mtr | 165.97 | ₹6,771.58 |
| 9 | Providing, fitting, fixing up partition walling OEL aluminium anodized section No. 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as Tapered clip for fixing up ACP Board and Glass and jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. | 4.2 | sqm | 4,717.49 | ₹19,813.46 |
| 10 | Providing, fitting, fixing of Aluminium. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member & 9200 as bottom & middle member & 6mm plain glass in top portion with 12mm thick pre laminated board in bottom portion fixed on door frame by means of apered clip No. 4660 & the frame to be completed by means of jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge. | 1.8 | sqm | 9,091.71 | ₹16,365.08 |
stage.html
html • 0.03 MB
finance_611812.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.27 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_611812.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .