Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC | ₹5.1 Cr Quoted ₹5.3 Cr | L1 | Accepted-AOC Quoted Less Percentage |
| 2 | L2₹5.5 Cr+₹15.2 L (2.86%)Rejected-AOC | ₹5.5 Cr+₹15.2 L (2.86%) | L2 | Rejected-AOC Quoted Above Percentage |
| 3 | L3₹5.5 Cr+₹20.2 L (3.81%)Rejected-AOC SALEM TAMIL NADU | ₹5.5 Cr+₹20.2 L (3.81%) | L3 | Rejected-AOC Quoted Above Percentage |
Tender Value
₹5.1 Cr
EMD Value
₹2.6 L
Closing Date
3 Feb 2022, 3:00 pmClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance Circle, Salem
Widening, Improvements and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Storm Water Drain, Retaining Wall and Reconstruction of Box Culvert in Salem (H) CandM Sub Division (SLM-1)
2022_HWAY_218389_1
8 /2021-2022 / HDO, Dated. 23.12.2021-1
Open Tender
Civil Works - Roads
Percentage
240 days
Salem
Refer tender document
3 documents required · 3 mandatory
₹0
₹2.6 L
20 Apr 2022
3 Jan 2022
4 Feb 2022
3 Jan 2022
3 Feb 2022
11 Jan 2022
6 Jan 2022 - 10 Jan 2022
eProcurement System Government of Tamil Nadu Created By: Sumathy D Created Date/Time: 25-Feb-2022 04:40 PM Tender Title: Salem (H) CandM Sub Division (SLM-1) Tender ID: 2022_HWAY_218389_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Salem Circle
Name of work : Widening, Improvements and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Storm Water Drain, Retaining Wall and Reconstruction of Box Culvert in Salem (H) C&M Sub Division (SLM-1) The Following works are involved 1.Reconstruction of Box Culvert at 1/8 of Salem Junction to Yercadu Road including Construction of Drain at Km 1/8(CRIDP-21-22-S-0228) 2.Improvements at km 204/8 - 205/6 of Varanasi - Kanyakumari Road (Abandoned NH7) including Construction of Drain at Km 204/10 and Dip raising at Km 204/10, 205/2 (SHU80) (CRIDP-21-22-S-0229) 3.Improvements at km 1/4 - 2/0, 3/0 - 3/2 of Salem new byepass road including Construction of Drain at Km 1/4-1/7 (CRIDP-21-22-S-0230) 4.Urban Improvements - Widening End to End from Two Lane and Improvements at km 0/3 - 1/0 of Suramangalam-Tharamangalam Road (CRIDP-21-22-M-0764) 5.Reconstruction of Box Culvert at Km.0/10 of Salem - Veeranam road including Construction of Retaining Wall at Km.0/10 (CRIDP-21-22-M-0767) 6.Improvements to Riding Quality at km 0/0 - 1/370 of The road branching from Km.7/2 of Mallur - Veerapandy road to Arasampalayam (CRIDP-21-22-I-3002)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Sri Dhanalakshmi and Co(GSTN-33ABGFS4834F1Z9) 45109366.391 5.000 53048614.000 Five Crore Thirty Lakh Fourty Eight Thousand Six Hundred and Fourteen
2.00 Sri Laxmi and Co(GSTN-33ABXFS4679K1Z6) 45109366.391 9.000 55069514.000 Five Crore Fifty Lakh Sixty Nine Thousand Five Hundred and Fourteen
3.00 A R P AND CO(GSTN-33AAOFA4326R1Z1) 45109366.391 8.000 54564289.000 Five Crore Fourty Five Lakh Sixty Four Thousand Two Hundred and Eighty Nine
Lowest Amount Quoted BY: Sri Dhanalakshmi and Co(53048614.000)
BOQ Summary Details Tender Title: Salem (H) CandM Sub Division (SLM-1) Tender ID: 2022_HWAY_218389_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Sri Dhanalakshmi and Co 53048614.000 L1
2 A R P AND CO 54564289.000 L2
3 Sri Laxmi and Co 55069514.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .