Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC GROUND FLOOR VATTIKA KUNJ BHONDSI GURUGRAM 122102 HARYANA | GURUGRAM | GURUGRAM | HARYANA | 122102 | ₹1.6 L | L1 | Accepted-AOC Being lowest |
| 2 | L2₹1.6 LRejected-AOC VILLAGE BAIRAHEDI TEHSIL KOTKASIM DISTRICT ALWAR | ALWAR | ₹1.6 L | L2 | Rejected-AOC non lowest |
Tender Value
₹1.7 L
EMD Value
₹3,340
Closing Date
17 Feb 2026, 5:00 pmClosed
VIMAL DEEP
DIV 6 Gurugram
Providing External Storm Water Draiange Scheme of Sector-81-98,Gurugram (Balance work gaps). Repair of brick work, plaster, providing RCC manhole slab and manhole covers on Master SWD drain 81-95, Gurugram
2026_HBC_501689_1
20268CD27EC9 B690 469D 875D 862306AA6341257HSV
Open Tender
Civil Works
30 days
Gurugram
2 documents required · 2 mandatory
₹250
Yes
₹3,340
Yes
10 Apr 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
[21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_580329.pdf
techsummary_580329.pdf
finance_580329.pdf
BOQ Comparative Chart
xlsx
finsummary_580329.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_580329.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid