Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance CONTRACTOR PARAMATHI NAMAKAKAL | Admitted-Finance |
Tender Value
₹44.8 L
EMD Value
₹80,180
Closing Date
28 May 2020, 4:00 pmClosed
Project Director
DRDA, Namakkal
1 road work at Paramathi Block in Namakkal District under NABARD XXV Package 18
2020_RDTN_163486_16
1785/2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Paramathi Block
Class I
3 documents required · 3 mandatory
₹0
₹80,180
Yes
DRDA, Namakkal
1 Jun 2020
13 May 2020
28 May 2020
13 May 2020
28 May 2020
20 May 2020
20 May 2020
Amount
Upgradation to the road from Manickanatham Naicker Street to Thulukkan Parai Km 0/0 -1/900(R94) H/o.Manickanatham
Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Premix carpet with sealcoat Type A to 20 mm Consolitated etc., complete as per clause 509 of MOST Specification.
Hard rock measured in solid including blasting & stacking with standared specification
Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40 MM metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and Centering for all Works including cost and conveyance of all materials to site and all labour charges etc complete.
Pipe culvert
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Cement Concrete in 1 : 3 : 6 mix using 40 mm ISS metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errection of centering for sides and sofits using country wood props and sttel shutters etc.,
Cost of R.C.C. NP 3 Pipe
Hard bed
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and errection of centering for sides and sofits using country wood props and sttel shutters etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
1.50 m Span Culvert
Earth work Excavation for structures upto 3m depth as per drawing and technical specification clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious mattar, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. Below sill
Supplying and Centering for all Works including cost and conveyance of all materials to site and all labour charges etc complete.
Deck Slab bottom
Wall sides
Supplying and fabrication of steel including cost and conveyance
Cement concrete 1 : 2 : 4 mix using 20mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. Above sill
Cement concrete 1 : 1.5 : 3 mix using 20mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
D Sakthivel
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .