Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.7 LAccepted-AOC | ₹45.7 L Quoted ₹46.5 L | L1 | Accepted-AOC AOC |
| 2 | L2₹46.8 L+₹30,149.88 (0.65%)Rejected-Finance PART III GANESH MURTHI NAGAR CAPT PRAKASH PETHE MARG CUFF PARADE ROAD COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | ₹46.8 L+₹30,149.88 (0.65%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹49.2 L+₹2.7 L (5.80%)Rejected-Finance | ₹49.2 L+₹2.7 L (5.80%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹50 L+₹3.5 L (7.43%)Rejected-Finance H NO 2 19 1 VELGANOOR VILLAGE DANDEPALLI MANDAL MANCHERIAL DISTRICT TELANGANA 504 215 | PRAKASAM | ANDHRA PRADESH | 504215 | ₹50 L+₹3.5 L (7.43%) | L4 | Rejected-Finance Not Lowest |
| 5 | L4₹50 L+₹3.5 L (7.43%)Rejected-Finance | ₹50 L+₹3.5 L (7.43%) | L4 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | hari enterprises L6 | P LAXMI AND CO. L2 | Lavanya Enterprises L4 | KIRAN CONSTRUCTIONS L4 | SRI SAI ENTERPRISES L7 | PVRCS ENGINEERS L3 | RKS ENTERPRISES L1 | CSR CONSTRUCTIONS L5 | sri vishnu enterprises L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .01Note:- Work shall be carried out upto G+2 storey bldg, contractor to quote rates accordingly. | ||||||||||||
| 1.00 | Cleaning of drains by excavating of the filled earth. Vegetation and all forged material average width 45 cm & depth 50cm and removing the excavated material to a distance exc. 50m and not exc. 250m complete all as specified and as directed | 500 | RM | 58 ₹29,000 | 150 ₹75,000 | 55 ₹27,500 | 55 ₹27,500 | 57 ₹28,500 | 49 ₹24,500 | 45 ₹22,500 Lowest | 53 ₹26,500 | 62 ₹31,000 |
| 2.00 | Dismantling floor, hearth or wall tiling/granite flooring including cement mortar bedding /backing coat and removing rubbish off the premises, complete all as directed. | 715 | SQM | 96 ₹68,640 | 40 ₹28,600 Lowest | 85 ₹60,775 | 85 ₹60,775 | 88 ₹62,920 | 91 ₹65,065 | 75 ₹53,625 | 98 ₹70,070 | 88 ₹62,920 |
| 3.00 | Demolition of cement concrete of any description not otherwise specifically provided for as in foundation etc., complete all as directed. | 25 | CUM | 1,726 ₹43,150 | 400 ₹10,000 Lowest | 1,650 ₹41,250 | 1,650 ₹41,250 | 1,655 ₹41,375 | 1,695 ₹42,375 | 1,610.5 ₹40,262.5 | 1,710 ₹42,750 | 1,653 ₹41,325 |
| 4.00 | M&L PCC (1:4:8) type D2 using 40mm graded crushed stone aggregate as in sunken floor/foundation/mass filling, complete all as specified and directed by Engineer-in-Charge. | 25 | Cum | 5,878 ₹1,46,950 | 3,200 ₹80,000 Lowest | 5,500 ₹1,37,500 | 5,500 ₹1,37,500 | 5,512 ₹1,37,800 | 5,159 ₹1,28,975 | 5,475.5 ₹1,36,887.5 | 5,350 ₹1,33,750 | 5,515 ₹1,37,875 |
| 5.00 | M&L PCC (1:2:4) type B-0 (using 12.5 mm grade crushed stone aggregate) concrete 30mm thick as sunken floor even and fair to receive top layer complete all as specified and directed | 50 | Sqm | 268 ₹13,400 | 200 ₹10,000 Lowest | 245 ₹12,250 | 245 ₹12,250 | 318 ₹15,900 | 241 ₹12,050 | 230 ₹11,500 | 255 ₹12,750 | 248 ₹12,400 |
| 6.00 | M/L Rendering 15mm thick as in sunken portion on brickwork or concrete surfaces in cement mortar 1:3 and finished fair and even including mixing of WPC in mortar complete all as directed by Engr-in-charge.
Note: - Supply only WPC shall be measured and paid separately. | 50 | Sqm | 321 ₹16,050 | 300 ₹15,000 | 315 ₹15,750 | 315 ₹15,750 | 315 ₹15,750 | 299 ₹14,950 | 310 ₹15,500 | 286 ₹14,300 Lowest | 323 ₹16,150 |
| 7.00 | M&L water proofing treatment with polymeric standard membrane of weight not less than 3Kg/Sqm with 90 micro high molecular high density polyethylene film sand witched between two layers of poly meric (atactic poly propylene based) bitumen laminated on both sides with 20 micron HMHDPE film over a coat of hot blow bitumen of 85/25 grade applied at the rate of 1.2 Kg per Sqm after priming the surfaces with bituminous emulsion at the rate of 100gms per Sqm duly 10cm over lapped and shall be fused uniformly by LPG torch flame on horizontal/ vertical surface of sunken floors complete all as directed by Engr-in-charge. | 50 | Sqm | 765 ₹38,250 | 700 ₹35,000 Lowest | 745 ₹37,250 | 745 ₹37,250 | 755 ₹37,750 | 751 ₹37,550 | 738.1 ₹36,905 | 810 ₹40,500 | 752 ₹37,600 |
| 8.00 | S&F in repairs 40mm dia GI medium grade pipe as in spouts 45cm long including making in holes in RCC and making good in cement mortar 1:1/PCC (1:2:4) complete all as directed by Engr-in-charge. | 10 | EACH | 129 ₹1,290 | 300 ₹3,000 | 125 ₹1,250 | 125 ₹1,250 | 128 ₹1,280 | 111 ₹1,110 | 110 ₹1,100 Lowest | 124 ₹1,240 | 129 ₹1,290 |
| 9.00 | M&L Non skid coloured ceramic tiles 7 mm thick area of each tiles exc 0.06 sqm but n.exc 0.11 sqm as in floor finishes set and jointed in neat cement slurry and pointed in white or coloured cement to match to complete all as specified and as directed. | 150 | Sqm | 1,169 ₹1,75,350 | 900 ₹1,35,000 Lowest | 1,145 ₹1,71,750 | 1,145 ₹1,71,750 | 1,148 ₹1,72,200 | 1,049 ₹1,57,350 | 1,147.2 ₹1,72,080 | 1,110 ₹1,66,500 | 1,152 ₹1,72,800 |
Tender Value
₹48.5 L
EMD Value
₹97,000
Closing Date
24 Jul 2026, 6:00 pmClosed
GE I R and D Kanchanbagh
GE I R and D Kanchanbagh Kanchanbagh Post Hyderabad 500058
REPAIRS TO CERTAIN TOILETS, SANITARY FITTINGS, SWG/PVC DRAIN PIPES, SUNKEN FLOORS IN DRDL TECHNICAL AND ADMIN AREA UNDER AGE B/R-I, KANCHANBAGH, HYDERABAD
2026_MES_775892_1
8208
Open Tender
Civil Works
Item Rate
270 days
GE I R and D Kanchanbagh
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE I R and D Kanchanbagh
₹97,000
Yes
17 Sept 2026
2 Jul 2026
27 Jul 2026
2 Jul 2026
24 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of drains by excavating of the filled earth. Vegetation and all forged material average width 45 cm & depth 50cm and removing the excavated material to a distance exc. 50m and not exc. 250m complete all as specified and as directed | 500 | RM | - | - |
| 2 | Dismantling floor, hearth or wall tiling/granite flooring including cement mortar bedding /backing coat and removing rubbish off the premises, complete all as directed. | 715 | SQM | - | - |
| 3 | Demolition of cement concrete of any description not otherwise specifically provided for as in foundation etc., complete all as directed. | 25 | CUM | - | - |
| 4 | M&L PCC (1:4:8) type D2 using 40mm graded crushed stone aggregate as in sunken floor/foundation/mass filling, complete all as specified and directed by Engineer-in-Charge. | 25 | Cum | - | - |
| 5 | M&L PCC (1:2:4) type B-0 (using 12.5 mm grade crushed stone aggregate) concrete 30mm thick as sunken floor even and fair to receive top layer complete all as specified and directed | 50 | Sqm | - | - |
| 6 | M/L Rendering 15mm thick as in sunken portion on brickwork or concrete surfaces in cement mortar 1:3 and finished fair and even including mixing of WPC in mortar complete all as directed by Engr-in-charge.
Note: - Supply only WPC shall be measured and paid separately. | 50 | Sqm | - | - |
| 7 | M&L water proofing treatment with polymeric standard membrane of weight not less than 3Kg/Sqm with 90 micro high molecular high density polyethylene film sand witched between two layers of poly meric (atactic poly propylene based) bitumen laminated on both sides with 20 micron HMHDPE film over a coat of hot blow bitumen of 85/25 grade applied at the rate of 1.2 Kg per Sqm after priming the surfaces with bituminous emulsion at the rate of 100gms per Sqm duly 10cm over lapped and shall be fused uniformly by LPG torch flame on horizontal/ vertical surface of sunken floors complete all as directed by Engr-in-charge. | 50 | Sqm | - | - |
| 8 | S&F in repairs 40mm dia GI medium grade pipe as in spouts 45cm long including making in holes in RCC and making good in cement mortar 1:1/PCC (1:2:4) complete all as directed by Engr-in-charge. | 10 | EACH | - | - |
| 9 | M&L Non skid coloured ceramic tiles 7 mm thick area of each tiles exc 0.06 sqm but n.exc 0.11 sqm as in floor finishes set and jointed in neat cement slurry and pointed in white or coloured cement to match to complete all as specified and as directed. | 150 | Sqm | - | - |
| 10 | M&L Non skid coloured ceramic tiles 7 mm thick area of each tiles exc 0.11 sqm but n.exc 0.18 sqm as in floor finishes set and jointed in neat cement slurry and pointed in white or coloured cement to matchto complete all as specified and as directed. | 180 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tenderpages.pdf
Tender Documents • 1.42 MB
BOQ_868839.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .