Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L Quoted ₹2.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 LRejected-Finance | ₹2.3 L | L2 | Rejected-Finance Second Less Amount |
| Sl No | Description | Qty | Unit | KUMAR TV L1 | K.Moorthy L2 |
|---|---|---|---|---|---|
| 1.00Repairs to Kitchen Cum Store shed at P U Ele School at Pillaipakkam in Veliyanallur Panchayat | |||||
| 2.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 6.62 | Cum | 5,540 ₹36,675 | 5,535 ₹36,642 |
| 3.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 1.16 | Cum | 6,253 ₹7,253 | 6,250 ₹7,250 |
| 4.00 | Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 85.1 | Sqm | 590.37 ₹50,240 | 985 ₹83,824 |
| 5.00 | Plastering with Cement Mortar 1:3 (One cement and Three P.Sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 18.9 | sqm | 326.7 ₹6,175 | 326 ₹6,161 |
| 6.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 1.4 | Sqm | 284.72 ₹399 | 284 ₹398 |
| 7.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 284.68 | sqm | 267.42 ₹76,129 | 267 ₹76,010 |
| 8.00 | Painting two coats Steel door & windows including cost and conveyance of all materials and all labour charges etc.for new steel door and windows etc | 14.64 | sqm | 159.23 ₹2,331 | 159 ₹2,328 |
| 9.00 | Light Point | 6 | Each | 1,593 ₹9,558 | 1,593 ₹9,558 |
| 10.00 | Plug Point | 4 | Each | 1,194 ₹4,776 | 1,194 ₹4,776 |
Updated dates
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
19 Feb 2026, 9:00 amClosed
BLOCK DEVELOPMENT OFFICER (BP)
BLOCK DEVELOPMENT OFFICE NEMILI
Repairs to Kitchen Cum Store shed at P U Ele School at Pillaipakkam in Veliyanallur Panchayat
2026_RDTN_660630_1
A2/3536/2025
Open Tender
Civil Works
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,500
Yes
15 Mar 2026
18 Feb 2026
19 Feb 2026
18 Feb 2026
19 Feb 2026
18 Feb 2026
Repairs to Kitchen Cum Store shed at P U Ele School at Pillaipakkam in Veliyanallur Panchayat
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:3 (One cement and Three P.Sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats Steel door & windows including cost and conveyance of all materials and all labour charges etc.for new steel door and windows etc
Light Point
Plug Point
Tube Light
Exhast Fan
Providing for Community Soak Pit Arrangements
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_792630.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid