| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Qualified |
| 2 | L1₹1.1 CrRejected-AOC | ₹1.1 Cr | L1 | Rejected-AOC not accepted |
| 3 | L1₹1.1 CrRejected-AOC | ₹1.1 Cr | L1 | Rejected-AOC not accepted |
| 4 | L1₹1.1 CrRejected-AOC | ₹1.1 Cr | L1 | Rejected-AOC not accepted |
| 5 | L1₹1.1 CrRejected-AOC VILL BAREGAON PO SORBHOG PS SORBHOG BARPETA PIN 781317 | BARPETA | ASSAM | 781317 | ₹1.1 Cr | L1 | Rejected-AOC not accepted |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
27 Jan 2025, 2:00 pmClosed
Chief Engineer,PWRD,Chandmari,Guwahati-03
O/o the Chief Engineer,PWRD,Chandmari,Guwahati-03
Imp.Of rd at(i Jakhlipbilpather LP Schl to Jakhli Rd (iipub-safakar Nathpara LPS to Beki Riverrd iii) Jagadish Dey house to Kutrijhar iv) Barpeta Rd Bahbari Rd to Goalgaon v) Bandowgu to Labdanguri Op Rd vi)labdanguri,G)Bhakuawamari Idd Gah Maidan
2025_PWD_42183_1
CE/Commn/125/SOPD-G/24-25/02
Open Tender
Civil Works – Roads
Item Rate
90 days
Manas
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,500
₹2.5 L
Yes
11 Jun 2025
17 Jan 2025
27 Jan 2025
17 Jan 2025
27 Jan 2025
17 Jan 2025
17 Jan 2025 - 27 Jan 2025
Amount
Heavy Dressing dressing of the existing road including dressing high spots,filling low spots and making up loss of material /irregularities, removingof all vegetation,cambering,watering,rolling with 8-10 tonneroller to obtain a specified compaction etc to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance,made for required quantity of shoulder materials to remain in place to contain the new gravel. Works to be carried out in accordance with Technical Specification and as directed by the engineer.
Heavy Dressing dressing of the existing road including dressing high spots,filling low spots and making up loss of material /irregularities, removingof all vegetation,cambering,watering,rolling with 8-10 tonneroller to obtain a specified compaction etc to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance,made for required quantity of shoulder materials to remain in place to contain the new gravel. Works to be carried out in accordance with Technical Specification and as directed by the engineer.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Dhrubajyoti Talukdar (BID ID -256064)
Blue Bell Group of Company (BID ID -256449)
KRISHNA DAS (BID ID -256511)
RAJU GOSWAMI (BID ID -256526)
JYOTISH DAS (BID ID -256529)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .