Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC AT KATHARA PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | L1 | Accepted-AOC Lower rate | |
| 2 | L2₹1.2 L+₹87.32 (0.07%)Rejected-Finance AT KATHARA PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | L2 | Rejected-Finance Higher rate | |
| 3 | L3₹1.3 L+₹726.88 (0.58%)Rejected-Finance BAJRANG NAGAR ANPARA DISTT SONEBHADRA UP | ANPARA | SONEBHADRA | UTTAR PRADESH | 231225 | L3 | Rejected-Finance Higher rate |
Tender Value
₹1.2 L
Closing Date
10 Feb 2023, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PROJECT ENGINEER (EXCV)
OFFICE OF PROJECT OFFICER, GOVINDPUR PH-II OCP, KATHARA AREA, CCL, PIN-829128
Repairing/overhauling of 3.3KV, 630A, VCB Electroteknica make field switch attached with EKG shovel HMB 523, Exc-2500 of Govindpur Ph-II OCP, Kathara Area
2023_CCL_269516_1
PE(Excv)/GVP Ph-II/22-23/E-TENDER/309 Dt.-31.01.23
Open Tender
Excavation Department Work
Item Rate
7 days
GVP PH-II OCP, KATHARA AREA.
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
25 Feb 2023
1 Feb 2023
11 Feb 2023
1 Feb 2023
10 Feb 2023
2 Feb 2023
1 Feb 2023 - 8 Feb 2023
Amount
Providing of feurels, lugs, clips, socket wiring belts for circuit wiring
Providing of test/reset switch
Providing of needle bush shaft in operating mechanism
Providing of C.T 100/50/6A, moulded type 10VA, STC 13.1 KA for 1 sec.
After rep. of breaker its complete testing by secondary injection set machine through all Protective relay at site
Repaieing & Setting of operator mechanism
Rep. & rectification of control circuit wiring
Renovation of bus-bar system with repairing by drilling , cutting, shape making and setting as well as complete insulation tapping covering
Rep./overhauling and commissioning of switch, such as insulation painting of all insulators, P.T, C.T etc as well as tightening of all loose connection/point.
Supervision, incidental & overhead expenses = 10%
Total impact of IGST for the purpose of CTC
M/S AMRIT TRADERS
M/S SHIVA ENTERPRISES
stage.html
html • 0.04 MB
techsummary_278842.pdf
PDF • 0.69 MB
finsummary_278842.pdf
PDF • 0.69 MB
309.PDF
PDF • 1.24 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .