| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance | ₹6.0 L | L1 | Accepted-Finance 1 ST. LOWEST |
| 2 | L2₹6.2 LRejected-Finance | ₹6.2 L | L2 | Rejected-Finance 2 ND. LOWEST |
| 3 | L3₹6.2 LRejected-Finance 4A KALICHARAN GHOSH ROAD KOL 50 | KOLKATA | WEST BENGAL | ₹6.2 L | L3 | Rejected-Finance 3 RD. LOWEST |
Tender Value
₹6.0 L
EMD Value
₹12,054
Closing Date
20 May 2026, 5:00 pmClosed
EE_MEMD
Office of the Executive Engineer Mayurakshi Electrical and Mechanical Division Benimadhab More Suri Birbhum
Replacement of under sluice gates shatter and its hoisting system Flap shutter of Sajaldanra under sluice gate, change of GI guard wall pipe for Dighirdanra and pagali kali under sluice gate site Malda Irrigation Division, Block old Malda, District.
2026_IWD_1023976_2
WBIW/EE/MEMD/e-NIT-03/2026-27 (2nd. Call of WBIW/EE/MEMD/e-NIT-16/2025-26 Sl.No. 2, 4)
Open Tender
MECHANICAL
30 days
OLD MALDA
Please refer Tender documents.
8 documents required · 8 mandatory
₹12,054
4 Jun 2026
11 May 2026
21 May 2026
13 May 2026
20 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Engagement of manpower (Mazdoor (Male/Female)) for cleaning the sluice bed (up and down strem) including debris, , carcasses, municipal/ local garbage, sludge, thick and thorny jungles and long grass, etc. by manual with necessary lifts & leads away from the embankment as per instruction of EIC.(10 nos labour x 4 days ) | - | Mandays | 520.46 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Taking out old existing unservicable damaged gate shutter of canal/ river completely after disengaging from hoisting system completely for installation of new gate shutter. The work includes cutting of gates into suitable pieces by gas cutting, removing the same by mechanical means or suitable crane, stacking all the pieces at the suitable place or as directed by the Engineer in charge upto a lead of 1000 m. The cost includes cost of man power employed for dismantling and cost of consumables like oxygen, accetylene gas, welding rod, hire charges of machineries, like chain pulley block, gas set, grinding machine, welding set, tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading. The cost of complete dismantling of hoisting system & cost of old unservisable materials handed over to departmental godown including loading & unloading will be provided extra. Gate shuteer size upto 4.00 sq.m . | - | Kg | 7.22 | - | BI01010001010000000000000515BI0100001114 |
| 3 | Fabrication , Supply, erection and commissioning of new Mild steel flap type regulator service gates of Distributories /BranchCanal /Minor Canal/Channel as per IS: 5620 - 2000/Latest Revision consisting of skin plate, vertical and horizantal grider, stiffener etc. made of MS material consisting of angle , channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction of Engineer in charge. The Cost includes cost of Materials, Machinaries , Manpower, Cutting, ligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification (without painting). | - | Kg | 160.81 | - | BI01010001010000000000000515BI0100001115 |
| 4 | Fabrication, supply, erection and commissioning of embeded parts consisting of hinge bracket with its accessories for vertical flap gate shutter of distributories/branch canal/minor canal/channel made of MS material consisting of angle, channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction of Engineer in charge. The cost includes cost of Materials, Machinaries , Manpower, Cutting, ligning, nchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting). | - | Kg | 321.62 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. | 1 | Cum | 2,331.16 | ₹2,328.83 | BI01010001010000000000000515BI0100001117 |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.Pakur Variety
floor. | 1 | Cum | 5,048.45 | ₹5,043.4 | BI01010001010000000000000515BI0100001118 |
| 7 | Repairing/replacement/strengthening of damaged/heavily corrodeded portion of cross/horizontal/ vertical steel members, chequered plate, stair case, hand railing etc. of MS hoist tresstle bridge, catwalk/walkway bridge and other similar MS structure on dam/barrage and canal/rivers which includes dismantling of damaged portion of structural members and fabrication and finishing to the required shape & size as per direction. The Cost includes cost of Materials, Machinaries , Manpower, Cutting, ligning, drilling, Welding, Finishing, Consumables, Carriages and all overheads with all leads and lifts complete as per specification (without painting). | - | Kg | 189.04 | - | BI01010001010000000000000515BI0100001119 |
| 8 | Surface cleaning of metal surfaces by chemical cleaners and then by hand with emary paper, wire brush and power tool cleaners and removing dust and preparation o f surface including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts. | - | Sq.M | 78.56 | - | BI01010001010000000000000515BI0100001120 |
| 9 | Painting hoist structural components, tressle bridge ,crane, lifting beam, cat work bridge and other similar structure on prepared surfaces with two coats of zinc phosphate primer (airless spray preferred) 40 microns/coat and followed by two coats of synthetic enamel paint 25 microns/coat including cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. | - | Sq.M | 376.86 | - | BI01010001010000000000000515BI0100001121 |
| 10 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. I) For structural members of specified sections weighing less than 22.5 Kg./m. | - | MT | 71,782.11 | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
2911.pdf
Tender Documents • 0.50 MB
BOQ_2516635.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid