| 1 | L1₹81.1 CrAccepted-AOC 39 ANAND INDUTRIAL ESTATE MOHAN NAGAR GHAZIABAD UTTAR PRADESH 201007 | GHAZIABAD | UTTAR PRADESH | 201007 | ₹81.1 Cr Quoted ₹429.4 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹476.9 Cr+₹47.5 Cr (11.1%)Rejected-Finance | ₹476.9 Cr+₹47.5 Cr (11.1%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹501.7 Cr+₹72.3 Cr (16.9%)Rejected-Finance | ₹501.7 Cr+₹72.3 Cr (16.9%) | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹525.8 Cr+₹96.5 Cr (22.5%)Rejected-Finance HO PLOT NO 11 1ST FLOOR LSC SECTOR B 1 VASANT KUNJ NEW DELHI 110070 | NEW DELHI | DELHI | 110070 | ₹525.8 Cr+₹96.5 Cr (22.5%) | L4 | Rejected-Finance l4 Bidder |
| 5 | L5₹539.3 Cr+₹109.9 Cr (25.6%)Rejected-Finance | ₹539.3 Cr+₹109.9 Cr (25.6%) | L5 | Rejected-Finance L5 Bidder |
| Sl No | Description | Qty | Unit | Standard Infratech India Private Limited L2 | Sombansi Enviro Engg Pvt Ltd L1 | M/S P L ADKE L5 | ANNU PROJECTS LIMITED L4 | M/S EMS LIMITED L6 | KRISHNA CONSTRUCTION (Gujarat) LLP L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Cost of Design, Development, Construction, Testing and Successful Commissioning of 22 MLD STP : Construction of one no. 22 MLD Sewage Treatment Plant on any proven technology to meet the KPI's as specified in bid document along with construction of Co-treatment facility of required capacity, Clear Water Sump & Pump House, admin building, DG/Transformer yard, laboratory, boundary wall, Guard Room, Sludge handling facility, campus development, water supply, drainage, sewerage facility, approach & Internal Road, internal & external electrification, online monitoring facility, SCADA with all electro-mechanical components along with appurtenant works described in detail in bid document. | |||||||||
| 1.01Break-up of Price Item 1 above | |||||||||
| 1.02 | Civil and Structural Works (including there equirement of Disposal and Facility for reuse of treated effluent) | 1 | Job | 11,88,57,670 ₹11,88,57,670 | 9,00,00,000 ₹9,00,00,000 | 11,10,60,000 ₹11,10,60,000 | 8,59,71,027.13 ₹8,59,71,027.13 Lowest | 15,26,61,600 ₹15,26,61,600 | 14,00,00,000 ₹14,00,00,000 |
| 1.03 | Supply, Installation, Testing and Commissioning of Electro-mechanical and Instrumentation equipment and accessories (including required fo Disposal and Facility for resue of treated effluent) | 1 | Job | 11,88,57,670 ₹11,88,57,670 | 14,00,00,000 ₹14,00,00,000 | 13,85,75,000 ₹13,85,75,000 | 10,50,00,000 ₹10,50,00,000 | 7,63,30,800 ₹7,63,30,800 Lowest | 13,50,00,000 ₹13,50,00,000 |
| 1.04 | Ancillary Works-admin building, DG/Transformer yard, laboratory, boundary wall, Guard Room, Sludge handling facility, campus development, water supply, drainage, sewerage facility, approach & Internal Road etc. | 1 | Job | 3,00,00,000 ₹3,00,00,000 | 4,00,00,000 ₹4,00,00,000 | 2,81,02,500 ₹2,81,02,500 | 3,93,72,662 ₹3,93,72,662 | 2,54,43,600 ₹2,54,43,600 | 50,00,000 ₹50,00,000 Lowest |
| 2.00Nalla Tapping Arrangements: | |||||||||
| 2.01Nalla Tapping Arrangement: Survey, design and construction of suitable size R.C.C. (M-30) Drain tapping structure (weir) of following drain with RCCM-30 River Training works at up stream and down stream of tapping point up to suitable length and installation of reqquired number Stainless Steel sluice gates to regulate the flow along with construction of inlet channel and installation of stainless steel coarse screen and installation of online flow measuring instrument and proper arrangement for operating platform. | |||||||||
| 2.02 | Piliyakhal Drain | 1 | Job | 60,00,000 ₹60,00,000 | 65,09,582.04 ₹65,09,582.04 | 1,10,60,407 ₹1,10,60,407 | 47,23,364.67 ₹47,23,364.67 | 72,69,600 ₹72,69,600 | 25,00,000 ₹25,00,000 Lowest |
| 3.00Main Pumping Station (MPS) | |||||||||
| 3.01 | MPS at Piliyakhal Design and construction of main pumping station of 22 MLD capacity10.00 m Dia including construction of Sump well, of suitable depth receiving chamber, screen chamber, Pump house, Panel room, DG/Transformer yard, Panel & PLC Room Boundary wall, RCC retaining wall on two sides along Assi Drain, internal road, site development works along with supply, installation and commissioning of suitable capacity non-clog submersible pumps (MOC- Casing- 2%NiCI, Impeller- ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100 mm particle with necessary accesseries such as motors, panals, cabeling, valves, pipings etc, D.G. set of electrical sub station of suitable capacity with necessary accessaries, one no. Electromagnetic Flowmeter cum totalizer having charecteristics/MOC: Liner: Polyurethane or Hard Rubber / Electrode MOC: SS316L /Housing : Die Cast Aluminium or CS /Power Supply: 90-230 V AC / Output: 4-20mA with HART / Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68 / Process Flange : SS316 / Display : 3 1/2 LCD Display / Cable Connection : 1/2"NPT /Accuracy : 0.5%, Automation of MPS, two nos Mechanical screens, one no. Manual screen, two nos. Transformers and Substation, provision for supply and installation of 5T capacity chain pulley block with traveling trolley with 15 meter lift with girder etc with necessary tools and spares, provision for testing of each pump set, valves etc. at manufacturer works and at site, painting of all pumps piping and valves with two coat enamel paint, supply and installation of AMF panel with associated works, supply and installation of actuated sluice gates with associated works etc. including Installation, commissioning and testing of all E&M equipments complete to the satisfaction of engineer in charge. Civil components of the MPS shall be designed for 26 MLD capacity. | 1 | Job | 2,00,00,000 ₹2,00,00,000 | 3,05,22,236.4 ₹3,05,22,236.4 | 2,97,34,800 ₹2,97,34,800 | 2,75,54,679 ₹2,75,54,679 | 3,63,48,000 ₹3,63,48,000 | 1,50,00,000 ₹1,50,00,000 Lowest |
Tender Value
₹85.0 Cr
EMD Value
₹91 L
Closing Date
25 Mar 2026, 5:30 pmClosed
Commissioner Municipal Corporation Ujjain
Chhatrapati Shiwaji Bhawan, Aagar Road, Ujjain M.P
I and D and STP Work at Ujjain under NMCG
2026_UAD_484390_1
UMC-PHE/NMCG/2026
Open Tender
Civil Works - Water Works
Lump-sum
545 days
Ujjain
Please Refer Tender Document
5 documents required · 5 mandatory
₹50,000
₹91 L
Yes
Ujjain
10 Jul 2026
23 Feb 2026
27 Mar 2026
23 Feb 2026
25 Mar 2026
23 Feb 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cost of Design, Development, Construction, Testing and Successful Commissioning of 22 MLD STP : Construction of one no. 22 MLD Sewage Treatment Plant on any proven technology to meet the KPI's as specified in bid document along with construction of Co-treatment facility of required capacity, Clear Water Sump & Pump House, admin building, DG/Transformer yard, laboratory, boundary wall, Guard Room, Sludge handling facility, campus development, water supply, drainage, sewerage facility, approach & Internal Road, internal & external electrification, online monitoring facility, SCADA with all electro-mechanical components along with appurtenant works described in detail in bid document. | |||||
| 1.01 | Break-up of Price Item 1 above | - | - | - | - |
| 1.02 | Civil and Structural Works (including there equirement of Disposal and Facility for reuse of treated effluent) | 1 | Job | - | - |
| 1.03 | Supply, Installation, Testing and Commissioning of Electro-mechanical and Instrumentation equipment and accessories (including required fo Disposal and Facility for resue of treated effluent) | 1 | Job | - | - |
| 1.04 | Ancillary Works-admin building, DG/Transformer yard, laboratory, boundary wall, Guard Room, Sludge handling facility, campus development, water supply, drainage, sewerage facility, approach & Internal Road etc. | 1 | Job | - | - |
| 2Nalla Tapping Arrangements: | |||||
| 2.01 | Nalla Tapping Arrangement: Survey, design and construction of suitable size R.C.C. (M-30) Drain tapping structure (weir) of following drain with RCCM-30 River Training works at up stream and down stream of tapping point up to suitable length and installation of reqquired number Stainless Steel sluice gates to regulate the flow along with construction of inlet channel and installation of stainless steel coarse screen and installation of online flow measuring instrument and proper arrangement for operating platform. | - | - | - | - |
| 2.02 | Piliyakhal Drain | 1 | Job | - | - |
| 3Main Pumping Station (MPS) | |||||
| 3.01 | MPS at Piliyakhal Design and construction of main pumping station of 22 MLD capacity10.00 m Dia including construction of Sump well, of suitable depth receiving chamber, screen chamber, Pump house, Panel room, DG/Transformer yard, Panel & PLC Room Boundary wall, RCC retaining wall on two sides along Assi Drain, internal road, site development works along with supply, installation and commissioning of suitable capacity non-clog submersible pumps (MOC- Casing- 2%NiCI, Impeller- ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100 mm particle with necessary accesseries such as motors, panals, cabeling, valves, pipings etc, D.G. set of electrical sub station of suitable capacity with necessary accessaries, one no. Electromagnetic Flowmeter cum totalizer having charecteristics/MOC: Liner: Polyurethane or Hard Rubber / Electrode MOC: SS316L /Housing : Die Cast Aluminium or CS /Power Supply: 90-230 V AC / Output: 4-20mA with HART / Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68 / Process Flange : SS316 / Display : 3 1/2 LCD Display / Cable Connection : 1/2"NPT /Accuracy : 0.5%, Automation of MPS, two nos Mechanical screens, one no. Manual screen, two nos. Transformers and Substation, provision for supply and installation of 5T capacity chain pulley block with traveling trolley with 15 meter lift with girder etc with necessary tools and spares, provision for testing of each pump set, valves etc. at manufacturer works and at site, painting of all pumps piping and valves with two coat enamel paint, supply and installation of AMF panel with associated works, supply and installation of actuated sluice gates with associated works etc. including Installation, commissioning and testing of all E&M equipments complete to the satisfaction of engineer in charge. Civil components of the MPS shall be designed for 26 MLD capacity. | 1 | Job | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
tenderdocument.pdf
Tender Documents • 5.76 MB
BOQ_569411.xls
BOQ • 0.34 MB
corrigendum4.pdf
PDF • 0.59 MB
corrigendum4.rar
PDF • 0.62 MB
corrigamdum_3.pdf
PDF • 0.05 MB
corrigendum2.rar
PDF • 1.82 MB
Corrigendum.pdf
PDF • 0.58 MB
Corrigendum.pdf
PDF • 0.58 MB
link2.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .