Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 154 ICC T P NAGAR KORBA 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical NEAR S K MEDICASY WARD NO 20 JAIL HATA JAIL HATA VILLAGE TOWN DALTONGANJ CITY DALTONGANJ PALAMU JHARKHAND 822101 INDIA | PALAMU | JHARKHAND | 822101 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical BEHIND OF PAWAN TAKIES ROAD KORBA CG 495678 | KORBA | KORBA | CHHATTISGARH | 495678 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical HOUSE NO LIG 12 L CHHATTISGARH HOUSING BOARD COLONY KHARMORA POST KUSMUNDA DISTT KORBA C G | KHARMORA | MCB | CHHATTISGARH | 495677 | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.4 Cr
EMD Value
₹3.0 L
Closing Date
4 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Civil) SECL Raigarh Area
Office of Staff Officer (Civil) SECL Raigarh Area
Providing Wind Barrier along coal stock yard at Jampali OCM of Jampali Sub Area.
2026_SECL_367389_1
SECL/GM/RGH/SOC/e-Tender/ 2026-27/26 dtd 19.10.2026
Open Tender
Civil Works - Others
Percentage
120 days
Raigarh
As per NIT
5 documents required · 5 mandatory
₹3.0 L
5 Nov 2026
19 Oct 2026
5 Nov 2026
19 Oct 2026
4 Nov 2026
20 Oct 2026
19 Oct 2026 - 28 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description - Part-A | |||||
| 1.01 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 4,275 | sqm | 20.7 | ₹88,492.5 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 1,902.8 | cum | 127.4 | ₹2,42,417.04 |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 113.17 | cum | 1,145.95 | ₹1,29,691.17 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 134.98 | CUM | 4,714.45 | ₹6,36,337.6 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 639.37 | cum | 6,602.2 | ₹42,21,277.95 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 1,344.41 | sqm | 273.6 | ₹3,67,831.51 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1,308.15 | sqm | 499.45 | ₹6,53,355.52 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 1,476.59 | sqm | 649.85 | ₹9,59,558.76 |
| 1.09 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 1,273.38 | cum | 119.65 | ₹1,52,360.12 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 1.64 MB
Tendernotice_3.pdf
PDF • 0.89 MB
Tendernotice_4.pdf
PDF • 0.84 MB
BOQ_380330.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .