| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.6 L+₹14,730 (1.55%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IKRAM ENGINEERING WORKS L1 | M/s Mishra Construction L2 |
|---|---|---|---|---|---|
| 1.00Survey of Substations | |||||
| 1.01 | Checking of incomming & outgoing VCB Panel working and parts on Quarterly basis( once in a three (03) month) | 17 | Yearly per Substation | 51,000 ₹51,000 | 48,450 ₹48,450 Lowest |
| 2.00Work | |||||
| 2.01 | Complete overhauling of Panel, insulation of bus bar with HT Tape, Empire Tape and cleaning of spouts | 8 | JOB | 24,000 ₹24,000 | 22,800 ₹22,800 Lowest |
| 2.02 | Complete Overhauling of Trolley and Manual and Motorised charging mechanism. | 8 | JOB | 16,000 ₹16,000 | 13,200 ₹13,200 Lowest |
| 2.03 | Repairing and adjusting of Tripping Assembly and circuit. | 8 | JOB | 16,000 ₹16,000 | 12,800 ₹12,800 Lowest |
| 2.04 | Repairing and adjusting of Closing Assembly and circuit. | 8 | JOB | 16,000 ₹16,000 | 12,800 ₹12,800 Lowest |
| 2.05 | Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB. | 8 | JOB | 12,000 ₹12,000 | 9,600 ₹9,600 Lowest |
| 2.06 | Replacement and Adjustment of Vacuum Interrupter | 8 | JOB | 12,000 ₹12,000 | 8,800 ₹8,800 Lowest |
| 2.07 | Repairing and Adjusting of shutter Assembly | 8 | JOB | 20,000 ₹20,000 | 13,600 ₹13,600 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
9 Feb 2026, 4:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution circle, Santkabirnagar
Annual maintenance work of 33/11 KV VCB/Control Panel under Electricity Distribution Division Sant Kabir Nagar.
2026_PVVNV_1105190_1
33/EDC(SKN)/2025-26
Open Tender
Electrical Works
Fixed-rate
365 days
Santkabirnagar
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
SE EDC SKN
₹12,000
11 Feb 2026
9 Jan 2026
10 Feb 2026
9 Jan 2026
9 Feb 2026
9 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Survey of Substations | |||||
| 1.01 | Checking of incomming & outgoing VCB Panel working and parts on Quarterly basis( once in a three (03) month) | 17 | Yearly per Substation | - | - |
| 2Work | |||||
| 2.01 | Complete overhauling of Panel, insulation of bus bar with HT Tape, Empire Tape and cleaning of spouts | 8 | JOB | - | - |
| 2.02 | Complete Overhauling of Trolley and Manual and Motorised charging mechanism. | 8 | JOB | - | - |
| 2.03 | Repairing and adjusting of Tripping Assembly and circuit. | 8 | JOB | - | - |
| 2.04 | Repairing and adjusting of Closing Assembly and circuit. | 8 | JOB | - | - |
| 2.05 | Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB. | 8 | JOB | - | - |
| 2.06 | Replacement and Adjustment of Vacuum Interrupter | 8 | JOB | - | - |
| 2.07 | Repairing and Adjusting of shutter Assembly | 8 | JOB | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2039228.xls
BOQ • 0.29 MB
TD_33.rar
Tender Documents • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .