Loading…
Loading…
Tender Value
₹17.6 L
EMD Value
₹1.8 L
Closing Date
14 Sept 2026, 2:00 pm
EXICUTIVE OFFICER NAGAR PALIKA PARISHAD KHATAULI
EXICUTIVE OFFICER NAGAR PALIKA PARISHAD KHATAULI
NAGAR PALIKA SHETR ME JAMEEL AHAMD ATA CHAKKI SE G T ROAD HOTE HUYE SARDAR SHUTTER WALE TAK RCC NAALA NIRMAN KARY
2026_DOLBU_1178867_1
650/07/NPPKHT/2026-27 DATE-22/08/2026
Open Tender
Civil Works
Fixed-rate
60 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,118
EXICUTIVE OFFICER NAGAR PALIKA PARISHAD KHATAULI
₹1.8 L
22 Aug 2026
22 Aug 2026
14 Sept 2026
22 Aug 2026
14 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work of old and damage Nala Including of all material,labour and T&P etc.required for proper completion of work (Chpt-17/692), | 101.2 | Cum | 400 | ₹40,480 |
| 2 | Deduction of old and workable brick 20% of above Items Including of all material,labour and T&P etc.required for proper completion of work (Chpt-1/1a), | 10,120 | nos | - | - |
| 3 | Earth work in excavation in soil mixed with kankar,silt& licquid mud with including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-4/252) | 66 | Cum | 112.5 | ₹7,425 |
| 4 | Disposal of dismantling Material up to 5km Including of all material,labour and T&P etc.required for proper completion of work (Chpt-3/231a) Note All dismantling material will be submeete to nagar panchayat Dismantling Material Excavated Material | 133.76 | Cum | 124.8 | ₹16,693.25 |
| 5 | Sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 km (Chpt 4/255) | 54.78 | Cum | 380 | ₹20,816.4 |
| 6 | Concrete in 1:4:8 with stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. (Chpt-5/281) | 27.39 | Cum | 4,850 | ₹1,32,841.5 |
| 7 | Concrete in 1:2:4 with stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.(Chpt-5/279a) | 18.26 | Cum | 5,750 | ₹1,04,995 |
| 8 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Raft foundation i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/287a) | 24.09 | Cum | 7,800 | ₹1,87,902 |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Rcc wall i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/289) | 50.6 | Cum | 7,800 | ₹3,94,680 |
| 10 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in RCC Slab i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/284a) | 8.03 | Cum | 7,800 | ₹62,634 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.35 MB
BOQ_2215982.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].