| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC KHALARI BAZAR KHALARI DISTT RANCHI 829205 JHARKHAND | KHALARI | RANCHI | JHARKHAND | 829205 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L-4 | |
| 3 | Rejected-Technical CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | Rejected-Technical L-2 | |
| 4 | Rejected-Technical CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | Rejected-Technical L-6 | |
| 5 | Rejected-Technical | - | Rejected-Technical L-7 |
Tender Value
₹8.1 L
EMD Value
₹10,200
Closing Date
11 Jul 2022, 5:00 pmClosed
PE(Elect) CHP-CPP/PPR
OFFICE OF PO CHP-CPP, Piparwar Area, CCL, PO - Bachra, Dist - Chatra, Jharkhand - 829201
Complete Repairing/Rewinding of 01 no. 1600 KVA, 11 KV / 3.3 KV, 3-Phase Transformer sl. No. 11902, Make ETE Thana Electric Supply Ltd. Hydrabad, installed at 4212 S/S under CHP-CPP/PPR
2022_CCL_248630_1
PE(Elect.)/CHP/e-NIT/22-23/14
Open Tender
Electrical and Maintenance Works
Item Rate
18 days
CHP-CPP/Piparwar
2 documents required · 2 mandatory
₹10,200
Yes
15 Apr 2023
2 Jul 2022
12 Jul 2022
2 Jul 2022
11 Jul 2022
2 Jul 2022
2 Jul 2022 - 8 Jul 2022
Amount
Cost of Copper winding wire with TPC Covering for HT/LT Coils.
Cost of insulating materials @15% of item no 1
Cost of labour charge @15% of item no. 1
Supply and Fixing of 3 no. of 11 KV Epoxy bushing for transformer on HT side & 4 no. of 3.3 KV epoxy bushing for transformer on LT side
Radiator /Fins Lekage Repairing
Fabrication of joint box and making of Bus Bar arrangement on HT Side
Supply and fixing of Buchholz relay, Oil Temp. meter ,Winding Temp Meter, silica Gel and Connection Cu cable
Supply Corksheet of 10 mm ( 4" x 4")
Spray Painting of Body, Radiator, Conservator of 1600 KVA Trasformer with one coat of primer & two coat of enamel smoke grey paint.
Fixing chaarge of item no. 8 ( @ 10 % of 15000)
Oil filteration of the transformer oil to maintain the required BDV value of oil
Less scrap value @ 60% of Sl.no- 1 (-)
Total impact of GST for the purpose of CTC
CENTRAL ENGINEERS
Rajneesh Electricals
B S Electricals
M.k. Traders
coalfields engineering works
ELECTROMECH
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .