Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹60.2 LAccepted-Finance | ₹60.2 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹65.5 L+₹5.3 L (8.77%)Rejected-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | ₹65.5 L+₹5.3 L (8.77%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹66.0 L+₹5.8 L (9.67%)Rejected-Finance | ₹66.0 L+₹5.8 L (9.67%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹66.6 L+₹6.4 L (10.7%)Rejected-Finance GRAM NAGLA KHUJI POST DADON ATROLI ALIGARH UTTAR PRADESH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹66.6 L+₹6.4 L (10.7%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹72.1 L+₹11.9 L (19.7%)Rejected-Finance | ₹72.1 L+₹11.9 L (19.7%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S ARYA ENTERPRISES L2 | M/S PRAKASH CONSTRUCTION L5 | M/S UMA SHANKAR YADAV L1 | M/S JEET CONSTRUCTION L4 | SAI GENERAL ENGINEERING WORKS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION PRESSURE WELL | ||||||||
| 1.01 | Earth work excavation of foundation for construction of well and laying pipes in all types of soils excluding mechanical compaction but inclusive of manual compaction and its proper disposal & back filling with dressing to profile including all lead and lift, labour, T&P etc. | 10,869.74 | CUM | 90 ₹9,78,276.6 | 100 ₹10,86,974 | 88.69 ₹9,64,037.24 | 98.82 ₹10,74,147.71 | 63 ₹6,84,793.62 Lowest |
| 1.02 | E/W in filling dry earth including lead upto 30m and lift 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profiles including all cost of labour,t&p etc | 4,992.96 | CUM | 0.01 ₹49.93 Lowest | 90 ₹4,49,366.4 | 71.4 ₹3,56,497.34 | 79.56 ₹3,97,239.9 | 52 ₹2,59,633.92 |
| 1.03 | Centering & Shuttering for P.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. | 100.24 | SQM | 200 ₹20,048 | 150 ₹15,036 | 147 ₹14,735.28 | 163.8 ₹16,419.31 | 108 ₹10,825.92 Lowest |
| 1.04 | Centering & Shuttering for R.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. | 1,295.56 | SQM | 500 ₹6,47,780 | 400 ₹5,18,224 | 350 ₹4,53,446 Lowest | 390 ₹5,05,268.4 | 380 ₹4,92,312.8 |
| 1.05 | Laying C.C- A 40 M10 in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T&P labour etc. | 29.54 | CUM | 10,000 ₹2,95,400 | 10,500 ₹3,10,170 | 8,461.22 ₹2,49,944.44 Lowest | 9,427.86 ₹2,78,498.98 | 10,800 ₹3,19,032 |
| 1.06 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire required for proper completion of work including cost of all material, labour T&P etc. | 19.28 | MT | 70,000 ₹13,49,600 | 65,000 ₹12,53,200 | 49,910 ₹9,62,264.8 Lowest | 55,614 ₹10,72,237.92 | 63,000 ₹12,14,640 |
| 1.07 | Laying R.C.C, A-20, M-20 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 184.1 | CUM | 12,000 ₹22,09,200 | 11,000 ₹20,25,100 | 9,107.84 ₹16,76,753.34 Lowest | 10,148.74 ₹18,68,383.03 | 11,350 ₹20,89,535 |
| 1.08 | Supplying & Fixing 200mm dia HDPE pipe PE-100: 6Kg/sq.cm required for proper completion of work including cost of all material, labour and T&P etc. | 210 | RM | 1,100 ₹2,31,000 | 1,000 ₹2,10,000 | 917 ₹1,92,570 Lowest | 1,021.8 ₹2,14,578 | 1,120 ₹2,35,200 |
| 1.09 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc/kwh | 11,488.4 | KWH | 0.01 ₹114.88 Lowest | 30 ₹3,44,652 | 32.09 ₹3,68,662.76 | 35.75 ₹4,10,710.3 | 30 ₹3,44,652 |
Tender Value
₹86 L
EMD Value
₹1.7 L
Closing Date
20 Aug 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
Rapti Nahar Nirman Mandal 1 Balrampur
As per Tender Notice
2026_UPIDC_1174864_6
01/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
90 days
Siddharthnagar
As per Tender Notice
2 documents required · 2 mandatory
₹2,350
₹1.7 L
Yes
10 Sept 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION PRESSURE WELL | |||||
| 1.01 | Earth work excavation of foundation for construction of well and laying pipes in all types of soils excluding mechanical compaction but inclusive of manual compaction and its proper disposal & back filling with dressing to profile including all lead and lift, labour, T&P etc. | 10,869.74 | CUM | - | - |
| 1.02 | E/W in filling dry earth including lead upto 30m and lift 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profiles including all cost of labour,t&p etc | 4,992.96 | CUM | - | - |
| 1.03 | Centering & Shuttering for P.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. | 100.24 | SQM | - | - |
| 1.04 | Centering & Shuttering for R.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. | 1,295.56 | SQM | - | - |
| 1.05 | Laying C.C- A 40 M10 in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T&P labour etc. | 29.54 | CUM | - | - |
| 1.06 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire required for proper completion of work including cost of all material, labour T&P etc. | 19.28 | MT | - | - |
| 1.07 | Laying R.C.C, A-20, M-20 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 184.1 | CUM | - | - |
| 1.08 | Supplying & Fixing 200mm dia HDPE pipe PE-100: 6Kg/sq.cm required for proper completion of work including cost of all material, labour and T&P etc. | 210 | RM | - | - |
| 1.09 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc/kwh | 11,488.4 | KWH | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_2207897.xls
BOQ • 0.26 MB
lot6.pdf
Tender Documents • 3.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .