| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | ₹4.9 L Quoted ₹5.7 L | L1 | Accepted-AOC Work was Awarded |
| 2 | L2₹6.2 LRejected-AOC | ₹6.2 L | L2 | Rejected-AOC Work was Not Awarded |
| Sl No | Description | Qty | Unit | S. MURUGAN CONTRACTOR L1 | RAYAN AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Replacement of ASP & AWP motor (155 to 160 kw) Dismantling the terminal cover and power cable of failed motor. Replacement of defective motors by spare motor. Cleaning and Reconnecting of power cable terminals. Checking the IR value and DC Resistance value of motor. Improving the IR value by flood light. Tightness checking of power cable terminals at breaker end. Assembling the terminal cover. Commissioning of motor. Measuring load currents at idle and full load condition. Cost of T & P and consumable etc... | 2 | Nos | 15,728 ₹18,559.04 | 16,000 ₹18,880 |
| 2.00 | Servicing of three phase power contactor -400 A capacity Disconnecting the power contactor limb bolt and nuts and control wires. Removing the power contactor from the panel. Dismantling the power contactor. Cleaning of all parts of power contactor by cleaning agent. Checking the healthiness of 415 volt power coil. Assembling and checking the performance of power contactor. Refixing the power contactor in the panel. Replacing the indication lambs, switches, and resistor if necessary. Cleaning and checking the function of control switches. Tightness checking of all control wires. cost of T & P and consumable etc... | 32 | Nos | 1,50,112 ₹1.8 L | 1,56,800 ₹1.9 L |
| 3.00 | Maintenance of ASP & AWP Motor (Capacity 100 to 160 KW) Dismantling the terminal cover of motor. Disconnecting the power cables. Cleaning and Reconnecting of power cable terminals. Replacing the lug, bimetallic sheet, earthing cable, cooling fan, cooling fan cover, bolt, nut, washer, spring washer etc if necessary. Applying grease. Assembling the terminal cover. Replacement of defective motor by healthy one if necessary. Checking the IR value and DC resistance value of motor. Improving the IR value by flood light if necessary. Measuring load currents at idle and full load condition. Cost of T & P and consumable etc... | 36 | Nos | 1,90,224 ₹2.2 L | 2,10,600 ₹2.5 L |
| 4.00 | Maintenance of auxiliary motor (Up to 55 KW) Dismantling the terminal cover of motor. Disconnecting the power cables. Cleaning and Reconnecting of power cable terminals. Replacing the lug, bimetallic sheet, earthing cable, cooling fan, cooling fan cover, bolt, nut, washer, terminal black etc if necessary. Applying grease. Assembling the terminal cover. Replacement of defective motor by healthy one if necessary. Checking the IR value and DC resistance value of motor. Improving the IR value by flood light if necessary. Measuring load currents at idle and full load condition. Cleaning and checking the function of control switches. Replacing the Control switches if necessary. Tightness checking of all control wires. cost of T & P and consumable etc... | 60 | Nos | 2,18,760 ₹2.6 L | 2,40,000 ₹2.8 L |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
2 Jan 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM III Charges for maintenance of LT motors LT power contactor LT SWGR and power Transformer of AHP II DMP II FOPH II of Unit IV V of TTPS for the period from 01 04 2026 to 31 03 2027
2025_EB_633508_1
CE/SE/ES/TTPS/52/2026-27
Open Tender
Electrical and Maintenance Works
365 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹5,200
Yes
23 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Replacement of ASP & AWP motor (155 to 160 kw) Dismantling the terminal cover and power cable of failed motor. Replacement of defective motors by spare motor. Cleaning and Reconnecting of power cable terminals. Checking the IR value and DC Resistance value of motor. Improving the IR value by flood light. Tightness checking of power cable terminals at breaker end. Assembling the terminal cover. Commissioning of motor. Measuring load currents at idle and full load condition. Cost of T & P and consumable etc...
Servicing of three phase power contactor -400 A capacity Disconnecting the power contactor limb bolt and nuts and control wires. Removing the power contactor from the panel. Dismantling the power contactor. Cleaning of all parts of power contactor by cleaning agent. Checking the healthiness of 415 volt power coil. Assembling and checking the performance of power contactor. Refixing the power contactor in the panel. Replacing the indication lambs, switches, and resistor if necessary. Cleaning and checking the function of control switches. Tightness checking of all control wires. cost of T & P and consumable etc...
Maintenance of ASP & AWP Motor (Capacity 100 to 160 KW) Dismantling the terminal cover of motor. Disconnecting the power cables. Cleaning and Reconnecting of power cable terminals. Replacing the lug, bimetallic sheet, earthing cable, cooling fan, cooling fan cover, bolt, nut, washer, spring washer etc if necessary. Applying grease. Assembling the terminal cover. Replacement of defective motor by healthy one if necessary. Checking the IR value and DC resistance value of motor. Improving the IR value by flood light if necessary. Measuring load currents at idle and full load condition. Cost of T & P and consumable etc...
Maintenance of auxiliary motor (Up to 55 KW) Dismantling the terminal cover of motor. Disconnecting the power cables. Cleaning and Reconnecting of power cable terminals. Replacing the lug, bimetallic sheet, earthing cable, cooling fan, cooling fan cover, bolt, nut, washer, terminal black etc if necessary. Applying grease. Assembling the terminal cover. Replacement of defective motor by healthy one if necessary. Checking the IR value and DC resistance value of motor. Improving the IR value by flood light if necessary. Measuring load currents at idle and full load condition. Cleaning and checking the function of control switches. Replacing the Control switches if necessary. Tightness checking of all control wires. cost of T & P and consumable etc...
RAYAN AND COMPANY (BID ID -1539385)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_757921.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid