Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-AOC NEW MADHOPUR COLONY SURAJKUND GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹2.0 L+₹3,920 (2.00%)Rejected-Finance 98 PANIYARE PURWA MAKRAND NAGAR SARAIMEERA KANNAUJ KANNAUJ UTTAR PRADESH 209726 | KANNAUJ | UTTAR PRADESH | 209726 | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹2 L+₹4,320 (2.21%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
5 May 2020, 12:00 pmClosed
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
RECTIFICATION OF SAS INSTALLED AT 132 KV SUBSTATION CHAKIA UNDER ELECTY. TRANSMISSION DIVISION-III, SAHUPURI
2020_UPTCL_463211_1
E-Tender No. 208/2019-20/ETC/VNS
Open Tender
Electrical Works
Item Wise
30 days
132 KV SUBSTATION CHAKIA
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹236
SE, ETC, Varanasi
₹2,000
15 Oct 2020
27 Apr 2020
5 May 2020
27 Apr 2020
5 May 2020
28 Apr 2020
Amount
Rectification of ABB make substation Automation System installed at 132 KV S/S Chakia. The following works are including for healthy SCADA communication a. Replacing the defective armoured optical fiber cable and splicing it if required anywhere in the Ring. b. Replacing the defective FO multimode sc-LC port patch cords. c. Checking the healthiness of LIUs and its communication ports. d. Checking the healthiness of IEC 61850-7 Ethernet switches. e. Replacement the defective CAT-5/LAN cables and checking its healthiness. f. Rectifying communication healthiness of MOD Bus RTU for various MFM meters. g. Rectification/checking healthiness of GPS system and its time synchoronisation with all relays. h. Re-installation of new backup Runtime & Editor backup to SCADA. i. Checking the healthiness of all protection relays communication to SCADA. j. Checking & Re-arranging of all required events, alarms, numerical datas, status and signals to SCADA from various bays & feeders. k. Checking and re-arranging the SLD of S/S to SCADA screen. l. Checking the all required operations if equipments from SCADA. m. Configuration of Ethernet switches if required. n. Configuration of Modem for communication. o. Re-installation of new updated backup and windows. p. Configuration of RTU to do healthy communication.
Supply of Fiber optical multimode patch cards for LC-ST ports(each 5 meters)
Supply of cat 5/ lan cable (each 5 mtr.)
Supply of fiber optical/Multimode patch for LC-ST ports (each 10 meters)
rbs engineering
Electro Grid Power Services and Solutions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .