Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC AT KUCHANA POST KUCHANA TAH BHADRAWATI DISTRICT CHANDRAPUR MS | BHADRAWATI | CHANDRAPUR | MAHARASHTRA | 442503 | L1 | Accepted-AOC WORK AWARD | |
| 2 | L2₹11.6 L+₹77,113 (7.10%)Rejected-Finance AT 75 RAJUR COLLIERY POST RAJUR TAH WANI DIST YAVATMAL MAHARASHTRA 445304 | RAJUR | YAVATMAL | MAHARASHTRA | 445304 | L2 | Rejected-Finance AS L2 |
Tender Value
₹13.5 L
EMD Value
₹16,900
Closing Date
20 Aug 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer Civil WNA
AGM Office Bhallar Township Wani North Area
Construction of 8 Nos sectionalisation stopping with RCC in Najor seam and minor seam at essential places at Rajur Incline Colliery
2022_WCL_251938_1
wn4650-civ-e020-2022-23 dt 29.07.2022
Open Tender
Civil Works - Others
Item Rate
180 days
Rajur Incline Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹16,900
22 Nov 2022
1 Aug 2022
22 Aug 2022
2 Aug 2022
20 Aug 2022
2 Aug 2022
2 Aug 2022 - 13 Aug 2022
Amount
Excavation of dumped stone, coal, shale, malma etc. near proposed site and removal/cleaning, mucking and coal including loading and unloading upto 50mtr. During cealing of coal gallery at Rajur incline colliery.
Earth work in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including getting out the sides and ramming of bottoms, lift upto 1.5 mtr, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Ordinary rock
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
White washing with lime to give an even shade : New work (three or more coats)
Transportation of material from S/F to S/F by manual labour including, loading, unloading and stacking for lead less than 50mtrs. Cement
Transportation of material from S/F to S/F by manual labour including, loading, unloading and stacking for lead less than 50mtrs. Sand
Transportation of material from S/F to S/F by manual labour including, loading, unloading and stacking for lead less than 50mtrs. Metal
Transportation of material from S/F to U/G by manual labour including, loading, unloading and stacking for additional lead 0.00mtr. to 100mtrs. (filling in empty bag as S/F and transportation to U/G). Cement
Transportation of material from S/F to U/G by manual labour including, loading, unloading and stacking for additional lead 0.00mtr. to 100mtrs. (filling in empty bag as S/F and transportation to U/G). Sand
Transportation of material from S/F to U/G by manual labour including, loading, unloading and stacking for additional lead 0.00mtr. to 100mtrs. (filling in empty bag as S/F and transportation to U/G). Metal
Transportation of material from S/F to U/G by manual labour including, loading, unloading and stacking for additional lead 0.00mtr. to 150mtrs. (filling in empty bag as S/F and transportation to U/G). Cement
Transportation of material from S/F to U/G by manual labour including, loading, unloading and stacking for additional lead 0.00mtr. to 150mtrs. (filling in empty bag as S/F and transportation to U/G). Sand
Transportation of material from S/F to U/G by manual labour including, loading, unloading and stacking for additional lead 0.00mtr. to 150mtrs. (filling in empty bag as S/F and transportation to U/G). Metal
Total impact of GST for the purpose of CTC
M/s Murli Singh
stage.html
html • 0.04 MB
techsummary_260338.pdf
PDF • 1.80 MB
finsummary_260338.pdf
PDF • 1.80 MB
award.pdf
PDF • 2.07 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .