Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L1 | Accepted-Finance BQR Conditions Satisfied. | |
| 2 | L2₹5.4 L+₹15,480 (2.93%)Accepted-Finance | L2 | Accepted-Finance BQR Conditions Satisfied. |
Tender Value
₹4.6 L
EMD Value
₹4,500
Closing Date
8 Dec 2021, 2:00 pmClosed
The SE/Operation/TTPS
Office of the SE/Operation/TTPS
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends and fittings between Mills D, E and F and Boiler during 2021-2022 annual overhaul
2021_EB_214490_1
CE/SE/O/TTPS/Spec.No.225/21-22
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR said in NIT
5 documents required · 5 mandatory
₹0
₹4,500
10 Dec 2021
24 Nov 2021
9 Dec 2021
24 Nov 2021
8 Dec 2021
24 Nov 2021
Charges for loading and unloading the coal pipe (457 x 12.7mm) assembly, bends and transporting the coal pipe bends in trolley from stores to work site area including transport.
Charges for arresting the coal pipe firmly, dismantling victaulic coupling and lowering down the mill outlet elbows to 4.5 m. floor including charges for scaffolding.
Charges for inspection of mill outlet elbows and changing the deflector block if any lifting the elbows and assembling with proper alignment with the existing pipe line and removing coal pipe supports and devolution of scraps to stores.
Cutting the worn out pipes of varied length, grinding edges and welding with coal pipe collars in the respective area inclusive of cutting the new coal pipe of same length and devolution of scraps to stores. (Vertical portion)
Charges for removing the existing damaged hanger support assembly arrangements in the coal pipes for Assembly.
Rectification of hanger support rod fixture eye, strengthening the pin and its nuts for Assembly.
Charges for re fixing the hanger supports arrangements in its original position of the coal pipes without changing its elevation for Assembly.
Cutting of 10mm thick patches of various sizes and prepare the patches to suit the eroded portions of coal bends, inner Cone assembly and welding these patches including devolution of scraps to stores as per the direction of the engineer in charge.
Charges for arresting the coal pipe firmly, dismantling the eroded ceralin (Less than 90°) or MS bend by gas cutting, lowering the bends to the respective floor, assembling the new bend by welding after setting alignment and removing all coal pipe supports including charges for scaffolding.
Charges for arresting the coal pipe firmly, dismantling the victaulic coupling of 1 mtr length coal pipe, removing the eroded / damaged coal pipes and lowering the pipe to 0 mtr level including devolution the eroded coal pipe to central stores.
Charges for lifting the coal pipe and assembling in proper position with the existing coal pipe line and removing coal pipe temporary supports and devolution of scraps to stores.
Charges for removal of orifice 1 No. after dismantling the victaulic coupling, inspecting and inverting the same orifice or new orifice and assembling in position.
DURAIMANI ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .