Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.8 LAccepted-AOC | ₹67.8 L | L1 | Accepted-AOC Bidder is L1 |
| 2 | L2₹87.5 L+₹19.7 L (29.0%)Rejected-AOC PLOT NO 28 B NAHAR SINGH JI KA HATTA BHATI CIRCLE RATANADA JODHPUR RAJ 342011 | JODHPUR | JODHPUR | RAJASTHAN | 342011 | ₹87.5 L+₹19.7 L (29.0%) | L2 | Rejected-AOC Bidder is L2 |
| 3 | L3₹95.7 L+₹27.9 L (41.2%)Rejected-AOC | ₹95.7 L+₹27.9 L (41.2%) | L3 | Rejected-AOC Bidder is L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical No remarks found in WLR.Hence rejected. |
| Sl No | Description | Qty | Unit | M/S Vinod Kumar L1 | BEYLIM INFRA L2 | m/s vikas construction co. L3 |
|---|---|---|---|---|---|---|
| 1.00Note for item No 01 to 1.97:- A standing Bd of Offrs shall be convened by GE to inspect paint buckets brought by the contractor in sealed condition and to make note of Barcodes/QR Codes. Prior to each RAR board shall verify all empty containers alongwith Barcodes/QR Codes. Responsibility of presenting all paint defects with Barcodes/QRcodes in verifiable condition shall rest with contractor. | ||||||
| 1.10 | Material and labour for complete removal of existing treatment from wall Old plastered/unplastered surface, complete all as specified and directed. | 59,400 | Sqm | 15 ₹8,91,000 | 2 ₹1,18,800 Lowest | 5 ₹2,97,000 |
| 1.20 | Material and labour for applying one coat of acrylic waterbased interior grade primer @ 0.8 ltr (undiluted)/10Sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine having a pressure of 3000 PSI +/- 20%.including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed. | 9,400 | Sqm | 15 ₹1,41,000 Lowest | 20 ₹1,88,000 | 21 ₹1,97,400 |
| 1.30 | Material and labour for applying one coat of acrylic waterbased exterior grade primer @ 0.9 ltr (undiluted)/10Sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine having a pressure of 3000 PSI +/- 20%. .including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed. | 50,000 | Sqm | 20 ₹10,00,000 Lowest | 22 ₹11,00,000 | 34 ₹17,00,000 |
| 1.40 | Materials and labour for applying two coats of acrylic washable distemper @ 1.5kgs/10 Sq mtr diluted with water in 5:3 ratio applied over priming coat with fully automatic airless spray machine having a minimun pressure of 3000 PSI +/- 20%. .including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed.
Note : Minimum gap between subsequent coats shall be 6-8 hrs | 9,400 | Sqm | 50 ₹4,70,000 Lowest | 60 ₹5,64,000 | 61 ₹5,73,400 |
| 1.50 | Materials and labour for Finishing wall with water based anti-algal 100% acrylic smooth exterior emlusion having silicon additives in two coats @ 1.79 ltr / 10sqm diluted with water in 5:2 ratio applied over priming coat with fully automatic airless spray machine having a minimum pressure of 3000 PSI +/- 20%. .including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed.
Note : Minimum gap between subsequent coats shall be 6-8 hrs.
Note for item 1.10 to 1.50 :- The work shall be executed by applicator of OEM only. The applicator shall be in proper dress through out the contract period. The rates quoted shall deemed to include the same. OEM to ensure this aspect to maintain throughout contract period. | 48,000 | Sqm | 70 ₹33,60,000 Lowest | 115 ₹55,20,000 | 116 ₹55,68,000 |
| 1.60 | Taking down cement plaster of any description on brick walls, etc including raking out joints, hacking for key scrubbing down with water etc. Complete all as specified and directed. | 600 | Sqm | 20 ₹12,000 Lowest | 30 ₹18,000 | 32 ₹19,200 |
| 1.70 | Material and Labour for 15mm thick cement plastering in cement mortar 1:6 on brick on concrete surfaces on other than fair surface, finishing the surface even and fair without using extra cement. Complete all as specified and directed. | 200 | Sqm | 220 ₹44,000 | 200 ₹40,000 | 199 ₹39,800 Lowest |
| 1.80 | Material and Labour for Rendering 15mm thick cement plastering on fair/unfair faces of brick work or concrete surface in cement mortar 1:4 to be finished even and smooth (without using extra lime or cement) including WPC @ 200ml per 50Kg cement bag or as per manufacture instruction. Complete all as specified and directed.
Note : WPC will be measured and paid seperately under appropriate items. | 400 | Sqm | 320 ₹1,28,000 | 210 ₹84,000 Lowest | 215 ₹86,000 |
| 1.90 | Supply only liquid water proofing compound, ISI marked. Complete all as specified and directed. | 20 | Litre | 109.3 ₹2,186 | 100 ₹2,000 | 99 ₹1,980 Lowest |
Tender Value
₹80 L
EMD Value
₹1.4 L
Closing Date
27 Jul 2026, 6:00 pmClosed
CWE Jalandhar Cantt
HQ CWE Jalandhar Cantt PIN 144005
SMART PERIODICAL TO OTM and MD ACCN UNDER AGE BR I OF GE WEST JRC
2026_MES_769692_1
8326/11/E8
Open Tender
Civil Works
Item Rate
180 days
HQ CWE Jalandhar Cantt
Class C Category a (i) for contractors enlisted with MES
9 documents required · 9 mandatory
₹1,000
Yes
GE (West) Jalandhar Cantt
₹1.4 L
Yes
15 Sept 2026
22 Jun 2026
29 Jul 2026
22 Jun 2026
27 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Material and labour for complete removal of existing treatment from wall Old plastered/unplastered surface, complete all as specified and directed. | 59,400 | Sqm | - | - |
| 1.2 | Material and labour for applying one coat of acrylic waterbased interior grade primer @ 0.8 ltr (undiluted)/10Sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine having a pressure of 3000 PSI +/- 20%.including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed. | 9,400 | Sqm | - | - |
| 1.3 | Material and labour for applying one coat of acrylic waterbased exterior grade primer @ 0.9 ltr (undiluted)/10Sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine having a pressure of 3000 PSI +/- 20%. .including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed. | 50,000 | Sqm | - | - |
| 1.4 | Materials and labour for applying two coats of acrylic washable distemper @ 1.5kgs/10 Sq mtr diluted with water in 5:3 ratio applied over priming coat with fully automatic airless spray machine having a minimun pressure of 3000 PSI +/- 20%. .including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed.
Note : Minimum gap between subsequent coats shall be 6-8 hrs | - | Sqm | - | - |
| 1.5 | Materials and labour for Finishing wall with water based anti-algal 100% acrylic smooth exterior emlusion having silicon additives in two coats @ 1.79 ltr / 10sqm diluted with water in 5:2 ratio applied over priming coat with fully automatic airless spray machine having a minimum pressure of 3000 PSI +/- 20%. .including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Complete all as specified and directed.
Note : Minimum gap between subsequent coats shall be 6-8 hrs.
Note for item 1.10 to 1.50 :- The work shall be executed by applicator of OEM only. The applicator shall be in proper dress through out the contract period. The rates quoted shall deemed to include the same. OEM to ensure this aspect to maintain throughout contract period. | 50,000 | Sqm | - | - |
| 1.6 | Taking down cement plaster of any description on brick walls, etc including raking out joints, hacking for key scrubbing down with water etc. Complete all as specified and directed. | 600 | Sqm | - | - |
| 1.7 | Material and Labour for 15mm thick cement plastering in cement mortar 1:6 on brick on concrete surfaces on other than fair surface, finishing the surface even and fair without using extra cement. Complete all as specified and directed. | 200 | Sqm | - | - |
| 1.8 | Material and Labour for Rendering 15mm thick cement plastering on fair/unfair faces of brick work or concrete surface in cement mortar 1:4 to be finished even and smooth (without using extra lime or cement) including WPC @ 200ml per 50Kg cement bag or as per manufacture instruction. Complete all as specified and directed.
Note : WPC will be measured and paid seperately under appropriate items. | 400 | Sqm | - | - |
| 1.9 | Supply only liquid water proofing compound, ISI marked. Complete all as specified and directed. | 20 | Litre | - | - |
| 1.91 | Material and labour for preparation of newly plastered surface applying one coat of acrylic waterbased interior grade primer @ 0.8 Ltr (undiluted)/10Sq diluted with water in 1: 1 ratio to be applied with fully automatic airless spray machine having a pressure of 3000 PSI +/- 20%. .including cleaning of doors &windows,floors,glasses ,joinery electric fitting,wiring ,furniture etc with required cleaning materials Completed all as specified and directed. | 200 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender11.pdf
Tender Documents • 1.30 MB
BOQ_866568.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .