Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.8 LAccepted-Finance 270 17TH WARD KARUMALAIKOODAL METTUR DAM 2 | METTUR DAM | 1 | Accepted-Finance satisfied | |
| 2 | 2₹6.0 L+₹18,600 (3.18%)Accepted-Finance H 11 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 52 | METTUR DAM | SALEM | TAMIL NADU | 2 | Accepted-Finance satisfied |
Tender Value
₹7.9 L
EMD Value
₹7,900
Closing Date
5 May 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/M-II/MTPS-I
Superintending Engineer Mechanical-II Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP I Overhauling of 4 Nos gear boxes
2022_EB_229819_1
SE M II MTPS I CHP I OT 07 2022 2023
Open Tender
Miscellaneous Works
Works
28 days
MTPS-I
As per Tender Specification
5 documents required · 5 mandatory
₹0
₹7,900
Yes
12 May 2022
21 Apr 2022
6 May 2022
21 Apr 2022
5 May 2022
21 Apr 2022
180 days
Amount
Charges for decoupling gear box from head pulley slow speed coupling, removing RMT flexible element, and speed coupling, removing RMT flexible element, and brake assembly from bed. Drain oil from gear box, removing gear box bed bolt, removing the cooling fan cover from input shaft, leading and lifting the gear box from the bed.
Charges for cleaning the (spiral bevel input pinion, spiral bevel wheel and it is bearing & oil seals) dismantling the input assembly, removing the input bearing by using special type of puller inspecting the spiral bevel input pinion, spiral bevel wheel input bearing and oil seal, replacing if required.
Charges for assembling spiral bevel input pinion & wheel, 1st & 2nd intermediate shaft & wheel and output shaft & wheel in the gear box casing.
Charges for removing brake shoe 2 nos. from brake assembly, removing worn out liner from the shoe, marking, cutting and drilling new liner. Fixing & riveting the new liner with shoe assembly and lead the existing brake drum to ground floor, taking it to the MTPS site workshop and machining the outer dia of drum for uniform surface in order to removal of scorings if necessary. Assemble the shoe with the brake drum assembly.
Charges for setting the gear back lash, fixing the top cover of the gear box after applying the Anabond, tightening the bolt & nuts with proper gasket, filling gearbox oil up to the required level.
Assembling the gear box in position and alignment work which includes assembling the gear box in the bed, mounting the coupling in position and alignment with the motor.
T&P’s and consumables for Sl.No.1 to 6.
KPRABHAKARAN ENGINEERING CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .