| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC UTTAR PRADESH UP | ₹3.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 Cr+₹2.1 L (0.64%)Rejected-Finance | ₹3.3 Cr+₹2.1 L (0.64%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Arun Kumar L1 | ARUN KUMAR GUPTA L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all types of soil including all lift & lead also including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as per direction of the engineer-in-charge. | 4,560.81 | Cum | 49 ₹2,23,479.69 Lowest | 60 ₹2,73,648.6 |
| 2.00 | Providing & laying C.C. (A-20 M-15) (1:2:4) i/c all cost of material, labour and T&P etc complete. | 342.87 | Cum | 6,300 ₹21,60,081 | 6,090 ₹20,88,078.3 Lowest |
| 3.00 | Providing & laying R.C.C. (A-20 M-20) (1:1.5:3) i/c all cost of material, labour and T&P etc complete. | 45.79 | Cum | 6,900 ₹3,15,951 Lowest | 7,020 ₹3,21,445.8 |
| 4.00 | Providing & laying C.C. (A-20 M-20) (1:1.5:3) i/c all cost of material, labour and T&P etc complete. | 266.2 | Cum | 6,900 ₹18,36,780 | 6,720 ₹17,88,864 Lowest |
| 5.00 | Providing & laying C.C. ( A-40 M-10) (1:3:6) i/c all cost of material, labour and T&P etc complete. | 191.22 | Cum | 6,009 ₹11,49,040.98 | 6,003 ₹11,47,893.66 Lowest |
| 6.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar with cost of all cost of material, labour and T&P etc complete. | 468.34 | Cum | 5,608 ₹26,26,450.72 | 5,400 ₹25,29,036 Lowest |
| 7.00 | Providing and fixing P.V.C. Pipe 150mm dia & 6Kg./Sq. cm. pressure Kissan / Supreme quality or equivalent I.S.I. Mark including all cost of material, labour and T&P etc complete. | 99 | RM | 390 ₹38,610 | 330 ₹32,670 Lowest |
| 8.00 | Providing and fixing P.V.C. Pipe 100 mm dia & 6Kg./Sq. cm. pressure Kissan / Supreme quality or equivalent I.S.I. Mark including all cost of materials, T&P and labour etc. | 516 | RM | 270 ₹1,39,320 Lowest | 270 ₹1,39,320 Lowest |
| 9.00 | Providing Cement pointing (Struck Deep) on brick masonary in 1:3 Cement mortar including all cost of material, labour and T&P etc complete . | 1,554.34 | Sqm | 144 ₹2,23,824.96 | 139 ₹2,16,053.26 Lowest |
| 10.00 | Earth work in silt clearance including all lift & lead including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 20,003.5 | Cum | 30.3 ₹6,06,106.05 | 29 ₹5,80,101.5 Lowest |
Tender Value
₹3.6 Cr
EMD Value
₹7.3 L
Closing Date
7 Nov 2025, 4:00 pmClosed
SE 1st IWC Meerut
SE Office 1st IWC Meerut
As per the NIT
2025_UPIDC_1071640_14
04/SE-1/2025-26
Open Tender
Civil Works
Piece-work
180 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7.3 L
SE Office 1st IWC Meerut
2 Dec 2025
2 Nov 2025
7 Nov 2025
2 Nov 2025
7 Nov 2025
2 Nov 2025
6 Nov 2025
Amount
Earth work in foundation in all types of soil including all lift & lead also including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as per direction of the engineer-in-charge.
Providing & laying C.C. (A-20 M-15) (1:2:4) i/c all cost of material, labour and T&P etc complete.
Providing & laying R.C.C. (A-20 M-20) (1:1.5:3) i/c all cost of material, labour and T&P etc complete.
Providing & laying C.C. (A-20 M-20) (1:1.5:3) i/c all cost of material, labour and T&P etc complete.
Providing & laying C.C. ( A-40 M-10) (1:3:6) i/c all cost of material, labour and T&P etc complete.
Providing & laying 1st class (M-150) brick work with 1:4 cement mortar with cost of all cost of material, labour and T&P etc complete.
Providing and fixing P.V.C. Pipe 150mm dia & 6Kg./Sq. cm. pressure Kissan / Supreme quality or equivalent I.S.I. Mark including all cost of material, labour and T&P etc complete.
Providing and fixing P.V.C. Pipe 100 mm dia & 6Kg./Sq. cm. pressure Kissan / Supreme quality or equivalent I.S.I. Mark including all cost of materials, T&P and labour etc.
Providing Cement pointing (Struck Deep) on brick masonary in 1:3 Cement mortar including all cost of material, labour and T&P etc complete .
Earth work in silt clearance including all lift & lead including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.
Brick on edge soling with straight over burnt bricks on canal service road including joints filled with local sand, preparation of base to proper slope, ramming, dressing and including supply of all cost of material, labour andT&P etc. required for proper completion of work.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressingthe surface to the required levels and slopes and also including all lift & lead as directed by Engineer-in-charge.
Steel Reinforcement(Fe 550) for RCC work i/c cost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work.
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work.
Finishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 ltr/10 sqm (Asian or Berger Brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg/10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
Laying L.D.P.E. film i/c cost of scaffolding labour & T&P etc. for proper completion of work.
Fixing of RCC (A-20 M-20) (1:1.5:3) precast boundry pillar including all of cost material, labour and T&P etc. required for proper complition of work as per direction of Engineer-in-Charge.
Painting and writting letters including cost of material for writing letter on V.R.B./ Boundary pillar including all cost of materials, T&P and labour etc complete.
Supplying /filling Local Sand under CC lining as subgrade & filter i/c all cost of material, labour T&P etc required for proper completion of work.
Making Construction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material, labour, T&P etc. required for proper completion of work.
Earthwork in filling for outlets etc including 195 m lead & 1.50 m lift and compaction, ramming , dressing to required section and proper completion of work as per direction of Engineer in - Charge.
Providing & laying Single brick lining laid flat over 12 mm thick 1:4 cement mortar i/c all cost of material, labour and T&P etc. complete.
ARUN KUMAR GUPTA (BID ID -5659679)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.19 MB
BOQ_1995583.xls
BOQ • 0.28 MB
TD6.pdf
Tender Documents • 7.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .