Tender Value
₹4.6 L
EMD Value
₹5,000
Closing Date
18 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer VP Thiruporur
Block Development Office Thiruporur
Construction of Compound Wall and Hand Pump in Periyar nagar BG at Manamathy panchayat in Thiruporur Panchayat Union in Chengalpattu District for the Year 2023 - 2024 having Package No . 15/2023 - 2024
2023_RDTN_342536_1
RCNO 594/2023/B2/dt5.7.2023
Open Tender
Civil Works - Buildings
Item Rate
90 days
Manamathy
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹5,000
Yes
Block Development Office Thiruporur
18 Jul 2023
13 Jul 2023
18 Jul 2023
13 Jul 2023
18 Jul 2023
13 Jul 2023
15 Jul 2023
Amount
Construction of Compound wall and Hand Pump in Periyar nagar BG in Manampathy Panchayat in Thiruporur Panchayat Union.in Chengalpattu District for the Year 2023 - 2024 having Package No . 15/2023 - 2024
Earth work excavation for foundation in all soils and sub soils to full depth etc
Filling with Msand including cost and Conveyance of all charges etc.
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
RCC 1:1.5:3 mix using (One cement two sand and four hard bronken granite stone) using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to site and all labour charges at site including curing etc comp
RCC 1:1.5:3 mix using (One cement two sand and four hard bronken granite stone) using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to site and all labour charges at site including curing etc comp
Supplying and centering of sides and sofits includign supports and strutting upto base
Supplying and centering of sides and sofits includign supports and strutting Above base
Supplying and fabrication of steel including cost and conveyance of all labour charges '
Brick work in cm 1:5 for super structure usign stock brick including all cost and labour charges etc.complete . Complying with standard specification etc.
Plastering with cm 1:5 mix using 10mm thick including all charges
Exterior emulsion of wall two coat plastic emulsion Paint including cost and conveyance of all materials to site and all labour charges etc complete
Charges for conducting Geo Physical Survey
Drilling of 150mm dia bore well in Hard rock area to any required depth as direct by the departmental officers including labour charges for inserting casing pipe, assembly in the drilled holesincluding transportation charges for the rig and supporting vehicles from one place to another place. Sedimentrary Strata by using Rotory rig by first drilling a pilot bore 08 150mm dia direct mud circulation method
supply and delivery of 150mm dia PVC Plain ( C.S ) Casing Pipe.
Labour Charges for Fixing 150mm dia PVC Plain ( C.S ) Casing Pipe.
Supply and delivery of India Mark II deep borewell Hand pump with 30m (10x3m) connecting rods, cylinders and telescopic stand suitable for 150mm dia bore
supply and Delivery of 32mm Gi pipe 3mtr length
supply and Delivery of 32mm Gi pipe Coupling
Erection charges for India mark II hand pump set etc complete
Construction of Plateform including cost of all materials as per RD type design
Construction of soak pit of size 1.00m dia and 1.00m depth and filling of 32mm HBG sand filling as top layer of 8cm thick including voids and covering with RCC cover slab and finishing around neatly etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
mohan p
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .