Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.6 LAccepted-AOC | ₹10.6 L | 1 | Accepted-AOC L-I |
| 2 | 2₹10.7 LRejected-Finance | ₹10.7 L | 2 | Rejected-Finance higher rates offered than L-1 |
| 3 | 3₹12.8 LRejected-Finance VILL PO SUHIN TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹12.8 L | 3 | Rejected-Finance higher rates offered than L-1 |
| 4 | 4₹13.2 LRejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171002 | ₹13.2 L | 4 | Rejected-Finance higher rates offered than L-1 |
| 5 | 5₹13.4 LRejected-Finance | ₹13.4 L | 5 | Rejected-Finance higher rates offered than L-1 |
| Sl No | Description | Qty | Unit | Atul Shrma L6 | HARPREET SINGH L9 | Chander Kumar L1 | Ram L14 | Ramesh Chand Sharma L12 | Arjun Singh Govt Contractor L8 | Him Associates L13 | Rana Contractor L2 | Anju Verma L5 | Rajat Kumar L10 | Sikander Mohan L7 | Rajat sharma L11 | Saleem Mohammad L3 | Nirmal Singh L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m. in All Kind of SOil | 172.2 | Cum | 200 ₹34,440 | 220 ₹37,884 | 150 ₹25,830 | 350 ₹60,270 | 450 ₹77,490 | 390 ₹67,158 | 390 ₹67,158 | 90 ₹15,498 | 200 ₹34,440 | 340 ₹58,548 | 300 ₹51,660 | 570 ₹98,154 | 180 ₹30,996 | 240 ₹41,328 |
| 2.00 | Providing and laying in position cement concrete of 1:3:6 grade excluding the cost of centering and shuttering. | 20.79 | Cum | 4,500 ₹93,555 | 4,100 ₹85,239 | 3,800 ₹79,002 | 6,600 ₹1.4 L | 6,200 ₹1.3 L | 5,000 ₹1.0 L | 6,600 ₹1.4 L | 3,700 ₹76,923 | 4,500 ₹93,555 | 6,190 ₹1.3 L | 5,550 ₹1.2 L | 6,000 ₹1.2 L | 4,000 ₹83,160 | 4,200 ₹87,318 |
| 3.00 | Providing and laying in position cement concrete of 1:2:4 grade complete excluding the cost of centering and shuttering. | 86.46 | Cum | 6,500 ₹5.6 L | 4,600 ₹4.0 L | 4,500 ₹3.9 L | 9,000 ₹7.8 L | 8,900 ₹7.7 L | 6,000 ₹5.2 L | 8,035 ₹6.9 L | 4,350 ₹3.8 L | 6,100 ₹5.3 L | 6,900 ₹6.0 L | 6,150 ₹5.3 L | 6,500 ₹5.6 L | 5,950 ₹5.1 L | 5,500 ₹4.8 L |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form walls (any thickness) including attached pilasters, butteresses, plinth and and string courses and the like etc. | 298.27 | sqm | 200 ₹59,654 | 250 ₹74,567.50 | 225 ₹67,110.75 | 350 ₹1.0 L | 350 ₹1.0 L | 400 ₹1.2 L | 470 ₹1.4 L | 300 ₹89,481 | 120 ₹35,792.40 | 370 ₹1.1 L | 370 ₹1.1 L | 300 ₹89,481 | 100 ₹29,827 | 350 ₹1.0 L |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete | 3,950 | Kg | 80 ₹3.2 L | 90 ₹3.6 L | 75 ₹3.0 L | 119 ₹4.7 L | 110 ₹4.3 L | 90 ₹3.6 L | 99 ₹3.9 L | 80 ₹3.2 L | 90 ₹3.6 L | 85 ₹3.4 L | 85 ₹3.4 L | 95 ₹3.8 L | 80 ₹3.2 L | 75 ₹3.0 L |
| 6.00 | Earth work in rough excavation, banking excavated earth in layers, breaking clods, watering, each layer. | 1,078.55 | cum | 200 ₹2.2 L | 450 ₹4.9 L | 150 ₹1.6 L | 201 ₹2.2 L | 200 ₹2.2 L | 240 ₹2.6 L | 300 ₹3.2 L | 130 ₹1.4 L | 220 ₹2.4 L | 250 ₹2.7 L | 250 ₹2.7 L | 470 ₹5.1 L | 190 ₹2.0 L | 230 ₹2.5 L |
| 7.00 | Providing and Laying , jointing and testing in trenches galvanized mild steel flanged/buttweld pipes of 150 mm dia and grade conforming to IS 1239-2004 for scoring arrangement | 23.7 | Rmt | 2,000 ₹47,400 | 1,900 ₹45,030 | 1,000 ₹23,700 | 2,400 ₹56,880 | 3,500 ₹82,950 | 2,495 ₹59,131.50 | 2,500 ₹59,250 | 1,500 ₹35,550 | 1,500 ₹35,550 | 1,800 ₹42,660 | 1,800 ₹42,660 | 2,000 ₹47,400 | 2,500 ₹59,250 | 2,500 ₹59,250 |
| 8.00 | Providing and fixing C.I sluice valve(with hand wheel-non rising) of make as per IS: 780 (including brass spindle and as per IS: 2906 Class-II complete with bolts., nuts, rubber insertion etc. of 150 mm dia complete in all respect | 1 | No | 15,000 ₹15,000 | 19,000 ₹19,000 | 10,000 ₹10,000 | 25,000 ₹25,000 | 15,000 ₹15,000 | 2,500 ₹2,500 | 25,000 ₹25,000 | 16,000 ₹16,000 | 15,000 ₹15,000 | 19,500 ₹19,500 | 1,800 ₹1,800 | 22,000 ₹22,000 | 26,000 ₹26,000 | 2,600 ₹2,600 |
| 9.00 | Providing & fixing and welding of M.S.flanges welding of MS flanges on three Layers (one layer on inner face and two layers on outer face of each flange) G.I. pipe on both end (the cost of G.I. pipe and laying to be measured & paid separately) & fixed with nuts, bolts of required size and synthetic rubber gasket c including all kinds of leads and lifts150 mm dia | 4 | Pair | 500 ₹2,000 | 1,300 ₹5,200 | 1,000 ₹4,000 | 2,000 ₹8,000 | 4,200 ₹16,800 | 1,000 ₹4,000 | 1,000 ₹4,000 | 1,100 ₹4,400 | 1,000 ₹4,000 | 1,000 ₹4,000 | 1,000 ₹4,000 | 3,600 ₹14,400 | 1,100 ₹4,400 | 1,100 ₹4,400 |
| 10.00 | Supply anf fixing of Sign Board of size 1.20 m x 0.90 m, to be embedd in concrete structure. The matter of writing and colour of borad & letters will be advised by the IDP Office. | 1 | No | 7,000 ₹7,000 | 7,000 ₹7,000 | 1,500 ₹1,500 | 3,600 ₹3,600 | 4,500 ₹4,500 | 7,900 ₹7,900 | 7,870 ₹7,870 | 3,000 ₹3,000 | 2,000 ₹2,000 | 7,050 ₹7,050 | 7,050 ₹7,050 | 9,000 ₹9,000 | 7,850 ₹7,850 | 5,000 ₹5,000 |
Tender Value
₹18.5 L
EMD Value
₹30,000
Closing Date
17 Jan 2025, 5:00 pmClosed
DPO IDP Una
office of DPO IDP Una opposite KVK Rampur
Construction of Primary Earthen Dam with RCC, Core wall in Dange wala Chow at Village Tihra Uprala Ward No 6 GP Tihra C-II APO Thanakalan under DPO IDP Una HP during 2024-25
2025_CPD1_97478_1
W/CC Check Dam/Thk/ 110/2024-25/Retender
Open Tender
Agricultural or Forestry
45 days
Una
Please refer tender documents
8 documents required · 8 mandatory
₹500
DPO IDP
₹30,000
20 Dec 2025
4 Jan 2025
18 Jan 2025
4 Jan 2025
17 Jan 2025
4 Jan 2025
4 Jan 2025 - 17 Jan 2025
Amount
Excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m. in All Kind of SOil
Providing and laying in position cement concrete of 1:3:6 grade excluding the cost of centering and shuttering.
Providing and laying in position cement concrete of 1:2:4 grade complete excluding the cost of centering and shuttering.
Centering and shuttering including strutting, propping etc. and removal of form walls (any thickness) including attached pilasters, butteresses, plinth and and string courses and the like etc.
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete
Earth work in rough excavation, banking excavated earth in layers, breaking clods, watering, each layer.
Providing and Laying , jointing and testing in trenches galvanized mild steel flanged/buttweld pipes of 150 mm dia and grade conforming to IS 1239-2004 for scoring arrangement
Providing and fixing C.I sluice valve(with hand wheel-non rising) of make as per IS: 780 (including brass spindle and as per IS: 2906 Class-II complete with bolts., nuts, rubber insertion etc. of 150 mm dia complete in all respect
Providing & fixing and welding of M.S.flanges welding of MS flanges on three Layers (one layer on inner face and two layers on outer face of each flange) G.I. pipe on both end (the cost of G.I. pipe and laying to be measured & paid separately) & fixed with nuts, bolts of required size and synthetic rubber gasket c including all kinds of leads and lifts150 mm dia
Supply anf fixing of Sign Board of size 1.20 m x 0.90 m, to be embedd in concrete structure. The matter of writing and colour of borad & letters will be advised by the IDP Office.
Rana Contractor (BID ID -471973)
Saleem Mohammad (BID ID -471935)
Nirmal Singh (BID ID -471870)
Anju Verma (BID ID -471914)
Atul Shrma (BID ID -471128)
Sikander Mohan (BID ID -471923)
Arjun Singh Govt Contractor (BID ID -471915)
HARPREET SINGH (BID ID -471666)
Rajat Kumar (BID ID -471905)
Rajat sharma (BID ID -471885)
Ramesh Chand Sharma (BID ID -471911)
Him Associates (BID ID -471481)
Ram (BID ID -471907)
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid