Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.2 LRejected-Finance | ₹7.2 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹7.9 LRejected-Finance VILLAGE UMARIYA LAKHMAPUR SWAIJPUR HARDOI UP 241001 | HARDOI | HARDOI | UTTAR PRADESH | 241001 | ₹7.9 L | L3 | Rejected-Finance Rejected |
Tender Value
₹10 L
EMD Value
₹1 L
Closing Date
5 Feb 2026, 12:00 pmClosed
EE PD PWD Bulandshahr
EE PD PWD Bulandshahr
Repair work of Lakhavati Canal Minor Bridge at Km-2 of Balka to Naubatpur link road in District Bulandshahr
2026_CEMRT_1109770_1
377/1A Dt. 20.01.2026
Open Tender
Civil Works - Bridges
90 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹856
₹1 L
Yes
EE PD PWD Bulandshahr
12 May 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
30 Jan 2026 - 31 Jan 2026
31 Jan 2026
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Brick masonry work in cement mortar (1:3) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
RCC M25 Providing concrete for Plain/Reinforced cement concrete in super structure complete as per drawing and technical specifications Clauses 802, 803, 1202 & 1203 Sr. No. 13.1 Ref. No. 800 (M-25) Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications MORTH 13.08 (2706 & 2200) Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat preparation of surface etc. complete.(For Steel work) Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat preparation of surface etc. complete. (For Concrete work) Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_2049536.xls
BOQ • 0.75 MB
T1.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid