Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3231.7 CrAdmitted-Finance 154 FIRST FLOOR VARDHMAN CROWN MALL PLOT NO 2 SECTOR 19 DWARKA SOUTH WEST DELHI DELHI 110075 | SOUTH WEST DELHI | DELHI | 110075 | L1 | Admitted-Finance | |
| 2 | L2₹3577.6 Cr+₹345.8 Cr (10.7%)Admitted-Finance GR HOUSE HIRAN MAGRI SECTOR 11 UDAIPUR 313001 RAJASTHAN | UDAIPUR | UDAIPUR | RAJASTHAN | 313001 | L2 | Admitted-Finance | |
| 3 | L3₹3996 Cr+₹764.3 Cr (23.6%)Admitted-Finance A 898 TAGORE NAGAR LUDHIANA 141001 PUNJAB | LUDHIANA | LUDHIANA | PUNJAB | 141001 | L3 | Admitted-Finance | |
| 4 | L4₹4093.1 Cr+₹861.4 Cr (26.7%)Admitted-Finance 14 PANCHWATI COLONY RATANADA RATANADA JODHPUR JODHPUR RAJASTHAN 342011 | JODHPUR | RAJASTHAN | 342011 | L4 | Admitted-Finance | |
| 5 | L5₹4271.4 Cr+₹1039.7 Cr (32.2%)Admitted-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PNC Infratech Ltd L7 | GR Infraprojects L2 | NKC PROJECTS PVT. LTD. L1 | KNR CONSTRUCTIONS LIMITED L8 | Dineshchandra R.Agrawal Infracon Pvt.Ltd L5 | H.G. Infra Engineering Limited L4 | Ceigall Infra Projects Pvt Limited L3 | Oriental Structural Engineers Pvt. Ltd. L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km))”. | 1 | Lump Sum | 47,70,00,00,000 ₹47,70,00,00,000 | 35,77,57,00,000 ₹35,77,57,00,000 | 32,31,72,08,800 ₹32,31,72,08,800 Lowest | 51,55,00,00,000 ₹51,55,00,00,000 | 42,71,40,00,000 ₹42,71,40,00,000 | 40,93,11,00,000 ₹40,93,11,00,000 | 39,96,00,00,000 ₹39,96,00,00,000 | 44,85,50,00,000 ₹44,85,50,00,000 |
Tender Value
₹4734.2 Cr
EMD Value
₹47.3 Cr
Closing Date
8 Jul 2026, 3:00 pmClosed
Subodh Kumar
NHIDCL HQ New Delhi
Development, Maintenance, Management, Operation of Greenfield HSC from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on HAM for Pkg-1 From Km 0.000 to km 45.645, design length-45.645
2026_NHIDC_892270_1
NHIDCL/Meghalaya/HSC/Package01
Open Tender
Civil Works
PPP-BoT-HAM
1095 days
Meghalaya
Please refer tender documents
5 documents required · 5 mandatory
₹4.8 L
MD NHIDCL
₹47.3 Cr
19 Oct 2026
2 Jan 2026
9 Jul 2026
2 Jan 2026
8 Jul 2026
10 Feb 2026
2 Jan 2026 - 23 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis” for Package-1: From Km 0+000 to Km 45+645 (Design Length – 45+645 Km))”. | - | Lump Sum | 2,80,96,22,642 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.12 MB
RFP.pdf
Tender Documents • 1.14 MB
AllTCS.pdf
Tender Documents • 19.11 MB
GADPart2.pdf
Tender Documents • 31.72 MB
MiscDrawings.pdf
Tender Documents • 7.86 MB
GADPart3.pdf
Tender Documents • 28.14 MB
PPPart2.pdf
Tender Documents • 32.73 MB
PPPart3.pdf
Tender Documents • 29.58 MB
GADPart1.pdf
Tender Documents • 33.86 MB
DCAandSchEonwards.pdf
Tender Documents • 1.89 MB
SignagePlan.pdf
Tender Documents • 18.64 MB
GeotechnicalReport.pdf
Tender Documents • 22.74 MB
SRTReports.pdf
Tender Documents • 14.55 MB
ScheduleABCD.pdf
Tender Documents • 11.15 MB
PPPart1.pdf
Tender Documents • 34.22 MB
BOQ_937855.xls
BOQ • 0.25 MB
Corrigendum12HSCPkg01.pdf
PDF • 0.23 MB
ModifiedPPPART5.pdf
PDF • 32.48 MB
ModifiedPPPART4.pdf
PDF • 20.17 MB
ModifiedPPPART3.pdf
PDF • 26.72 MB
ModifiedPPPART2.pdf
PDF • 29.26 MB
ModifiedPPPART1.pdf
PDF • 28.88 MB
ModifiedTechnical Schedules.pdf
PDF • 10.27 MB
ModifiedSignagePlan.pdf
PDF • 21.43 MB
ModifiedRFP.pdf
PDF • 1.49 MB
ModifirdExecutivesummary.pdf
PDF • 5.43 MB
Modified TCS.pdf
PDF • 20.03 MB
ModifiedDCA.pdf
PDF • 2.30 MB
ModifiedMiscDrawing.pdf
PDF • 7.47 MB
ModifiedNIT.pdf
PDF • 0.22 MB
Corr11.pdf
PDF • 0.26 MB
C-10-Package-1-HSC.pdf
PDF • 0.17 MB
Corrigendum9.pdf
PDF • 0.18 MB
Corrigendum08.pdf
PDF • 0.46 MB
Corr-07-HSC-Pkg01.pdf
PDF • 0.67 MB
Corrigendum06.pdf
PDF • 0.42 MB
HSCPkg01.pdf
PDF • 0.25 MB
Corrigendum05.pdf
PDF • 1.72 MB
Corrigendum04.pdf
PDF • 0.47 MB
GAD3compressed.pdf
PDF • 35.35 MB
GAD2.pdf
PDF • 31.13 MB
GAD1.pdf
PDF • 33.20 MB
SIGNAGEPLAN.pdf
PDF • 21.22 MB
CorrigendumIII.pdf
PDF • 0.62 MB
GeotechnicalReport.pdf
PDF • 34.35 MB
Executivesummary.pdf
PDF • 6.24 MB
HYDRAULICS.pdf
PDF • 2.15 MB
MainReport.pdf
PDF • 7.76 MB
MISCDrawing.pdf
PDF • 7.47 MB
PP3.pdf
PDF • 26.00 MB
PP2.pdf
PDF • 31.39 MB
PP1.pdf
PDF • 32.11 MB
RevisedDCAArticleSchEonwards.pdf
PDF • 2.44 MB
RevisedTechnicalSchedulesABCD.pdf
PDF • 9.96 MB
TCS.pdf
PDF • 13.43 MB
Utilityrelocationplan.pdf
PDF • 3.39 MB
ReplytoPrebid.pdf
PDF • 19.09 MB
Corrigendum02.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .