Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC | ₹23.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹23.6 L+₹30,241.20 (1.30%)Rejected-Finance | ₹23.6 L+₹30,241.20 (1.30%) | L2 | Rejected-Finance not lowest |
| 3 | L3₹24.0 L+₹64,231.32 (2.75%)Rejected-Finance | ₹24.0 L+₹64,231.32 (2.75%) | L3 | Rejected-Finance not lowest |
Tender Value
₹25.0 L
EMD Value
₹49,986
Closing Date
14 Jul 2026, 4:00 pmClosed
Executive Engineer-I
Const. Office, P.U. Campus, Sector-14, Chandigarh
Providing Rain Harvesting System for Girls Hostel No 11 in PU South Campus Sector 25 Chandigarh
2026_PU_93371_1
278-88/EEI
Open Tender
Civil Works
Percentage
120 days
Panjab University South Campus, Sector - 25, Chd
as per NIT
2 documents required · 2 mandatory
₹0
₹49,986
1 Sept 2026
16 Jun 2026
15 Jul 2026
16 Jun 2026
14 Jul 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) /manualmeans over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | - | - | - | - |
| 0.0 | All kinds of soil. (DSR ref. 2.6.1) | 218 | Cum | 165 | ₹35,970 |
| 0.0 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : | - | - | - | - |
| 0.0 | All kinds of soil | - | - | - | - |
| 0.0 | Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia. (DSR ref. 2.10.1.2) | 220 | Rmt | 299 | ₹65,780 |
| 0.9 | Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm (DSR ref. 2.10.1.3) | 200 | Rmt | 467 | ₹93,400 |
| 0.0 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating Each deposited layer by ramming and watering, lead up to 50 m and all lift (DSR ref. 3.25) | 90 | Cum | 145 | ₹13,050 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth leve | - | - | - | - |
| 0.9 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR ref. 4.1.3) | 1 | Cum | 7,712 | ₹7,712 |
| 0.0 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR ref. 4.1.10) | 15 | Cum | 5,589 | ₹83,835 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.80 MB
BOQ_114315.xls
BOQ • 0.33 MB
DATEEXTEND2.pdf
PDF • 0.28 MB
DATEEXTEND.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .