Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.1 LAccepted-AOC | ₹4.1 L | L-1 | Accepted-AOC Selected as a L-1 bidder |
| 2 | L-2₹4.3 LRejected-Finance | ₹4.3 L | L-2 | Rejected-Finance Quoted value is in higher side |
| 3 | L-3₹4.4 LRejected-Finance | ₹4.4 L | L-3 | Rejected-Finance Quoted value is in higher side |
| 4 | L-4₹4.4 LRejected-Finance | ₹4.4 L | L-4 | Rejected-Finance Quoted value is in higher side |
| Sl No | Description | Qty | Unit | Indra Deo Prasad L4 | BALAI CHAND KALI L1 | SOMA ENGINEERING WORKS L2 | KARMAKAR ENGINEERING WORKS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Making & flexible platform at ban tone side.
a) Semi-skilled-4nosX2shiftX2days=16 Heads@ 17 67 .30=2827 6.80
b) Skilled-lno.X2shiftX2days=4 Heads@ 1810.37=7 247.48 | 1 | NOS. | 38,360 ₹38,360 | 35,518.28 ₹35,518.28 | 37,290 ₹37,290 | 38,005 ₹38,005 |
| 2.00 | Dismantling/opening old 8" seamless pipe (damaged)
8"dia seamless pipe from bottom to surface at pit no. 2.
a) Semi-skilled-SnosX2shiftX3days=48 Heads@ 17 67 .3O=84830.40
b ) S k i I I e d -2 n o. X 2 s h iftX3 d ay s= 12 H e a d s @ 1 8 1 0.37 =217 24. 44 | 1 | NOS. | 1,15,080 ₹1,15,080 | 1,06,554.84 ₹1,06,554.84 | 1,11,880 ₹1,11,880 | 1,14,014 ₹1,14,014 |
| 3.00 | Making/fabricaating of banton brackets (tool bend)
a ) Se m i-s ki I I ed-4nosX 1s h ift =4 Hea ds @ 1767 .30=7069.20
b) Skilled-1no.X3shift=3 Heads@ 1810.37=5431.11 | 1 | NOS. | 13,500 ₹13,500 | 12,500.31 ₹12,500.31 | 13,125 ₹13,125 | 13,375 ₹13,375 |
| 4.00 | Making/fabricating and threading of 'U'clamp
for banton shaft in the mine
a ) Sem i-ski I led-4nosX3shift=12 Heads@ 1767 .3O= 21207 .60
b) Skil led-2 no.X3shift =06 Heads@ 181 O.37 = 10862.22 | 1 | NOS. | 34,635 ₹34,635 | 32,069.82 ₹32,069.82 | 33,670 ₹33,670 | 34,315 ₹34,315 |
| 5.00 | Making of s/pipe bracket and welding
for flange in the pipe (pipe-25 both side)
a ) Sem i-ski I led-4nosX1sh iftX2days= 8 Heads @ 1767. 30= 74,138.40
b) Skilled- 1 no.Xl.shiftX2days=02 Heads@ 181 O.37 = 362O.7 4 | 1 | NOS. | 19,180 ₹19,180 | 17,759.14 ₹17,759.14 | 18,650 ₹18,650 | 19,002 ₹19,002 |
| 6.00 | lnstallation &lowering of 5" dia seamless pipe New
in the mine shaft (approx depth-150mtr.) Pit No.2
a) Semi-skilled-l0nosX3shift=30 [email protected]= 53019
b) Ski I led-2 no.X3s h ift=05 H eads @ 18 1 O.37 =10852.22 | 1 | Nos. | 68,990 ₹68,990 | 63,881.22 ₹63,881.22 | 67,075 ₹67,075 | 68,353 ₹68,353 |
| 7.00 | Consumable materials:-
a) Oxygen Gas(including rent&fare)-9nos @590/- =5310.00
b) D.A. Gas - 3 nos @2490/-=7470.OO
c) Bolt & Nut (different size) - 120kg @7201- = 14400.00
d) Welding Electrodes - 4mm -16packet @790/- =12640.00
e) H.T. Bolt & Nut Bolt (OD _28mm X L-130 mm) 16 nos @480/- = 7680.00
f) 'U' Clamping for flexible rope -8nos @110 = 880.00 | 1 | Nos. | 52,250 ₹52,250 | 48,380 ₹48,380 | 50,800 ₹50,800 | 51,767 ₹51,767 |
| 8.00 | Overhead profit @ 10% | 1 | NOS. | 34,199 ₹34,199 | 31,666.36 ₹31,666.36 | 33,249 ₹33,249 | 33,883.1 ₹33,883.1 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 67,714.92 ₹67,714.92 | 62,699.39 ₹62,699.39 | 65,833.02 ₹65,833.02 | 67,088.54 ₹67,088.54 |
Tender Value
₹4.1 L
EMD Value
₹5,200
Closing Date
4 Feb 2025, 5:00 pmClosed
General Manager, Kunustoria Area
O/o the General Manager, Kunustoria Area, P.O-Toposi, Paschim Bardhaman, 713362, (W.B)
Installation of new shaft range and dismantling the same at pit no-2 of parasea colliery .
2025_ECL_326353_1
ECL/KNT/EnM/e-Ten/24-25/33 dt.18.01.2025
Open Tender
Miscellaneous Works
30 days
Parasea Colliery
As per NIT
4 documents required · 4 mandatory
₹5,200
16 Jan 2026
21 Jan 2025
5 Feb 2025
21 Jan 2025
4 Feb 2025
22 Jan 2025
21 Jan 2025 - 29 Jan 2025
Amount
Making & flexible platform at ban tone side. a) Semi-skilled-4nosX2shiftX2days=16 Heads@ 17 67 .30=2827 6.80 b) Skilled-lno.X2shiftX2days=4 Heads@ 1810.37=7 247.48
Dismantling/opening old 8" seamless pipe (damaged) 8"dia seamless pipe from bottom to surface at pit no. 2. a) Semi-skilled-SnosX2shiftX3days=48 Heads@ 17 67 .3O=84830.40 b ) S k i I I e d -2 n o. X 2 s h iftX3 d ay s= 12 H e a d s @ 1 8 1 0.37 =217 24. 44
Making/fabricaating of banton brackets (tool bend) a ) Se m i-s ki I I ed-4nosX 1s h ift =4 Hea ds @ 1767 .30=7069.20 b) Skilled-1no.X3shift=3 Heads@ 1810.37=5431.11
Making/fabricating and threading of 'U'clamp for banton shaft in the mine a ) Sem i-ski I led-4nosX3shift=12 Heads@ 1767 .3O= 21207 .60 b) Skil led-2 no.X3shift =06 Heads@ 181 O.37 = 10862.22
Making of s/pipe bracket and welding for flange in the pipe (pipe-25 both side) a ) Sem i-ski I led-4nosX1sh iftX2days= 8 Heads @ 1767. 30= 74,138.40 b) Skilled- 1 no.Xl.shiftX2days=02 Heads@ 181 O.37 = 362O.7 4
lnstallation &lowering of 5" dia seamless pipe New in the mine shaft (approx depth-150mtr.) Pit No.2 a) Semi-skilled-l0nosX3shift=30 [email protected]= 53019 b) Ski I led-2 no.X3s h ift=05 H eads @ 18 1 O.37 =10852.22
Consumable materials:- a) Oxygen Gas(including rent&fare)-9nos @590/- =5310.00 b) D.A. Gas - 3 nos @2490/-=7470.OO c) Bolt & Nut (different size) - 120kg @7201- = 14400.00 d) Welding Electrodes - 4mm -16packet @790/- =12640.00 e) H.T. Bolt & Nut Bolt (OD _28mm X L-130 mm) 16 nos @480/- = 7680.00 f) 'U' Clamping for flexible rope -8nos @110 = 880.00
Overhead profit @ 10%
Total impact of GST for the purpose of CTC
SOMA ENGINEERING WORKS (BID ID -1123699)
KARMAKAR ENGINEERING WORKS (BID ID -1123880)
Indra Deo Prasad (BID ID -1123366)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_338267.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid