Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹7,912.62 (5.98%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.4 L+₹11,438.12 (8.64%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.5 L+₹15,668.71 (11.8%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹2,820
Closing Date
28 Jul 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Upgradation of Cremation Ground with water cooler and benches at Bachayal Pyt. Chanu Chak Block Marh District Jammu under Scheme District Capex Budget PRI for Financial Year 2026-27. (PYT LEVEL)
2026_RDPR_316135_1
e-NIT No. 147 REWJ of 2026-27 dated 15-07-2026
Open Tender
Civil Works
Percentage
30 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹2,820
14 Aug 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil including all leads, lift and carriage complete. | - | cum | 479.3 | - |
| 2 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40mm nominal size) | 0.2 | cum | 4,826.5 | ₹965.3 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 7,788.4 | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | - | kg | 123.2 | - |
| 5 | Centering and shuttering including strutting~ propping etc | - | sqm | 286 | - |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes
etc.) trusses etc., including cutting , hoisting , fixing in position and
applying a priming coat of approved steel primer, including welding and
bolted with special shaped washers etc. complete. | - | kg | 156.95 | - |
| 7 | Providing and fixing precoated galvanized iron profile sheets (size, shape
and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+
0.05 %) total coated thickness with zinc coating 120 grams per sqm as per
IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have
protective guard film of 25 microns minimum to avoid scratches during
transportation and should be supplied in single length upto 12 metre or as
desired by Engineer-in-charge. The sheet shall be fixed using self drilling
/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto
any pitch in horizontal/ vertical or curved surfaces, excluding the cost of
purlins, rafters and trusses and including cutting to size and shape
wherever required. | - | sqm | 706 | - |
| 8 | CARRIAGE OF SAND 10 KM | 3 | cum | 279.04 | ₹837.12 |
| 9 | CARRIAGE OF AGG 10 KM | 3.1 | cum | 279.04 | ₹865.02 |
| 10 | enagaed labour for disposal of malba from site to dumping place and jungle clearance | 2 | each | 553 | ₹1,106 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1029448.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .