| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹12.5 L+₹2.0 L (19.4%)Rejected-AOC KAMRUP METRO ASSAM 781007 INDIA UDYAM AS 03 0003543 | KAMRUP METRO | ASSAM | 781007 | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹13.9 L+₹3.4 L (32.4%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder | |
| 4 | L4₹15.0 L+₹4.5 L (42.6%)Rejected-AOC | L4 | Rejected-AOC L4 Bidder | |
| 5 | L5₹20.1 L+₹9.6 L (91.7%)Rejected-AOC | L5 | Rejected-AOC L5 Bidder |
Tender Value
Refer Docs
EMD Value
₹35,650
Closing Date
8 Aug 2023, 3:00 pmClosed
Dy. general manager ( C and P)
DGM Office , Assam Petrochemical Limited , Dibrugarh . Namrup 786623
ANNUAL MAINTENANCE CONTRACT FOR NON IBR PIPE WELDING UNDERGROUND FIREWATER PIPELINE REPAIRING AND TANK REPAIR and MAINTENANCE
2023_ICD_31837_1
APL/CnP/Mech/maint/2023-24/184
Open Limited
Metals
Item Rate
365 days
APL Namrup
As per Tender Documents
3 documents required · 3 mandatory
₹360
₹35,650
Yes
13 Sept 2024
28 Jul 2023
9 Aug 2023
28 Jul 2023
8 Aug 2023
28 Jul 2023
Amount
NON-IBR PIPE WELDING JOBS:
PIPING (ABOVE GROUND): Transportation of all piping items from Owner's storage point to work site, fabrication including cutting, edge preparation, (inclusive of grinding the edge of pipe, pipe spools, fittinga flanges etc. to match with the mating edges of uneven / different thickness whenever required), fitup, bending, preheating whenever required, welding, threading and laying of pipes and pipe spools (spools along with supports) of all types and thickness over sleepers / overhead on pipe racks and at all elevations, hook ups with existing piping, connecting with equipment nozzles, strainers, steam traps, orifice assemblies, spray nozzles, rotameters, tappings for pressure gauges, thermowells, sample connections, sample coolers, closed sample system cabinets etc. and fixing of gaskets, bolts, nuts including application of torque whenever required & all other inline instruments and fittings, like elbows, reducers, tees, flanges, spectacles blinds and spacer & blinds, piping specials such as mitres and fabricated fittings, vents, drains (but excluding reinforcing pads), sw valves upto 1 1/2NB, steam supply/condensate recovery stations (cast/fabricated), supply of welding of strip as per EIL Std 7-51-01112 to all pipes before hydrotesting at exit points of units for earthing purpose, alignment, cleaning & flushing by water/compressed air, hydostatic, pneumatic, vacuum, spark testing and any other type of testing as specified drainig, drying by compressed air, performing positive material indentification (PMI) using alloy analysers, completing all such works in all respects (including preparation of isometrics as mentioned in the scope of works for the job) as per specifications, drawings and instructions of Engineer in-charge and return of surplus pipes & other materials to owner's storage point (CS Pipes, Flanges, Pipes & Pipe Fittings, Gaskets and Stud Bolts shall be supplied by M/s. APL as FIM) CARBON STEEL PIPING (NON-IBR), THK <= 10MM
NON-IBR PIPING FABRICATION & WELDING:
NON-IBR PIPING ERECTION, ALIGNMENT & WELDING:
FABRICATION, ERECTION & WELDING OF MS PLATES & STRUCTURAL STEEL WORKS
NON-IBR VALVES ERECTION: FLANGED / WAFER VALVES (UPTO 300#): Transportation of all types of valves (including special valves, motor operated valves, PSVs, TSVs, Control Valves, On-Off / Shutdown Valves, Self actuated valves) from Owner's storage points to worksite amd installation of valves for all rating including assembly of valves accessories like air bottles tec. if any, fixing of gaskets stud bolts/nuts whenever required as per drawing & specification and instruction of Engineer in-charge (NON-IBR Valves, Gaskets & Stud Bolts etc. shall be supplied by APL as FIM)
STAINLESS STEEL PIPE WELDING JOB: SS PIPING : Transportation of all piping items from Owner's storage point to work site, fabrication including cutting, edge preparation, (inclusive of grinding the edge of pipe, pipe spools, fittinga flanges etc. to match with the mating edges of uneven / different thickness whenever required), fitup, bending, preheating whenever required, welding, threading and laying of pipes and pipe spools (spools along with supports) of all types and thickness over sleepers / overhead on pipe racks and at all elevations, hook ups with existing piping, connecting with equipment nozzles, strainers, steam traps, orifice assemblies, spray nozzles, rotameters, tappings for pressure gauges, thermowells, sample connections, sample coolers, closed sample system cabinets etc. and fixing of gaskets, bolts, nuts including application of torque whenever required & all other inline instruments and fittings, like elbows, reducers, tees, flanges, spectacles blinds and spacer & blinds, piping specials such as mitres and fabricated fittings, vents, drains (but excluding reinforcing pads), valves, steam supply/condensate recovery stations (cast/fabricated), supply of welding of strip to all pipes before hydrotesting at exit points of units for earthing purpose, alignment, cleaning & flushing by water/compressed air, hydostatic, pneumatic, vacuum, spark testing and any other type of testing as specified drainig, drying by compressed air, performing positive material indentification (PMI) using alloy analysers, completing all such works in all respects (including preparation of isometrics as mentioned in the scope of works for the job) as per specifications, drawings and instructions of Engineer in-charge and return of surplus pipes & other materials to owner's storage point (SS Pipes, Flanges, Pipes & Pipe Fittings, Gaskets and Stud Bolts shall be supplied by M/s. APL as FIM)
ConstruSS PIPING FABRICATION & WELDING: Dia 1/2" - 16"
SS PIPING ERECTION, ALIGNMENT & WELDING: Dia 1/2" - 16"
For Water System (Pressure Piping) For CS Piping (Non IBR), Thickness <=10 mm Fabrication (Above Ground), For following Nominal Sizes -
CS PIPING FABRICATION & WELDING:
CS PIPING ERECTION, ALIGNMENT & WELDING:
For Water System (Pressure Piping) For CS Piping (Non IBR), Thickness <=10 mm, Erection (Under Ground) including Corrosion Protection Coating(Tape), For following Nominal Sizes -
CS PIPING FABRICATION & WELDING:
CS PIPING ERECTION, ALIGNMENT & WELDING:
TANK REPAIR & MAINTENANCE JOB:
Dismantling of existing MS Plates & Structurals by gas cutting
Dismantling of existing SS Plates by cutting / grinding
Dismantling of existing SS Plates by cutting / grinding Fabrication, Erection and Welding of SS Plate Works
PLATE WORK: Plate Works for Cone Roof Tank except internal floating roof (with a proper scaffolding & by taking proper safety measures by the contractor), shifting of materials from owner’s store to worksite, fabrication & erection of Shell and Bottom Plate (sketch plates & annular plate including backing strips), Cone Roof, Compression Ring / Knuckle Plate, Angle Fabricated Wind Girder, Bearing Plates for Pipe Supports, Datum Plates, Shell Manhole Necks, Bolting & Cover Flanges for Shell Manhole, Reinforcement Pad for Shell Manhole, Nozzle Reinforcing Pads, Roof Manhole Necks, Bolting & Cover Flanges for Roof Manhole, Reinforcement Pad for Roof Manhole, Pads for all the appurtenance & attachment, fabrication & erection of all items as per drawing, conducting test such as vaccum test, MP/DP test, pneumatic test, oil penetrant examination etc. for shell, bottom & roof as specified in drawing / specification / code, preparation of day to day inspection reports as per QAP approved by APL, As Built Drawings for final submission, providing all temporary structures / scaffolding / clamps / wedges including supply of all consumables, labours, equipments, machineries, tools & tackles etc. to complete the works in all respect as per drawing, specification, standard, code, scope of works, scope of supply and instruction of Engineer In-charges of APL including reconciliation of Free Issue Materials (FIM) & returning of surplus/scrap materials to owner’s store
STRUCTURALS / PIPES: Fabrication, erection, inspection & testing of steel structures for cone roof supporting structures (supporting structures will be required to install on top of roof plates instead underside shown in the drawing & accordingly the drawing may be revised) including curb angle, spiral stairway, top handrailing, intermediate platform, grating of stairway steps and platform, name plate, earthing connections, angle fabricated wind girders, structural supports by using the re-usable materials from dismantling & removal as per good condition of materials as well as new materials to be supplied by APL, preparation of day to day inspection reports as per QAP approved by APL, As Built Drawings, supply of all consumables, labours, machineries & equipments to complete the works as per drawing, specification, standards, codes, scope of works & supply as per instruction of Engineer In-charges of APL including reconciliation of Free Issue Materials (FIM) and returning of surplus / scrap materials to owner’s store
APPURTENANCES:
Fabrication, Installation, Inspection & Testing as required for the Nozzles (reinforcing pads covered under plate work) of Carbon Steel Pipes, nozzle flanges, blind/matching flange as per drawing & standards along with gaskets, bolting, valves & other instruments by using the re-usable materials from dismantling & removal as per good condition of materials as well as new materials to be supplied by APL, conducting pneumatic test for reinforcing pads, preparation of day to day inspection reports as per QAP approved by APL, As Built Drawings, supply of all consumables, labour, machineries & equipments to complete the works as per drawing, specification, standards, codes, scope of works & supply as per instruction of Engineer In-charges of APL including reconciliation of Free Issue Materials (FIM) and returning of surplus / scrap materials to owner’s store
Fabrication, Installation, Inspection & Testing as required for the Nozzles (reinforcing pads covered under plate work) of Stainless Steel Pipes, nozzle flanges, blind/matching flange as per drawing & standards along with gaskets, bolting, valves & other instruments by using the re-usable materials from dismantling & removal as per good condition of materials as well as new materials to be supplied by APL, conducting pneumatic test for reinforcing pads, preparation of day to day inspection reports as per QAP approved by APL, As Built Drawings, supply of all consumables, labour. Machineries & equipments to complete the works as per drawing, specification, standards, codes, scope of works & supply as per instruction of Engineer In-charges of APL including reconciliation of Free Issue Materials (FIM) and returning of surplus / scrap materials to owner’s store
Ecop Entrepreneurs India Private Limited
PAPU CHALIHA
STAR LIGHT
Technomech Services
Technocrats
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .