| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC NO 3 1 327 AUNDIPATTI TALUK ANDIPATTI THENI 625 512 | THENI | TAMIL NADU | 625512 | ₹21.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.6 L+₹18,618.80 (0.87%)Rejected-AOC | ₹21.6 L+₹18,618.80 (0.87%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RANI CONSTRUCTION L2 | Murugan Construction L1 |
|---|---|---|---|---|---|
| 1.00Rural Road Maintenance at Pallipalayam Block in Namakkal District Under Rural Road Maintenance Scheme - 2025 – 2026 PPM - 1 | |||||
| 2.001- Maintance to the road from Elanthakuttai road KM 0/0 -1/900 (R- 04) H/O Elanthakuttai | |||||
| 3.00 | Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | 648 | Sqm | 8 ₹5,184 | 6.2 ₹4,017.6 Lowest |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 62.1 | Cum | 140.45 ₹8,721.95 Lowest | 140.45 ₹8,721.95 Lowest |
| 5.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 6.00 | KM 0/0 -1/00 | 13.94 | Cum | 2,831.32 ₹39,468.6 Lowest | 2,831.32 ₹39,468.6 Lowest |
| 7.00 | KM 1/00 -1/900 | 4.17 | Cum | 2,831.32 ₹11,806.6 Lowest | 2,831.32 ₹11,806.6 Lowest |
| 8.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 174.48 | Sqm | 84.99 ₹14,829.06 Lowest | 84.99 ₹14,829.06 Lowest |
| 9.00 | Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 174.48 | Sqm | 19.63 ₹3,425.04 Lowest | 19.63 ₹3,425.04 Lowest |
| 10.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 59.16 | Sqm | 33.62 ₹1,988.96 Lowest | 33.62 ₹1,988.96 Lowest |
Tender Value
Refer Docs
EMD Value
₹22,140
Closing Date
6 Nov 2025, 3:00 pmClosed
Block Development Officer (B.P) Pallipalayam
Block Development Office , Pallipalayam
Rural Road Maintenance at Pallipalayam Block in Namakkal District Under Rural Road Maintenance Scheme - 2025 2026
2025_RDTN_617141_1
3397/A2/2025
Open Tender
Civil Works
Item Rate
180 days
Pallipalayam
Required as per Schedule
3 documents required · 3 mandatory
₹0
₹22,140
Yes
18 Jun 2026
25 Oct 2025
6 Nov 2025
25 Oct 2025
6 Nov 2025
25 Oct 2025
Amount
Rural Road Maintenance at Pallipalayam Block in Namakkal District Under Rural Road Maintenance Scheme - 2025 – 2026 PPM - 1
1- Maintance to the road from Elanthakuttai road KM 0/0 -1/900 (R- 04) H/O Elanthakuttai
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
2 - Maintance to the road fromVeppadai Kattupalayam road KM 0/00 - 2/00 (R- 32)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
3 - Maintance to the road from NH 47 Senthil Mill to Kottamedu A.D Street (Via) Surutukarar land km 00-1200 km 0/00 - 1/200 (R-162)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Supply and Fixing of H.M Stones etc.,
4 - Maintance to the road from Perumalmalai Road to Roja Nagar Road KM 0/0-0/550 (R- 207)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
5 - Maintance to the road from Kuttikinathur Road to Kapparamalai Kadu Road km 0/0 - 2/500 (R- 225) H/O Pallakkapalayam
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Supply and Fixing of H.M Stones etc.,
Supply and Fixing of K.M Stones etc.,
6 - Maintance to the road from Patharai Ar. Street to Elanthakuttai limit road Km 0/0-1/20 (R-259) H/O Patharai
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Supply and Fixing of H.M Stones etc.,
Supply and Fixing of H.M Stones etc.,
7 - Maintance to the road from Ganapathipalayam Piliyar Koil to Asarikadu Road Km 0/00 - 1/150 (R- 291) H/O Samayasangili Agraharam
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
8 - Maintance to the road from Uppukulam road Km 0/00 - 1/00 ( R-325) H/O Thattankuttai
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Supply and Fixing of H.M Stones etc.,
9 - Maintance to the road from K.M 19/2 of T.Code - KPM Road to Sathiya Nagar (via) Suriyagirimalai Road Km 0/0-1/00 (R -359) H/O Thattankuttai
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Supply and Fixing of H.M Stones etc.,
Supply and Fixing of K.M Stones etc.,
10 - Maintance to the road from Pkbn mill to makkiripalayam road.00-1/200 (R-438) H/O Sowthapuram
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Supply and Fixing of H.M Stones etc.,
Supply and Fixing of K.M Stones etc.,
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RANI CONSTRUCTION (BID ID -1502893)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_737476.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
technicalpit.pdf
Tender Documents • 1.05 MB
BOQ_737476.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .