Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 CrAdmitted-Finance | ₹7.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.5 Cr+₹31.3 L (4.37%)Admitted-Finance 806 8TH FLOOR MULUND WEST NEPTUNE UPTOWN N S ROAD VILLAGE TOWN MULUND CITY MUMBAI MUMBAI MAHARASHTRA 400080 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | ₹7.5 Cr+₹31.3 L (4.37%) | L2 | Admitted-Finance |
| 3 | L3₹7.5 Cr+₹31.6 L (4.41%)Admitted-Finance | ₹7.5 Cr+₹31.6 L (4.41%) | L3 | Admitted-Finance |
| 4 | L4₹7.6 Cr+₹40.9 L (5.70%)Admitted-Finance | ₹7.6 Cr+₹40.9 L (5.70%) | L4 | Admitted-Finance |
| 5 | L5₹7.6 Cr+₹43.2 L (6.02%)Admitted-Finance | ₹7.6 Cr+₹43.2 L (6.02%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aakar Engineers and Contractors L14 | Encee Rail Engineers and Fabricators Pvt Ltd L2 | M/S TRIBHUBAN DAS L9 | Ms Gangadhar Jena L7 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L8 | M/S.Parikshita Chuli and Sons L4 | SHREE BUILDERS L5 | Bidyadhar Swain L3 | PADMABATI INFRAPROJECTS PVT. LTD. L10 | CMRGS INFRASTRUCTURE PROJECTS LIMITED L1 | LAKSHMI BUILDERS L13 | LAXMI ENTERPRISES L6 | TRIKALA INDUSTRIES INDIA PVT LTD L11 | SANJAY KUMAR UPADHYAY L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, port entry fees, tollage etc. complete but excluding GST as directed by the Engineer-In-Charge. | 58,951.56 | Each Sqm | 4 ₹2,35,806.24 | 2 ₹1,17,903.12 | 1.14 ₹67,204.78 | 1.5 ₹88,427.34 | 3 ₹1,76,854.68 | 2 ₹1,17,903.12 | 6.19 ₹3,64,910.16 | 1 ₹58,951.56 Lowest | 10 ₹5,89,515.6 | 10 ₹5,89,515.6 | 59 ₹34,78,142.04 | 10 ₹5,89,515.6 | 12 ₹7,07,418.72 | 390 ₹2,29,91,108.4 |
| 2.00 | Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties,port entry fees etc all complete but excluding GST as directed by EIC | 6,002 | Each Cum | 120 ₹7,20,240 | 140 ₹8,40,280 | 121 ₹7,26,242 | 170 ₹10,20,340 | 150 ₹9,00,300 | 180 ₹10,80,360 | 196 ₹11,76,392 | 110 ₹6,60,220 | 180 ₹10,80,360 | 100 ₹6,00,200 Lowest | 289 ₹17,34,578 | 210 ₹12,60,420 | 175 ₹10,50,350 | 686 ₹41,17,372 |
| 3.00 | Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer Not exceeding 1mtr. with a lead of 8 km,watering ,compacting with VRR to achive optimum moisture content etc all complete including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollag,e port entry fees etc all complete but excluding GST. as directed by EIC.
NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity. | 81,057.66 | Each Cum | 540 ₹4,37,71,136.4 | 360 ₹2,91,80,757.6 | 345 ₹2,79,64,892.7 | 350 ₹2,83,70,181 | 360 ₹2,91,80,757.6 | 300 ₹2,43,17,298 | 231.96 ₹1,88,02,134.81 | 228 ₹1,84,81,146.48 Lowest | 400 ₹3,24,23,064 | 370 ₹2,99,91,334.2 | 389 ₹3,15,31,429.74 | 378 ₹3,06,39,795.48 | 500 ₹4,05,28,830 | 300 ₹2,43,17,298 |
| 4.00 | Excavation of Soil / Excavation of Debris and filling in a low lying area with in a lead of 5 km including rough dressing in layers and compacting with VRR with Supply of all , labour , T&P, hire and running charge of Equipments, transporatation,port entry fees, taxes ,tollage,port entry fees etc all complete but excluding GST. as directed by EIC | 8,957.77 | Each cum | 170 ₹15,22,820.9 | 175 ₹15,67,609.75 | 300 ₹26,87,331 | 350 ₹31,35,219.5 | 240 ₹21,49,864.8 | 250 ₹22,39,442.5 | 196 ₹17,55,722.92 | 230 ₹20,60,287.1 | 175 ₹15,67,609.75 | 100 ₹8,95,777 Lowest | 389 ₹34,84,572.53 | 240 ₹21,49,864.8 | 400 ₹35,83,108 | 420 ₹37,62,263.4 |
| 5.00 | Laying over the prepared subgrade with soiling stones 15cm and above other than granite and laterite broken stone including filling the interstices with moorum and rolling with PRRm maintaining the proper camber etc.with Supply of all material, labour , T&P, hire and running charge of Equipments, transporatation, taxes ,tollage, port entry fees etc all complete but excluding GST. as directed by EIC | 17,686 | Each Cum | 2,050 ₹3,62,56,300 | 1,700 ₹3,00,66,200 | 1,980 ₹3,50,18,280 | 2,100 ₹3,71,40,600 | 2,110 ₹3,73,17,460 | 1,900 ₹3,36,03,400 | 1,961 ₹3,46,82,246 | 2,290 ₹4,05,00,940 | 1,900 ₹3,36,03,400 | 1,500 ₹2,65,29,000 | 2,189 ₹3,87,14,654 | 1,850 ₹3,27,19,100 | 1,450 ₹2,56,44,700 | 1,200 ₹2,12,23,200 Lowest |
| 6.00 | Providing & laying of moorum of approved quality as surface course, watering and compacting with PRR, lifting from stack with supply of all material, labour , T&P, hire and running charge of Equipments, transporatation,port entry fees, taxes ,tollage etc all complete but excluding GST. as directed by EIC | 2,948 | Each Cum | 600 ₹17,68,800 Lowest | 1,050 ₹30,95,400 | 1,600 ₹47,16,800 | 1,220 ₹35,96,560 | 1,176 ₹34,66,848 | 1,200 ₹35,37,600 | 1,169 ₹34,46,212 | 1,100 ₹32,42,800 | 1,750 ₹51,59,000 | 1,100 ₹32,42,800 | 689 ₹20,31,172 | 1,300 ₹38,32,400 | 1,750 ₹51,59,000 | 1,500 ₹44,22,000 |
| 7.00 | Engagement pay loader/ dozer with,hire and running charges, operator expenses,fuel,lubricants with all materials, labour, T&P, taxes, transportation charges, port entry fees etc. but excluding GST all complete and as per direction of Engineer-in-charge.
NB-No idle Charges shall be paid. | 150 | Each Hour | 2,000 ₹3,00,000 | 1,000 ₹1,50,000 | 3,700 ₹5,55,000 | 1,000 ₹1,50,000 | 1,000 ₹1,50,000 | 1,000 ₹1,50,000 | 1,690 ₹2,53,500 | 1,300 ₹1,95,000 | 1,850 ₹2,77,500 | 2,000 ₹3,00,000 | 689 ₹1,03,350 Lowest | 1,500 ₹2,25,000 | 6,250 ₹9,37,500 | 1,500 ₹2,25,000 |
| 8.00 | P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge. | 195.84 | Each Cum | 5,555 ₹10,87,891.2 | 3,000 ₹5,87,520 Lowest | 4,500 ₹8,81,280 | 4,500 ₹8,81,280 | 5,500 ₹10,77,120 | 5,000 ₹9,79,200 | 6,910 ₹13,53,254.4 | 4,800 ₹9,40,032 | 6,500 ₹12,72,960 | 4,000 ₹7,83,360 | 6,889 ₹13,49,141.76 | 5,200 ₹10,18,368 | 5,500 ₹10,77,120 | 6,000 ₹11,75,040 |
| 9.00 | R. C.C. M20 using 12 to 20 mm size C.B.G. chips for all floors, foundation & plinth and superstructure etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting with 40 to 60 mm neddle vibrator, curing with supply of all materials, labour, T&P, taxes, tollage transportations, staging, scaffolding, curing, etc. all complete but excluding GST as per direction of Engineer-in-charge.(excluding cost of reinforcement & bending binding charges) | 634 | Each cum | 7,500 ₹47,55,000 | 4,500 ₹28,53,000 Lowest | 6,000 ₹38,04,000 | 4,950 ₹31,38,300 | 4,800 ₹30,43,200 | 6,000 ₹38,04,000 | 9,160 ₹58,07,440 | 5,800 ₹36,77,200 | 7,500 ₹47,55,000 | 5,000 ₹31,70,000 | 8,889 ₹56,35,626 | 7,250 ₹45,96,500 | 7,500 ₹47,55,000 | 8,200 ₹51,98,800 |
| 10.00 | Supply Tor/TMT steel manufactured by SAIL/TISCON/ VIZAG Steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wire of 18 to 20 gauge including supply of steel, labour,materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient). | 634 | Each Qntl | 9,000 ₹57,06,000 | 8,000 ₹50,72,000 | 9,500 ₹60,23,000 | 7,300 ₹46,28,200 | 7,500 ₹47,55,000 | 8,600 ₹54,52,400 | 9,160 ₹58,07,440 | 6,200 ₹39,30,800 | 8,700 ₹55,15,800 | 7,000 ₹44,38,000 | 8,889 ₹56,35,626 | 7,500 ₹47,55,000 | 7,500 ₹47,55,000 | 975 ₹6,18,150 Lowest |
Tender Value
₹9.8 Cr
EMD Value
₹19.6 L
Closing Date
30 Sept 2022, 5:15 pmClosed
JAMINI KANTA MOHANTY,EE,HWD-III,PPA
JAMINI KANTA MOHANTY,EE,HWD-III,PPA
Development of Plot adjacent to Bulb Road (Right Side) near Gate No-1
2022_MoS_711474_1
CE/HWDIII/ACCTS-11/22/136
Open Tender
Civil Works
Works
240 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹19.6 L
Yes
23 Nov 2022
9 Sept 2022
3 Oct 2022
9 Sept 2022
30 Sept 2022
9 Sept 2022
Amount
Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, port entry fees, tollage etc. complete but excluding GST as directed by the Engineer-In-Charge.
Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply of all material labour transporation , taxes , tollage , royalties,port entry fees etc all complete but excluding GST as directed by EIC
Filling the low laying area with saline sand or dreged spoil as per required level in layer wise ,each layer Not exceeding 1mtr. with a lead of 8 km,watering ,compacting with VRR to achive optimum moisture content etc all complete including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollag,e port entry fees etc all complete but excluding GST. as directed by EIC. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity.
Excavation of Soil / Excavation of Debris and filling in a low lying area with in a lead of 5 km including rough dressing in layers and compacting with VRR with Supply of all , labour , T&P, hire and running charge of Equipments, transporatation,port entry fees, taxes ,tollage,port entry fees etc all complete but excluding GST. as directed by EIC
Laying over the prepared subgrade with soiling stones 15cm and above other than granite and laterite broken stone including filling the interstices with moorum and rolling with PRRm maintaining the proper camber etc.with Supply of all material, labour , T&P, hire and running charge of Equipments, transporatation, taxes ,tollage, port entry fees etc all complete but excluding GST. as directed by EIC
Providing & laying of moorum of approved quality as surface course, watering and compacting with PRR, lifting from stack with supply of all material, labour , T&P, hire and running charge of Equipments, transporatation,port entry fees, taxes ,tollage etc all complete but excluding GST. as directed by EIC
Engagement pay loader/ dozer with,hire and running charges, operator expenses,fuel,lubricants with all materials, labour, T&P, taxes, transportation charges, port entry fees etc. but excluding GST all complete and as per direction of Engineer-in-charge. NB-No idle Charges shall be paid.
P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge.
R. C.C. M20 using 12 to 20 mm size C.B.G. chips for all floors, foundation & plinth and superstructure etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting with 40 to 60 mm neddle vibrator, curing with supply of all materials, labour, T&P, taxes, tollage transportations, staging, scaffolding, curing, etc. all complete but excluding GST as per direction of Engineer-in-charge.(excluding cost of reinforcement & bending binding charges)
Supply Tor/TMT steel manufactured by SAIL/TISCON/ VIZAG Steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wire of 18 to 20 gauge including supply of steel, labour,materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient).
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge
Foundation & Plinth
Dismantling and removing R.C.C. columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris within 50m cleaning the debrises with with supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, tollage, royalties,port entry fees etc. complete but excluding GST & as per direction of Engineer-in-charge all taxes, including leads & lifts transportation & disposing at specified place and as per direction of Engineer-in-charge.
Encee Rail Engineers and Fabricators Pvt Ltd
Bidyadhar Swain
M/S.Parikshita Chuli and Sons
SHREE BUILDERS
LAXMI ENTERPRISES
Ms Gangadhar Jena
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
M/S TRIBHUBAN DAS
PADMABATI INFRAPROJECTS PVT. LTD.
TRIKALA INDUSTRIES INDIA PVT LTD
SANJAY KUMAR UPADHYAY
LAKSHMI BUILDERS
Aakar Engineers and Contractors
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_748469.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .