Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹22.8 Cr
EMD Value
₹12.9 L
Closing Date
16 Jan 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
GSU/II
16 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Failure in submission of this statement will lead to summary rejection of offer.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing.
However, if required in tender documents by way of Special Conditions, a formal agreement duly notarized, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard GeneralC conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2. In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of 1.1.1 credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials 4. In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work.
The" Similar Work " is defined as "Any RCC/PSC Work." Failure in submission of completion certificate/s and other documents as per aforementioned clauses will lead to summary rejection of offer.
43 conditions · 13 needing a document upload
If the earnest Money deposited by the bidder is in shape of Bank Guarantee, it should be prepared in favour of "FA&CAO/C/NCR" on non-Judicial Stamp paper having stamp duty of 0.5% of the BG value subject to a maximum of Rs. 10,000/-, failing which the bid will be summarily rejected
Tenderer must submit list of Plants & Machinery available on hand (own) and proposed to be inducted and hired for the tendered work
Tenderer must submit list of Personnel/ Organization available on hand and proposed to be engaged for the tendered work in proforma.
Tenderer must submit an undertaking that neither I / We (name of the sole Proprietor Firm / Partnership Firm /Limited Company / LLP / Registered Society / Trust / JV firm) nor any of the partner or partnership firm / LLP /Member of Registered Society / Trust / Constituent of JV firm including partner of partnership firm in JV has / have been black listed or debarred by Railway or any other Ministry / Department / Public Sector Undertaking of the Government of India / any State Govt. from participation in tenders / contracts as on the date of opening of bids,either in our individual capacity or in any firm in which we were / are partners. Concealment / wrong information inregard to above shall make the contract liable fordetermination under Clause 62 of the General Conditions of Contract. Offer will be summarily rejected in case of non-submission of such document.
An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information inregard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract
I/ We have visited the works site and I/ We am /are aware of the site conditions.
All documents signed by CA should mandatorily have Unique Document Identification Number (UDIN) on the document. The document uploaded should be verifiable from UDIN portal by entering UDIN mentioned on document. Failing this, document shall not be considered for evaluation.
The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. For consideration of balance sheet of the fourth previous year, a certificate stating that the balance sheet of the previous year is yet to be prepared/ audited certified by the Chartered Accountant shall be submitted. Without this certificate, balance sheet of the fourth previous year shall not be considered.
Please submit bank details of the firm / individual/ JV / partnership etc. i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number and other necessary & relevant documents.
Please furnish statement of deviations from tender conditions, if any.
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.
Please furnish documents in support of your claim to fulfill the eligibility criteria as mentioned in the tender documents. Each page of the copy of documents / certificates in support of credentials, submitted by the you, shall be self-attested / digitally signed by the you or authorized representative of the your firm. Only those documents which are declared explicitly by you as "documents supporting the claim of qualifying the laid down eligibility criteria", will be considered for evaluating the offer or otherwise available in the offer.
Requisite documents proving technical eligibility criteria and financial eligibility criteria has been uploaded along with those required as per explanation given in clause 10 of IRGCC-2022 (Works Matter).
Tenderers who is/are not borne on the approved list of the contractors of North Central Railway shall submit along with his/their tender as per clause 11 of IRGCC-2022 (Works Matter), as applicable.
All requisite valid documents regarding constitution of business of the bidding firm should be submitted along with the tender as per clause 14 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Joint Venture firms, if applicable in the instant tender, should submit all valid requisite documents and fulfil the stipulations as per clause 17 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Partnership firms, if bidding for the instant tender, should submit all valid requisite documents and fulfil the stipulations as per clause 18 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority. If any Tax/Royalty/Octori is quoted extra, the same will neither be considered for evaluation of the tender nor will be paid. However any changes in rate of taxes or any new tax /cess on Works Contract will be dealt according to clause 37 of IRGCC-2022 (Works Matter).
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, availability of labour etc. that may be encountered in course of execution of work.
Tenderer should see the website for the corrigendum/addendum to the NIT/tender document, if any that may be uploaded prior to tender opening (inclusive) as there will not be any separate communication for that.
The tenderer for carrying any construction work in Uttar Pradesh must get themselves registered from the registering Officer under Section - 7 of the Building and Other Construction Workers Act, 1996 and rules made there-to by the Uttar Pradesh Govt. and submit certificate of Registration (Labour Department). For enactment of this Act, the tenderer shall be required to pay cess @ 1% of cost of construction work to be deducted from each bill.
The contractor(s) shall observe all the formalities, perform all the acts and abide by all the provisions contained in the Contract Labour Act-1970 and Contract Labour Central Rules, 1971 which in addition to other stipulations provides that the contractor(s) shall obtain license(s) from appropriate licensing officer of the area before commencement of the work and shall produce a copy thereof along with the original to the Railway office, which will be returned to the contractor after verification.
If any complaint is received against the contractor regarding violation of contract laws, (exposing Principal Employer to the risk of legal proceedings under labour laws), the guilty contractor will be black listed and their contract shall be terminated following the due procedure, apart from initiating criminal proceedings against him with the help of Labour department officials. (Authority: RB letter no.2008/E (LI)/AT/CNR/3, dated 24.01.2018).
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening. IRGCC-2022 (works matter) is for reference only. Any correction issued by competent authority up to date of opening will be applicable. Tenderer should quote accordingly.
Though no minimum eligibility criteria is specified for tenders below Rs. 50.00 Lakhs, tenderers are advised to upload documents so that their financial capacity, capability & past performance to undertake the tendered work can be adjudged during evaluation of their offer. Documents testifying tenderer previous experience for the type of job for which tender is invited with list of works carried out in the past and financial status should be produced along with the tender.
The provision of Construction and Demolition Waste Management Rule 2016 issued by Ministry of Environment Forest and Climate Change dated 29.03.2016 and published in the Gazette of India, Part - II, Section -3, Sub-section (ii) are binding upon the Contractor. Contractor shall implement these provisions at worksites, for which no extra payment will be payable.
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-A. Non submission of above certificate by the bidder shall result in summarily rejection of his/their bid.
It is to be noted that tenderer digital signature on the E-Tender form will be considered as confirmation that tenderer have read and accepted all the conditions laid down in the documents as well as related specification of items,schedule & quantity of items in the tender, consisting of techno-commercial offer form (including special conditions attached to E-Tender) and Financial offer form, unless specific deviation is quoted in the techno- commercial offer form.
The quantities shown in the attached Schedule are given as a guide and are approximate only and are as a guide to give the tenderer(s) an idea of quantum of work involved. Quantities are subject to variation according to the needs of the Railway. The Railway does not guarantee work under each item of the Schedule. The Railway reserves the right to increase/ decrease and/or delete or include any of the quantities given above and no extra rate will be allowed on this account.
In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Earnest Money Deposit besides banning of business for a period of upto five years. In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Earnest Money Deposit (EMD), Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto five years.
The tenderer has to submit necessary documents in compliance of clause 10 to 18 (Part-I) of IRGCC 2022 (Works matter) mandatorily, otherwise offer will be considered as Incomplete Offer and accordingly shall not be considered.
The attached ESP is tentative and may change during approval by railways.
Construction of Island High level platform between Line 13 & 16 by dismantling line no. 14 & 15 at Prayagraj Chheoki station along with provision of Ballast Less track on line no. 13 & 16.
DYCE-II-GSU-PRYJ-12-2025~NCR
DYCE-II-GSU-PRYJ-12-2025
Open
Works - General
8 Months
Prayagraj, Uttar Pradesh
₹0
₹12.9 L
16 Jan 2026
24 Dec 2025
2 Jan 2026
167 items across 3 schedules · ₹4,92,38,301.68 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Providing portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately. | — | — | — | — | |
| 1 | With provision of one 50mm wide retro- reflective tape in horizontal direction, duly secured/tight with vertical posts. | Metre | 4000.00 | 237.69 | 9,50,760 |
| Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required. | — | — | — | — | |
| 2 | With two coats of Aluminium paint in dual containers conforming to IS:2339 with DFT of 15 - 20 Microns for each coat. | Sqm | 10000.00 | 93.17 | 9,31,700 |
| Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in-charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block. | — | — | — | — | |
| 3 | For Casual/Scattered Rail Renewal work | RM | 4000.00 | 33.06 | 1,32,240 |
| Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in-Charge. Note: Rail drilling and cutting to be paid separately. | — | — | — | — | |
| 4 | For Casual/Scattered Rail Renewal work | RM | 2000.00 | 34.99 | 69,980 |
| 5 | Lubrication of Elastic Rail Clips on PSC sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as per procedure prescribed in latest edition of IRPWM. | ERC | 14000.00 | 2.77 | 38,780 |
| Cutting / cropping of rail of 60Kg - 90 UTS, manually and perfectly vertical with contractor's labour, hacksaw blade and tools & plants - Note: 1.Manual cutting should be used only in emergencies with prior permission of sectional ADEN where machine cutting can not be arranged in time. 2. Cutting of Rails with blade and forcing to part by using other means to break the rails is prohibited. 3.Rails should be cut right through hacksaw blades only. | — | — | — | — | |
| 6 | In-situ situation | Each | 100.00 | 455.33 | 45,533 |
| Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge : | — | — | — | — | |
| 7 | Rail section of 90R and below | Each | 600.00 | 88.59 | 53,154 |
| 8 | Rail section of 52Kg and above | Each | 200.00 | 106.31 | 21,262 |
| Under Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed. Note: 1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location. 2. Rail cutting will be paid extra under relevant item. 3. Laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item. | — | — | — | — | |
| 9 | 1 in 8½ Turnout (Under Traffic Block) | Set | 3.00 | 28,561.89 | 85,685.67 |
| Under conditions not requiring Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed - Note: 1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location. 2. Rail cutting will be paid extra under relevant item. 3. Laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item. | — | — | — | — | |
| 10 | 1 in 8½ Turnout (Under conditions not requiring Traffic Block). | Set | 1.00 | 22,761 | 22,761 |
| 11 | Derailing Switch (Under conditions not requiring Traffic Block). | Set | 6.00 | 5,201.9 | 31,211.4 |
| Assembling all types of Switches on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified locations, duly leading rails, special sleepers, switches with a maximum lead of 500m, all lift & crossing of track as required including cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including lubrication of fittings/fastenings, complete in all respect. Note: Required P.Way fittings shall be supplied at SSE/P.Way stores. | — | — | — | — | |
| 12 | 1 in 12 Turnouts | Set | 1.00 | 19,164.42 | 19,164.42 |
| 13 | Derailing Switch | Set | 1.00 | 7,834.91 | 7,834.91 |
| Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in- charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores. | — | — | — | — | |
| 14 | 1 in 12 Turnouts | Set | 1.00 | 63,270.87 | 63,270.87 |
| 15 | Derailing Switch | Set | 1.00 | 13,550.81 | 13,550.81 |
| Laying and linking all types of turnouts, diamond crossings and Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on ballast bed, prepared after dismantling & removal of existing turnout/normal line during TTR/yard remodeling under traffic block, as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastening, complete as directed by Engineer in-charge. Note: Payment for dismantling & removal of existing turnout/normal line, transportation/stacking of released material and preparing of ballast bed is not included in this item and shall be paid under relevant item. | — | — | — | — | |
| 16 | 1 in 12 Turnouts | Set | 1.00 | 51,541.43 | 51,541.43 |
| 17 | Derailing Switch | Set | 1.00 | 9,983.99 | 9,983.99 |
| Assembling on temporary staging and insertion of all types of switches including TWS on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC s l e e p e r s with Railways rails/sleepers available within 250m as per standard drawing, duly leading sleepers, rails, switches, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling etc. including preparation for operation of traffic block, including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed lubrication of fittings/fastenings, complete as directed by Engineer in-charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores. | — | — | — | — | |
| 18 | 1 in 12 Turnouts | Set | 1.00 | 21,864.63 | 21,864.63 |
| Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS- GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully. | — | — | — | — | |
| 19 | When distance of nearest quarry is more than 50 km and up to 100 km | cum | 200.00 | 1,497.48 | 2,99,496 |
| Providing Centre Line / Rail Level, reference Pegs on formation at an interval of 30 metres on one side or at centre of proposed / existing track, as directed by engineer in-charge for linking of new track / CTR / Deep Screening / Lifting / Lowering works, duly embedding in formation including marking with contractor's paint. Note: (1) Rails/tie bar of suitable size bar shall be supplied by the Railways from nearest Stores Depot. In case of hard wood peg, the hard wood will be supplied by the contractor. (2) Excavation and concrete work, if required, will be paid separately. | — | — | — | — | |
| 20 | With contractor's hard wood pegs of 50 mm dia and 60 cm long | Each | 70.00 | 122.77 | 8,593.9 |
| 21 | Installation of reference points for track centre line in main and loop lines, in straight or curve portion, SRJ for turnouts, heel of crossing (HOC), locations of derailing switches, switch expansion joints etc. away from formation on firm ground at known offset with MS Angles of 50mmx50mmx5mm thick of length 1.80 m each, founded in concrete block of size 30cm x 30cm x 45cm of nominal mix 1:3:6, including painting to reference pegs with two coats of enamel paints on exposed surface, as directed by Engineer In charge. Note: Earth work and Cement concrete will be paid under relevant items. | Each | 20.00 | 497.76 | 9,955.2 |
| 22 | Spreading of ballast, from existing stacks available along formation on top or at c e s s , in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. | cum | 200.00 | 45.58 | 9,116 |
| Linking of BG track (except at LC, Bridges and SEJs) with any type of rail section and sleeper of specified density, on ballast bed spread and compacted with suitable roller, over prepared formation including leading free rails/welded panels available along the alignment on to formation, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. | — | — | — | — | |
| 23 | For sleeper density of 1540 sleepers per km | TRM | 1500.00 | 240.15 | 3,60,225 |
| Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual | — | — | — | — | |
| 24 | For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more | TRM | 1000.00 | 96.79 | 96,790 |
| 25 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish p l a t e s duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 30.00 | 1,685.87 | 50,576.1 |
| Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM. | — | — | — | — | |
| 26 | For 60 Kg Rails | RM | 2000.00 | 53.3 | 1,06,600 |
| Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) | — | — | — | — | |
| 27 | 60 Kg - 110/90 UTS - Outside Track | Each | 50.00 | 258.52 | 12,926 |
| Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. | — | — | — | — | |
| 28 | Outside Track | Each | 100.00 | 47.01 | 4,701 |
| Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre. | — | — | — | — | |
| 29 | In wagons during period of traffic block where handling by mechanical means is not possible | MT | 100.00 | 321.85 | 32,185 |
| Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period. | — | — | — | — | |
| 30 | For lead up to 500 metre. | MT | 240.00 | 356.93 | 85,663.2 |
| 31 | For lead beyond 500 metre and up to 1 Km. | MT | 240.00 | 459.92 | 1,10,380.8 |
| 32 | Extra to Item no. 171031 and 171032 with contractor's Rail Dolly / Dip Lorry | MT | 240.00 | 12.81 | 3,074.4 |
| Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres. | — | — | — | — | |
| 33 | For lead up to 500 metres | MT | 500.00 | 277.85 | 1,38,925 |
| 34 | For lead beyond 500 metre and up to 1 Km | MT | 500.00 | 411.36 | 2,05,680 |
| 35 | Extra to Item no. 172031 and 172032 with contractor's Rail Dolly/Dip Lorry. | MT | 500.00 | 14.44 | 7,220 |
| Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres. | — | — | — | — | |
| 36 | From Truck / Trailer | MT | 100.00 | 117.93 | 11,793 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 37 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 200.00 | 794.59 | 1,58,918 |
| 38 | Hydra or similar tyre mounted Pick-n- Carry crane of 12T capacity for misc. works of handling of material | Hour | 200.00 | 942.83 | 1,88,566 |
| 39 | Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | Day | 200.00 | 651.58 | 1,30,316 |
| Schedule total | ₹46,01,978.73 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .